966 resultados para Collaboration patterns Universities
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
The application of Information and Communication Technology (ICT) in construction industry has been recognised widely by some practitioners and researchers for the last several years. During the 1990s the international construction industry started using with the increasing confidence information and communication technology. The use of e-mail became usual and web-sites were established for marketing purposes. Intranets and extranets were also established to facilitate communication within companies and throughout their branches. One of the important applications of the ICT in construction industry was the use of mobile computing devices to achieve better communication and data transmission between construction sites and offices.
Resumo:
Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.
Resumo:
One of the perceived Achilles heels of online citizen journalism is its perceived inability to conduct investigative and first-hand reporting. A number of projects have recently addressed this problem, with varying success: the U.S.-based Assignment Zero was described as "a highly satisfying failure" (Howe 2007), while the German MyHeimat.de appears to have been thoroughly successful in attracting a strong community of contributors, even to the point of being able to generate print versions of its content, distributed free of charge to households in selected German cities. In Australia, citizen journalism played a prominent part in covering the federal elections held on 24 November 2007; news bloggers and public opinion Websites provided a strong counterpoint to the mainstream media coverage of the election campaign (Bruns et al., 2007). Youdecide2007.org, a collaboration between researchers at Queensland University of Technology and media practitioners at the public service broadcaster SBS, the public opinion site On Line Opinion, and technology company Cisco Systems, was developed as a dedicated space for a specifically hyperlocal coverage of the election campaign in each of Australia's 150 electorates from the urban sprawls of Sydney and Brisbane to the sparsely populated remote regions of outback Australia. YD07 provided training materials for would-be citizen journalists and encouraged them to contribute electorate profiles, interview candidates, and conduct vox-pops with citizens in their local area. The site developed a strong following especially in its home state of Queensland, and its interviewers influenced national public debate by uncovering the sometimes controversial personal views of mainstream and fringe candidates. At the same time, the success of YD07 was limited by external constraints determined by campaign timing and institutional frameworks. As part of a continuing action research cycle, lessons learnt from Youdecide2007.org are going to be translated into further iterations of the project, which will cover the local government elections in the Australian state of Queensland, to be held in March 2008, and developments subsequent to these elections. This paper will present research outcomes from the Youdecide2007.org project. In particular, it will examine the roles of staff contributors and citizen journalists in attracting members, providing information, promoting discussion, and fostering community on the site: early indications from a study of interaction data on the site indicate notably different contribution patterns and effects for staff and citizen participants, which may point towards the possibility of developing more explicit pro-am collaboration models in line with the Pro-Am phenomenon outlined by Leadbeater & Miller (2004). The paper will outline strengths and weaknesses of the Youdecide model and highlight requirements for the successful development of active citizen journalism communities. In doing so, it will also evaluate the feasibility of hyperlocal citizen journalism approaches, and their interrelationship with broader regional, state, and national journalism in both its citizen and industrial forms.
Resumo:
Co-production and strategic partnerships may generate valuable learning opportunities for firms to access to the knowledge and expertise of their partners. Such sharing and transfer of knowledge has become an increasingly common way for organising corporate finance and resources. However, not all collaborations result in a net positive experience for both partners. It can be a zero-sum game in which the partner learning the fastest dominates the relationship. In some cases, failure to gain access to partner knowledge results in unequal benefits accruing from such alliances. By examining the Singapore film industry from a learning perspective and taking into account particular forms of alliances, the study contributes to our understanding of the potential benefit and challenges of coproduction as a strategy for development.
Resumo:
This chapter presents the contextual framework for the second phase of a multi-method, multiple study of the information systems (IS) academic discipline in Australia. The chapter outlines the genesis of a two-phase Australian study, and positions the study as the precursor to a larger Pacific-Asia study. Analysis of existing literature on the state of IS and on relevant theory underpins a series of individual Australian state case studies summarised in this chapter and represented as separate chapters in the book. This chapter outlines the methodological approach employed, with emphasis on the case-study method of the multiple state studies. The process of multiple peer review of the studies is described. Importantly, this chapter summarises and analyses each of the subsequent chapters of this book, emphasising the role of a framework developed to guide much of the data gathering and analysis. This chapter also highlights the process involved in conducting the meta-analysis reported in the final chapter of this book, and summarises some of the main results of the meta-analysis.
Resumo:
This paper discusses the issues with sharing information between different disciplines in collaborative projects. The focus is on the information itself rather than the wider issues of collaboration. A range of projects carried out by the Cooperative Research Centre for Construction Innovation (CRC CI) in Australia is used to illustrate the issues.
