996 resultados para Construction, Australia


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Before the Global Financial Crisis many providers of finance had growth mandates and actively pursued development finance deals as a way of gaining higher returns on funds with regular capital turnover and re-investment possible. This was able to be achieved through high gearing and low presales in a strong market. As asset prices fell, loan covenants breached and memories of the 1990’s returned, banks rapidly adjusted their risk appetite via retraction of gearing and expansion of presale requirements. Early signs of loosening in bank credit policy are emerging, however parties seeking development finance are faced with a severely reduced number of institutions from which to source funding. The few institutions that are lending are filtering out only the best credit risks by way of constrictive credit conditions including: low loan to value ratios, the corresponding requirement to contribute high levels of equity, lack of support in non-prime locations and the requirement for only borrowers with well established track records. In this risk averse and capital constrained environment, the ability of developers to proceed with real estate developments is still being constrained by their inability to obtain project finance. This paper will examine the pre and post GFC development finance environment. It will identify the key lending criteria relevant to real estate development finance and will detail the related changes to credit policies over this period. The associated impact to real estate development projects will be presented, highlighting the significant constraint to supply that the inability to obtain finance poses.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: With the increasing interest in Public Private Partnership (PPP) there is a need to investigate the factors contributing to successful delivery of PPP projects. Design/methodology/approach: An empirical questionnaire survey was conducted in Hong Kong and Australia. The survey respondents were asked to rate eighteen factors which contribute to delivering successful PPP projects. Findings: The findings from this survey were further compared with the results achieved by a previous researcher (Li, 2003) in a similar survey conducted in the United Kingdom. The comparison showed that amongst the top five success factors ranked by Hong Kong respondents, three were also ranked highly by the Australians and British. These success factors included: ‘Commitment and responsibility of public and private sectors’; ‘Strong and good private consortium’; and ‘Appropriate risk allocation and risk sharing’. Originality/value: These success factors were therefore found to be important for contributing to successful PPP projects irrespective of geographical locations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Radioactive wastes are by-products of the use of radiation technologies. As with many technologies, the wastes are required to be disposed of in a safe manner so as to minimise risk to human health. This study examines the requirements for a hypothetical repository and develops techniques for decision making to permit the establishment of a shallow ground burial facility to receive an inventory of low-level radioactive wastes. Australia’s overall inventory is used as an example. Essential and desirable siting criteria are developed and applied to Australia's Northern Territory resulting in the selection of three candidate sites for laboratory investigations into soil behaviour. The essential quantifiable factors which govern radionuclide migration and ultimately influence radiation doses following facility closure are reviewed. Simplified batch and column procedures were developed to enable laboratory determination of distribution and retardation coefficient values for use in one-dimensional advection-dispersion transport equations. Batch and column experiments were conducted with Australian soils sampled from the three identified candidate sites using a radionuclide representative of the current national low-level radioactive waste inventory. The experimental results are discussed and site soil performance compared. The experimental results are subsequently used to compare the relative radiation health risks between each of the three sites investigated. A recommendation is made as to the preferred site to construct an engineered near-surface burial facility to receive the Australian low-level radioactive waste inventory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Estimated 640,700 persons suffered a work-related injury or illness in 2009-2010 and 444 lost their lives as a result in 2008-2009, in Australia Very little is known about what proportion of accidents are directly attributable to the effects of AOD Anecdotal evidence highlights issues of AOD and its association with safety risk on construction sites

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aileen Moreton-Robinson has brought together scholars from a range of disciplines: philosophy, cultural and gender studies, education, social work, sociology and literary studies. All engage critically with the location of the social and discursive construction of whiteness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Construction Industry Forum (which is a peak industry association) and the Australian Procurement and Construction Council (which is a peak government organisation) have jointly agreed on a set of KPIs for the Australian Construction Industry. The goal of such a process is to work collaboratively in order to lift industry performance overall, and thereby bring about economic and social benefits to the industry and broader community. This paper seeks to underpin the process of KPI measurement by providing: an overview of international approaches to KPI measurement, summary of difficulties identified in performance measurement together with possible responses to these problems, and finally a discussion on the various methods for reporting KPIs. A number of findings throughout the paper, based on the review, made in order to advance the goal of performance measurement in the construction industry in Australia. Such findings would be relevant to other countries considering a KPI measurement process as well.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2005, 17.3% of Australians were aged 60 years and older according to the Australian Bureau of statistics (ABS). According to aBS this situation mirrors the poulation profile of other developed countries such as Canada, New Zealand, the United States of America and to some extent the United Kingdom (ABS). Self contained independent living units in retirement Villages are now contributing to the dwellings available for those aged 55 years and over in Australia and the retirement village sector has become a significant sector within the residential property market. However, the method of operaton of many retirement villages, and the lack of freehold tenure, impacts on the desireability of retirement village life to potential residents. This paper focuses on sustainability from the perspective of the ongoing viability of retirement village operations in light of the impact of land tenure and operational issues on the perceptions of potential residents.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.