986 resultados para Delayed ovulation
Resumo:
通过92Mo(58Ni,2p3n)熔合蒸发反应生成了非常缺中子核145Er。利用氦喷嘴带传输系统把研究目标核传输到低本底测量站,进行了质子-γ符合测量,得到了不受同量异位素干扰的145Er的β延发质子谱。经过仔细分析与延发质子符合的γ谱,发现了145Er的11/2-同核异能态具有β延发质子衰变性质。经拟合退激144Dy不同激发态γ跃迁的衰变曲线,得出145Er的1/2+基态和11/2-同核异能态的半衰期分别为(1.6±0.6)和(0.6±0.1)s。最后,简单介绍了中重质量区缺中子新核素的合成及衰变研究计划。
Resumo:
The effects of the timing of initial feeding (0, 1, 2 3 and 4 days after yolk exhaustion) and temperature (15, 18 and 21degrees C) on the point-of-no-return (PNR), survival and growth of laboratory-reared Japanese flounder Paralichthys olivaceus larvae were studied under controlled conditions. The larvae reached PNR on 7(.)7, 5(.)2 and 4(.)2 days-post-hatching (dph) at 15, 18 and 2 V C, respectively. At each temperature, larval growth did not differ significantly among the delayed initial feedings 1 day before PNR but decreased significantly in larvae first fed after that. In the treatments where initial feeding was equally delayed, larvae grew significantly faster at 18 and 21degrees C than at 15degrees C. The larvae survived apparently better at 15 and 18degrees C than at 21degrees C when initial feeding was equally delayed. At each temperature, survival of the larvae first fed before PNR did not differ noticeably, while delayed initial feeding after that apparently reduced their survival. These results indicated that there existed a negatively temperature-dependent PNR in the Japanese flounder larvae. Survival and growth of the larvae strongly depended on temperature as well as the timing of initial feeding. High temperature accelerated the yolk exhaustion and growth of the larvae and thus reduced their starvation tolerance and survival. To avoid potential starvation mortality and obtain good growth, the Japanese flounder larvae must establish successful initial feeding within 2 days after yolk exhaustion at 15degrees C and within 1 day at both 18 and 21degrees C. (C) 2005 The Fisheries Society of the British Isles.
Resumo:
The effects of the timing of first feeding (0, 1 and 2 days after yolk exhaustion) and starvation on the point-of-no-return (PNR), survival and growth of laboratory-reared rock bream larvae were studied under controlled conditions. Larvae began to feed exogenously at 3 days after hatching (dah) and reached PNR on 54 h after yolk exhaustion at 22 +/- 1.5 degrees C. Larvae growth was significantly affected by the time of first exogenous feeding. The growth of 0 day delayed first feeding larvae was obviously faster than those of the other delayed first feeding larvae (P<0.05) whether at 7 dab (SL=3.40 mm, SGR=5.7, CV=4.0) or at 15 dah (SL=4.85 mm, SGR=6.1, CV=8.2) with a more uniform size distribution. Survival of 0 day delayed first feeding larvae and I day delayed first feeding larvae was 13% and 8% at the end of experiment, respectively, while no larvae survived up to 7 dah for 2 days delayed first feeding larvae and unfed larvae. Food resulted in a progressive deterioration of the larval digestive system and atrophy of skeletal muscle fibre. The ratios of head length to SL (standard length), body height to SL and eye diameter to SL were the most sensitive morphometric indices to detect the effects of fasting on larval condition. Present results showed that the combination of morphological and morphometric variables could be used to evaluate the nutritional condition of rock bream larvae. In order to avoid the potential mortality and gain better development, survival and growth in industrial production, the rock bream larvae must establish successful first feeding within 2 days after yolk exhaustion. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
I. Miguel and Q. Shen. Exhibiting the behaviour of time-delayed systems via an extension to qualitative simulation. IEEE Transactions on Systems, Man and Cybernetics, Part A: Systems and Humans, 35(2):298-305, 2005.
Resumo:
This paper presents an algorithm which extends the relatively new notion of speculative concurrency control by delaying the commitment of transactions, thus allowing other conflicting transactions to continue execution and commit rather than restart. This algorithm propagates uncommitted data to other outstanding transactions thus allowing more speculative schedules to be considered. The algorithm is shown always to find a serializable schedule, and to avoid cascading aborts. Like speculative concurrency control, it considers strictly more schedules than traditional concurrency control algorithms. Further work is needed to determine which of these speculative methods performs better on actual transaction loads.