Resumo:
A study was conducted to examine the factorial validity of the Flinders Decision Making Questionnaire (Mann, 1982), a 31-item self-report inventory designed to measure tendencies to use three major coping patterns identified in the conflict theory of decision making (Janis and Mann, 1977): vigilance, hypervigilance, and defensive avoidance (procrastination, buck-passing, and rationalization). A sample of 2051 university students, comprising samples from Australia (n=262), New Zealand (n=260), the USA (n=475), Japan (n=359), Hong Kong (n=281) and Taiwan (n=414) was administered the DMQ. Factorial validity of the instrument was tested by confirmatory factor analysis with LISREL. Five different substantive models, representing different structural relationships between the decision-coping patterns had unsatisfactory fit to the data and could not be validated. A shortened instrument, containing 22 items, yielded a revised model comprising four identifiable factors-vigilance, hypervigilance, buck-passing, and procrastination. The revised model had adequate fit with data for each country sample and for the total sample, and was confirmed. It is recommended that the 22-item instrument, named the Melbourne DMQ, replace the Flinders DMQ for measurement of decision-coping patterns.
Resumo:
This paper will describe a research project that examines the implications of multidisciplinary student cohorts on teaching and learning within undergraduate and postgraduate units in higher education. Whist students generally specialise in one discipline, it is also common that, at some point during their degree, they will choose to undertake subjects that are outside their specialist area. Students may choose a multidisciplinary learning experience either out of interest or because the subject is seen as complementary to their core discipline. When the lens of identity is applied to the multi-disciplinary cohorts in undergraduate and postgraduate units, it assists in identifying learning needs. The nature of disciplinarity, and the impact it has on students’ academic identity, presents challenges to both students and teachers when they engage in teaching and learning, impacting on curriculum design, assessment practices and teaching delivery strategies (Winberg, 2008). This project aims to identify the barriers that exist to effective teaching and learning in units that have multidisciplinary student cohorts. It will identify the particular needs of students in multidisciplinary student cohorts and determine a teaching and learning model that meets the needs of such cohorts. References Becher, T. & Trowler, P.R. (2001). Academic tribes and territories: Intellectual enquiry and the culture of the discipline. Buckingham, UK: Open University Press. Light, G. & Cox, R. (2001). Learning and teaching in higher education: A reflective professional. Thousand Oaks, CA: Sage. Neumann, R. (2001). Disciplinary differences and university teaching. Studies in Higher Education, 26 (2), 135-46. Neumann, R., Parry, S. & Becher, T. (2002). Teaching and Learning in their disciplinary contexts: A conceptual analysis. Studies in Higher Education, 27(4), 405-417. Taylor, P.G. (1999) Making Sense of Academic Life: Academics, Universities and Change. Buckingham, UK: Open University Press. Winberg, C. (2008). Teaching engineering/engineering teaching: interdisciplinary collaboration and the construction of academic identities. Teaching in Higher Education, 13(3), 353 - 367.
Resumo:
This paper discusses the preliminary findings of an ongoing research project aimed at developing a technological, operational and strategic analysis of adopting BIM in AEC/FM (Architecture-Engineering-Construction/Facility Management) industry as a collaboration tool. Outcomes of the project will provide specifications and guidelines as well as establish industry standards for implementing BIM in practice. This research primarily focuses on BIM model servers as a collaboration platform, and hence the guidelines are aimed at enhancing collaboration capabilities. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perception and expectations of BIM. Layout for case studies being undertaken is presented. These findings provide a base to develop comprehensive software specifications and national guidelines for BIM with particular emphasis on BIM model servers as collaboration platforms.
