949 resultados para Active power flow
Resumo:
In the doctoral dissertation, low-voltage direct current (LVDC) distribution system stability, supply security and power quality are evaluated by computational modelling and measurements on an LVDC research platform. Computational models for the LVDC network analysis are developed. Time-domain simulation models are implemented in the time-domain simulation environment PSCAD/EMTDC. The PSCAD/EMTDC models of the LVDC network are applied to the transient behaviour and power quality studies. The LVDC network power loss model is developed in a MATLAB environment and is capable of fast estimation of the network and component power losses. The model integrates analytical equations that describe the power loss mechanism of the network components with power flow calculations. For an LVDC network research platform, a monitoring and control software solution is developed. The solution is used to deliver measurement data for verification of the developed models and analysis of the modelling results. In the work, the power loss mechanism of the LVDC network components and its main dependencies are described. Energy loss distribution of the LVDC network components is presented. Power quality measurements and current spectra are provided and harmonic pollution on the DC network is analysed. The transient behaviour of the network is verified through time-domain simulations. DC capacitor guidelines for an LVDC power distribution network are introduced. The power loss analysis results show that one of the main optimisation targets for an LVDC power distribution network should be reduction of the no-load losses and efficiency improvement of converters at partial loads. Low-frequency spectra of the network voltages and currents are shown, and harmonic propagation is analysed. Power quality in the LVDC network point of common coupling (PCC) is discussed. Power quality standard requirements are shown to be met by the LVDC network. The network behaviour during transients is analysed by time-domain simulations. The network is shown to be transient stable during large-scale disturbances. Measurement results on the LVDC research platform proving this are presented in the work.
Resumo:
Dans une turbine hydraulique, la rotation des aubes dans l’eau crée une zone de basse pression, amenant l’eau à passer de l’état liquide à l’état gazeux. Ce phénomène de changement de phase est appelé cavitation et est similaire à l’ébullition. Lorsque les cavités de vapeur formées implosent près des parois, il en résulte une érosion sévère des matériaux, accélérant de façon importante la dégradation de la turbine. Un système de détection de l’érosion de cavitation à l’aide de mesures vibratoires, employable sur les turbines en opération, a donc été installé sur quatre groupes turbine-alternateur d’une centrale et permet d’estimer précisément le taux d’érosion en kg/ 10 000 h. Le présent projet vise à répondre à deux objectifs principaux. Premièrement, étudier le comportement de la cavitation sur un groupe turbine-alternateur cible et construire un modèle statistique, dans le but de prédire la variable cavitation en fonction des variables opératoires (tels l’ouverture de vannage, le débit, les niveaux amont et aval, etc.). Deuxièmement, élaborer une méthodologie permettant la reproductibilité de l’étude à d’autres sites. Une étude rétrospective sera effectuée et on se concentrera sur les données disponibles depuis la mise à jour du système en 2010. Des résultats préliminaires ont mis en évidence l’hétérogénéité du comportement de cavitation ainsi que des changements entre la relation entre la cavitation et diverses variables opératoires. Nous nous proposons de développer un modèle probabiliste adapté, en utilisant notamment le regroupement hiérarchique et des modèles de régression linéaire multiple.