Resumo:
Simultaneous measurements of high-altitude optical emissions and magnetic fields produced by sprite-associated lightning discharges enable a close examination of the link between low-altitude lightning processes and high-altitude sprite processes. We report results of the coordinated analysis of high-speed sprite video and wideband magnetic field measurements recorded simultaneously at Yucca Ridge Field Station and Duke University. From June to August 2005, sprites were detected following 67 lightning strokes, all of which had positive polarity. Our data showed that 46% of the 83 discrete sprite events in these sequences initiated more than 10 ms after the lightning return stroke, and we focus on these delayed sprites in this work. All delayed sprites were preceded by continuing current moments that averaged at least 11 kA km between the return stroke and sprites. The total lightning charge moment change at sprite initiation varied from 600 to 18,600 C km, and the minimum value to initiate long-delayed sprites ranged from 600 for 15 ms delay to 2000 C km for more than 120 ms delay. We numerically simulated electric fields at altitudes above these lightning discharges and found that the maximum normalized electric fields are essentially the same as fields that produce short-delayed sprites. Both estimated and simulation-predicted sprite initiation altitudes indicate that long-delayed sprites generally initiate around 5 km lower than short-delayed sprites. The simulation results also reveal that slow (5-20 ms) intensifications in continuing current can play a major role in initiating delayed sprites. Copyright 2008 by the American Geophysical Union.
Resumo:
Fixed dose combination abacavir/lamivudine/zidovudine (ABC/3TC/ZDV) among HIV-1 and tuberculosis (TB)-coinfected patients was evaluated and outcomes between early vs. delayed initiation were compared. In a randomized, pilot study conducted in the Kilimanjaro Region of Tanzania, HIV-infected inpatients with smear-positive TB and total lymphocyte count <1200/mm(3) were randomized to initiate ABC/3TC/ZDV either 2 (early) or 8 (delayed) weeks after commencing antituberculosis therapy and were followed for 104 weeks. Of 94 patients screened, 70 enrolled (41% female, median CD4 count 103 cells/mm(3)), and 33 in each group completed 104 weeks. Two deaths and 12 serious adverse events (SAEs) were observed in the early arm vs. one death, one clinical failure, and seven SAEs in the delayed arm (p = 0.6012 for time to first grade 3/4 event, SAE, or death). CD4 cell increases were +331 and +328 cells/mm(3), respectively. TB-immune reconstitution inflammatory syndromes (TB-IRIS) were not observed in any subject. Using intent-to-treat (ITT), missing = failure analyses, 74% (26/35) vs. 89% (31/35) randomized to early vs. delayed therapy had HIV RNA levels <400 copies/ml at 104 weeks (p = 0.2182) and 66% (23/35) vs. 74% (26/35), respectively, had HIV RNA levels <50 copies/ml (p = 0.6026). In an analysis in which switches from ABC/3TC/ZDV = failure, those receiving early therapy were less likely to be suppressed to <400 copies/ml [60% (21/35) vs. 86% (30/35), p = 0.030]. TB-IRIS was not observed among the 70 coinfected subjects beginning antiretroviral treatment. ABC/3TC/ZDV was well tolerated and resulted in steady immunologic improvement. Rates of virologic suppression were similar between early and delayed treatment strategies with triple nucleoside regimens when substitutions were allowed.
Resumo:
We consider the optimum design of pilot-symbol-assisted modulation (PSAM) schemes with feedback. The received signal is periodically fed back to the transmitter through a noiseless delayed link and the time-varying channel is modeled as a Gauss-Markov process. We optimize a lower bound on the channel capacity which incorporates the PSAM parameters and Kalman-based channel estimation and prediction. The parameters available for the capacity optimization are the data power adaptation strategy, pilot spacing and pilot power ratio, subject to an average power constraint. Compared to the optimized open-loop PSAM (i.e., the case where no feedback is provided from the receiver), our results show that even in the presence of feedback delay, the optimized power adaptation provides higher information rates at low signal-to-noise ratios (SNR) in medium-rate fading channels. However, in fast fading channels, even the presence of modest feedback delay dissipates the advantages of power adaptation.
Resumo:
Recent research on the delayed failure of cuttings in clay clearly recognises and predicts progressive delayed failure of deep cuttings. This is due to a combination of strain-softening, weathering, dissipation of negative excess pore water pressure generated at the time of excavation, and frequent occurrence of prolonged periods of wet weather. There have been several slope failures of this kind in Northern Ireland. This paper discusses a case study based on a failure of a deep cutting, excavated at a slope of 1 in 2, on the A1 near Dromore (County Down) in Northern Ireland. The cutting was in lodgement till, a stiff, heavily overconsolidated clay. The failure occurred approximately 30 years after the cutting was excavated, following a prolonged period of heavy rainfall. An analysis of the failure, together with laboratory test data on soil samples taken from the site, confirmed that by using long-term soil strength parameters the factor of safety of this slope was unity. The conclusion of the analysis is that slopes excavated in this soil should be designed (and assessed) on long-term strength parameters.