284 resultados para Bim
Resumo:
The integration between architectural design and structur al systems consi sts, in academic education, one of the main challenges to the architectural design education . Recent studies point to the relevance of the use of computational tools in academic settings as an important strategy for such integration. Although in recent yea rs teaching experience using BIM (BuildingInformationModeling) may be incorporated by the a rchitecture schools , notes the need for further didactic and pedagogical practices that promote the architectural design and structur al integration teaching. This pa per analyzes experiences developed within the UFRN and UFPB, seeking to identify tools, processes and products used, pointing limitations and potentials in subjects taught in these institutions. The research begins with a literature review on teaching BIM and related aspects to the integration of architectural design and stru c tur e . It has been used as data collection techniques in studio the direct observation, the use of questionnaires and interviews with students and teachers, and mixed method, qualitativ e and quantitative analysis . In UFRN, the scope of the Integrated Workshop as a compulsory subject in the curriculum, favors the integration of disciplines studied here as it allows teachers from different disciplines at the same project studio . Regarding the use of BIM form initial users, BIM modelers, able to extract quantitative and automatically speed up production, gaining in quality in the products, however learn the tool and design in parallel cause some difficulties. UFPB, lack of required courses o n BIM, generates lack of knowledge and confidence in using the tool and processes, by most students. Thus we see the need for greater efforts by school to adopt BIM skills and training. There is a greater need for both BIM concept, in order to promote BIM process and consequent better use of tools, and obsolete avoiding impairment of technology, merely a tool. It is considered the inclusion of specific subjects with more advanced BIM skills, through partnerships with engineering degrees and the promotion of trans disciplinary integration favoring the exchange of different cultures from the academic environment.
Resumo:
Los procesos de diseño y construcción tradicionales de la industria de la construcción que se han conservado inalterados durante años, han impedido vislumbrar los impactos positivos que se pueden dar al trabajar en conjunto con las tecnologías de información -- El miedo al cambio hace que las empresas del sector denominen “normal” a la fragmentación del proceso constructivo, y presupuesten desde el inicio de la obra atrasos por incompatibilidades en los diseños causados principalmente por la falta de comunicación y coordinación entre los diferentes participantes del proyecto -- La implementación de tecnologías de información busca no sólo ayudar como una herramienta a los diseños del proyecto, sino que también ofrece elementos para integrar a los participantes y contratistas del proyecto en un equipo de trabajo donde exista mayor interoperabilidad entre las áreas implicadas en el planteamiento, diseño y ejecución del proyecto, y se pueda disminuir de sobremanera la fragmentación que vuelve tan poco competitiva esta industria a nivel mundial -- En el presente trabajo de grado se realizó un estado del arte de la tecnología de información BIM con el fin de sintetizar las enormes cantidades de información disponibles y de posibilitar una mejor comprensión de este -- Con la teoría y los manuales estudiados a profundidad de los software que componen esta tecnología, se procedió a desarrollar un ejercicio exploratorio confrontando los conocimientos adquiridos teóricos con la parte práctica, parte en donde se pudieron vislumbrar las ventajas y desventajas al implementar este software en la industria de la construcción de nuestro país -- Finalmente se exponen los requerimientos y limitaciones que trae consigo la aplicación de esta tecnología a los proyectos de construcción
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação em Arquitetura e Urbanismo, 2015.
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2016.
Resumo:
Building Information Modeling (BIM) concept is able to reshape each AEC project and the industry in general, offering a comprehensive collaboration process over a model of structure with regularly actualized and synchronized information. This report presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders through four case studies carried out during the internship in the engineering office NEWTON - Engineering Consultancy Company. The aim of the four cases studies was to cover multidisciplinary and varied projects. The first case study highlights the engineering project’s workflow and presents a comparison of traditional procedures and BIM concepts applied on the rehabilitation of an existing building. In the second and third case study, attention is focused on the goals achieved, particularly by structural engineer, due to the implementation of the mentioned technology on a full-lifecycle BIM project of a small residence and a complex project of residential building in Porto and on its architectural integration. In addition, through the fourth case study, the spatial coordination of Mechanical, Electrical and Plumbing (MEP) systems at a large-scale hotel project has been analyzed and accomplished, highlighting merits of BIM at this project stage. Through a reduction of the space used for facilities and infrastructures and the ability to identify conflicts and to nullify the related costs, its advantage for a complex building was proved.
