756 resultados para Construction industry Costs
Resumo:
Demonstration Projects are an initiative developed in response to demands presented in the 1998 Egan Report. Scotland has witnessed an attempt to keep the momentum and the so called Demonstration Projects Team at the University of Dundee was introduced in late 2003. The team’s responsibility was to revitalise and restructure Scottish Demonstration Projects. These are now a major initiative within the newly established Scottish Construction Innovation and Excellence Centre, a part of Scottish Construction Forum that is an umbrella organisation funded by the Scottish Executive through Scottish Enterprise Glasgow.
Resumo:
Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.
Resumo:
Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.
Resumo:
The link between competitiveness and sustained prosperity of a nation, industry or firm, is a well established argument and serves as the basis for making policy decisions and directing strategic change. The importance of construction industry competitiveness is currently receiving considerable attention from countries such as Finland, Sweden and the UK. This paper critically reviews the existing measures of competitiveness, challenges productivity and profitability as the dominant measures of construction industry competitiveness and introduces a more holistic set of measures that addresses the needs of investors, employees, clients and overall society. The research also reports upon the application of this more holistic set of measures for measuring competitiveness and presents results for the Swedish construction industry. The paper principally sets out to present the preliminary findings of an ongoing research project, which will eventually compare the competitiveness of the Swedish construction industry with that of Finland and the UK.
Resumo:
The desirable coverage of the journal is considered including the need to focus on research which can lead to positive action. Criteria for establishing the desirability of research projects are proposed and these are then applied first, to four broad issues and, secondly, to the inputs and other requirements for a well functioning industry. Some conclusions are drawn as to the research most likely to enable action to be taken to improve the industry. It is found that certain other difficulties can sometimes be dealt with by experimentation with actual projects or, where there is consensus on desirable action, by bringing pressure to bear on those able to initiate change.