Resumo:
One major component of power system operation is generation scheduling. The objective of the work is to develop efficient control strategies to the power scheduling problems through Reinforcement Learning approaches. The three important active power scheduling problems are Unit Commitment, Economic Dispatch and Automatic Generation Control. Numerical solution methods proposed for solution of power scheduling are insufficient in handling large and complex systems. Soft Computing methods like Simulated Annealing, Evolutionary Programming etc., are efficient in handling complex cost functions, but find limitation in handling stochastic data existing in a practical system. Also the learning steps are to be repeated for each load demand which increases the computation time.Reinforcement Learning (RL) is a method of learning through interactions with environment. The main advantage of this approach is it does not require a precise mathematical formulation. It can learn either by interacting with the environment or interacting with a simulation model. Several optimization and control problems have been solved through Reinforcement Learning approach. The application of Reinforcement Learning in the field of Power system has been a few. The objective is to introduce and extend Reinforcement Learning approaches for the active power scheduling problems in an implementable manner. The main objectives can be enumerated as:(i) Evolve Reinforcement Learning based solutions to the Unit Commitment Problem.(ii) Find suitable solution strategies through Reinforcement Learning approach for Economic Dispatch. (iii) Extend the Reinforcement Learning solution to Automatic Generation Control with a different perspective. (iv) Check the suitability of the scheduling solutions to one of the existing power systems.First part of the thesis is concerned with the Reinforcement Learning approach to Unit Commitment problem. Unit Commitment Problem is formulated as a multi stage decision process. Q learning solution is developed to obtain the optimwn commitment schedule. Method of state aggregation is used to formulate an efficient solution considering the minimwn up time I down time constraints. The performance of the algorithms are evaluated for different systems and compared with other stochastic methods like Genetic Algorithm.Second stage of the work is concerned with solving Economic Dispatch problem. A simple and straight forward decision making strategy is first proposed in the Learning Automata algorithm. Then to solve the scheduling task of systems with large number of generating units, the problem is formulated as a multi stage decision making task. The solution obtained is extended in order to incorporate the transmission losses in the system. To make the Reinforcement Learning solution more efficient and to handle continuous state space, a fimction approximation strategy is proposed. The performance of the developed algorithms are tested for several standard test cases. Proposed method is compared with other recent methods like Partition Approach Algorithm, Simulated Annealing etc.As the final step of implementing the active power control loops in power system, Automatic Generation Control is also taken into consideration.Reinforcement Learning has already been applied to solve Automatic Generation Control loop. The RL solution is extended to take up the approach of common frequency for all the interconnected areas, more similar to practical systems. Performance of the RL controller is also compared with that of the conventional integral controller.In order to prove the suitability of the proposed methods to practical systems, second plant ofNeyveli Thennal Power Station (NTPS IT) is taken for case study. The perfonnance of the Reinforcement Learning solution is found to be better than the other existing methods, which provide the promising step towards RL based control schemes for practical power industry.Reinforcement Learning is applied to solve the scheduling problems in the power industry and found to give satisfactory perfonnance. Proposed solution provides a scope for getting more profit as the economic schedule is obtained instantaneously. Since Reinforcement Learning method can take the stochastic cost data obtained time to time from a plant, it gives an implementable method. As a further step, with suitable methods to interface with on line data, economic scheduling can be achieved instantaneously in a generation control center. Also power scheduling of systems with different sources such as hydro, thermal etc. can be looked into and Reinforcement Learning solutions can be achieved.
Resumo:
In this paper, a power management strategy (PMS) has been developed for the control of energy storage in a system subjected to loads of random duration. The PMS minimises the costs associated with the energy consumption of specific systems powered by a primary energy source and equipped with energy storage, under the assumption that the statistical distribution of load durations is known. By including the variability of the load in the cost function, it was possible to define the optimality criteria for the power flow of the storage. Numerical calculations have been performed obtaining the control strategies associated with the global minimum in energy costs, for a wide range of initial conditions of the system. The results of the calculations have been tested on a MATLAB/Simulink model of a rubber tyre gantry (RTG) crane equipped with a flywheel energy storage system (FESS) and subjected to a test cycle, which corresponds to the real operation of a crane in the Port of Felixstowe. The results of the model show increased energy savings and reduced peak power demand with respect to existing control strategies, indicating considerable potential savings for port operators in terms of energy and maintenance costs.
Resumo:
In the first part some information and characterisation about an AC distribution network that feeds traction substations and their possible influences on the DC traction load flow are presented. Those influences are investigated and mathematically modelled. To corroborate the mathematical model, an example is presented and their results are confronted with real measurements.