Resumo:
Queensland University of Technology (QUT) is faced with a rapidly growing research agenda built upon a strategic research capacity-building program. This presentation will outline the results of a project that has recently investigated QUT’s research support requirements and which has developed a model for the support of eResearch across the university. QUT’s research building strategy has produced growth at the faculty level and within its research institutes. This increased research activity is pushing the need for university-wide eResearch platforms capable of providing infrastructure and support in areas such as collaboration, data, networking, authentication and authorisation, workflows and the grid. One of the driving forces behind the investigation is data-centric nature of modern research. It is now critical that researchers have access to supported infrastructure that allows the collection, analysis, aggregation and sharing of large data volumes for exploration and mining in order to gain new insights and to generate new knowledge. However, recent surveys into current research data management practices by the Australian Partnership for Sustainable Repositories (APSR) and by QUT itself, has revealed serious shortcomings in areas such as research data management, especially its long term maintenance for reuse and authoritative evidence of research findings. While these internal university pressures are building, at the same time there are external pressures that are magnifying them. For example, recent compliance guidelines from bodies such as the ARC, and NHMRC and Universities Australia indicate that institutions need to provide facilities for the safe and secure storage of research data along with a surrounding set of policies, on its retention, ownership and accessibility. The newly formed Australian National Data Service (ANDS) is developing strategies and guidelines for research data management and research institutions are a central focus, responsible for managing and storing institutional data on platforms that can be federated nationally and internationally for wider use. For some time QUT has recognised the importance of eResearch and has been active in a number of related areas: ePrints to digitally publish research papers, grid computing portals and workflows, institutional-wide provisioning and authentication systems, and legal protocols for copyright management. QUT also has two widely recognised centres focused on fundamental research into eResearch itself: The OAK LAW project (Open Access to Knowledge) which focuses upon legal issues relating eResearch and the Microsoft QUT eResearch Centre whose goal is to accelerate scientific research discovery, through new smart software. In order to better harness all of these resources and improve research outcomes, the university recently established a project to investigate how it might better organise the support of eResearch. This presentation will outline the project outcomes, which include a flexible and sustainable eResearch support service model addressing short and longer term research needs, identification of resource requirements required to establish and sustain the service, and the development of research data management policies and implementation plans.
Resumo:
Research has noted a ‘pronounced pattern of increase with increasing remoteness' of death rates in road crashes. However, crash characteristics by remoteness are not commonly or consistently reported, with definitions of rural and urban often relying on proxy representations such as prevailing speed limit. The current paper seeks to evaluate the efficacy of the Accessibility / Remoteness Index of Australia (ARIA+) to identifying trends in road crashes. ARIA+ does not rely on road-specific measures and uses distances to populated centres to attribute a score to an area, which can in turn be grouped into 5 classifications of increasing remoteness. The current paper uses applications of these classifications at the broad level of Australian Bureau of Statistics' Statistical Local Areas, thus avoiding precise crash locating or dedicated mapping software. Analyses used Queensland road crash database details for all 31,346 crashes resulting in a fatality or hospitalisation occurring between 1st July, 2001 and 30th June 2006 inclusive. Results showed that this simplified application of ARIA+ aligned with previous definitions such as speed limit, while also providing further delineation. Differences in crash contributing factors were noted with increasing remoteness such as a greater representation of alcohol and ‘excessive speed for circumstances.' Other factors such as the predominance of younger drivers in crashes differed little by remoteness classification. The results are discussed in terms of the utility of remoteness as a graduated rather than binary (rural/urban) construct and the potential for combining ARIA crash data with census and hospital datasets.
Resumo:
Introduction: Weight gain is a common concern following breast cancer and has been associated with negative health outcomes. As such, prevention of weight gain is of clinical interest. This work describes weight change between 6- and 18-months following a breast cancer diagnosis and explores the personal, treatment and behavioural characteristics associated with gains in weight. Methods: Body mass index was objectively assessed, at three-monthly intervals, on a population-based sample of women newly diagnosed with unilateral breast cancer (n=185). Changes in BMI between 6- and 18-months post-diagnosis were calculated, with gains of one or more being considered clinically detrimental to future health. Results: Approximately 60% of participants were overweight or obese at 6-months post-diagnosis. While BMI remained relatively stable across the testing period (range=27.3-27.8), 24% of participants experienced clinically relevant gains in BMI (median gains=1.9). Following adjustment for potential confounders, younger age (<45 years; Odds ratio, OR=9.8), being morbidly obese at baseline (OR=4.6) and receiving hormone therapy (OR=4.8) were characteristics associated with an increased odds (p<0.05) of gaining BMI. Other characteristics associated with gains in BMI were more extensive surgery and having a history of smoking, although these relationships were not supported statistically. In contrast, caring for younger children was associated with reduced risk of gaining BMI (OR=0.3, p=0.20). Conclusions: Clinically relevant weight gain between 6- and 18-months post-breast cancer diagnosis is an issue for one in four women, with certain subgroups being particularly susceptible. However, the majority of women diagnosed with breast cancer are overweight or obese and gains in body weight are common. Thus, interventions that address the importance of achieving and sustaining a healthy body weight, delivered to all women with breast cancer, may have greater public health impact than interventions targeting any specific breast cancer subgroup.