Resumo:
La tesi tratta la ricerca di procedure che permettano di rilevare oggetti utilizzando il maggior numero di informazioni geometriche ottenibili da una nuvola di punti densa generata da un rilievo fotogrammetrico o da TLS realizzando un modello 3D importabile in ambiente FEM. Il primo test si è eseguito su una piccola struttura, 1.2x0.5x0.2m, in modo da definire delle procedure di analisi ripetibili; la prima consente di passare dalla nuvola di punti “Cloud” all’oggetto solido “Solid” al modello agli elementi finiti “Fem” e per questo motivo è stata chiamata “metodo CSF”, mentre la seconda, che prevede di realizzare il modello della struttura con un software BIM è stata chiamata semplicemente “metodo BIM”. Una volta dimostrata la fattibilità della procedura la si è validata adottando come oggetto di studio un monumento storico di grandi dimensioni, l’Arco di Augusto di Rimini, confrontando i risultati ottenuti con quelli di altre tesi sulla medesima struttura, in particolare si è fatto riferimento a modelli FEM 2D e a modelli ottenuti da una nuvola di punti con i metodi CAD e con un software scientifico sviluppato al DICAM Cloud2FEM. Sull’arco sono state eseguite due tipi di analisi, una lineare sotto peso proprio e una modale ottenendo risultati compatibili tra i vari metodi sia dal punto di vista degli spostamenti, 0.1-0.2mm, che delle frequenze naturali ma si osserva che le frequenze naturali del modello BIM sono più simili a quelle dei modelli generati da cloud rispetto al modello CAD. Il quarto modo di vibrare invece presenta differenze maggiori. Il confronto con le frequenze naturali del modello FEM ha restituito differenze percentuali maggiori dovute alla natura 2D del modello e all’assenza della muratura limitrofa. Si sono confrontate le tensioni normali dei modelli CSF e BIM con quelle ottenute dal modello FEM ottenendo differenze inferiori a 1.28 kg/cm2 per le tensioni normali verticali e sull’ordine 10-2 kg/cm2 per quelle orizzontali.
Resumo:
In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
This Digital Modelling Report incorporates the previous research completed for the FM Exemplar Project utilising the Sydney Opera House as a case study. The research has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House do not have digital models of its structure, there is an opportunity to investigate the application of Digital Facility Modelling using standardised Building Information Models (BIM). The digital modelling research project has examined the potential of standardised building information models to develop a digital facility model supporting facilities management (FM). The focus of this investigation was on the following areas: • The re-usability of standardised building information models (BIM) for FM purposes. • The potential of BIM as an information framework acting as integrator for various FM data sources. • The extendibility and flexibility of the BIM to cope with business specific data and requirements. • Commercial FM software using standardised building information models. • The ability to add (organisation-specific) intelligence to the model. • A roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.
Resumo:
The Automated Estimator and LCADesign are two early examples of nD modelling software which both rely on the extraction of quantities from CAD models to support their further processing. The issues of building information modelling (BIM), quantity takeoff for different purposes and automating quantity takeoff are discussed by comparing the aims and use of the two programs. The technical features of the two programs are also described. The technical issues around the use of 3D models is described together with implementation issues and comments about the implementation of the IFC specifications. Some user issues that emerged through the development process are described, with a summary of the generic research tasks which are necessary to fully support the use of BIM and nD modelling.
Resumo:
Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.
Resumo:
Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal
Resumo:
After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.