Resumo:
This work develops a methodology for defining the maximum active power being injected into predefined nodes in the studied distribution networks, considering the possibility of multiple accesses of generating units. The definition of these maximum values is obtained from an optimization study, in which further losses should not exceed those of the base case, i.e., without the presence of distributed generation. The restrictions on the loading of the branches and voltages of the system are respected. To face the problem it is proposed an algorithm, which is based on the numerical method called particle swarm optimization, applied to the study of AC conventional load flow and optimal load flow for maximizing the penetration of distributed generation. Alternatively, the Newton-Raphson method was incorporated to resolution of the load flow. The computer program is performed with the SCILAB software. The proposed algorithm is tested with the data from the IEEE network with 14 nodes and from another network, this one from the Rio Grande do Norte State, at a high voltage (69 kV), with 25 nodes. The algorithm defines allowed values of nominal active power of distributed generation, in percentage terms relative to the demand of the network, from reference values
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Economic dispatch (ED) problems have recently been solved by artificial neural network approaches. Systems based on artificial neural networks have high computational rates due to the use of a massive number of simple processing elements and the high degree of connectivity between these elements. The ability of neural networks to realize some complex non-linear function makes them attractive for system optimization. All ED models solved by neural approaches described in the literature fail to represent the transmission system. Therefore, such procedures may calculate dispatch policies, which do not take into account important active power constraints. Another drawback pointed out in the literature is that some of the neural approaches fail to converge efficiently toward feasible equilibrium points. A modified Hopfield approach designed to solve ED problems with transmission system representation is presented in this paper. The transmission system is represented through linear load flow equations and constraints on active power flows. The internal parameters of such modified Hopfield networks are computed using the valid-subspace technique. These parameters guarantee the network convergence to feasible equilibrium points, which represent the solution for the ED problem. Simulation results and a sensitivity analysis involving IEEE 14-bus test system are presented to illustrate efficiency of the proposed approach. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
This paper presents a new single-phase interleaved high power factor boost pre-regulator operating in critical conduction mode, where the switches and boost diode performing zero-current commutations during its turn-off, eliminating the disadvantages related to the reverse recovery losses and electromagnetic interference problems of the boost diode, when operating in the continuous conduction mode. The interleaving technique is applied in the power cell, providing a significant input current ripple reduction in comparison to discontinuous mode of operation, due to its input current continuous conduction operation. This paper presents a complete modeling for the converter operating in critical conduction mode, resulting in an improved design procedure for interleaved techniques with high input power factor, a complete design procedure, and main simulation results from a design example with two interleaved cells rated at 1kW, 400V output voltage and 220V rms input voltage.
Resumo:
This paper presents a novel single-phase high-power-factor (HPF) pulsewidth-modulated (PWM) boost rectifier featuring soft commutation of the active switches at zero current (ZC), It incorporates the most desirable properties of conventional PWM and soft-switching resonant techniques.The input current shaping is achieved with average current mode control and continuous inductor current mode.This new PWM converter provides ZC turn on and turn off of the active switches, and it is suitable for high-power applications employing insulated gate bipolar transistors (IGBT's),The principle of operation, the theoretical analysis, a design example, and experimental results from a laboratory prototype rated at 1600 W with 400-Vdc output voltage are presented. The measured efficiency and the power factor were 96.2% and 0.99%, respectively, with an input current total harmonic distortion (THD) equal to 3.94%, for an input voltage with THD equal to 3.8%, at rated load.
Resumo:
This paper introduces novel zero-current-switching (ZCS) pulsewidth-modulated (PWM) preregulators based on a new soft-commutation cell, suitable for insulated gate bipolar transistor applications. The active switches in these proposed rectifiers turn on in zero current and turn off in zero current-zero voltage. In addition, the diodes turn on in zero voltage and their reverse-recovery effects over the active switches are negligible. Moreover, based on the proposed cell, an entire family of de-to-de ZCS-PWM converters can be generated, providing conditions to obtain naturally isolated converters, for example, derived buck-boost, Sepic. and Zeta converters. The novel ac-to-dc ZCS-PWM boost and Zeta preregulators are presented in order to verify the operation of this soft-commutation cell, In order to minimize the harmonic contents of the input current, increasing the ac power factor, the average-current-mode control is used, obtaining preregulators with ac power factor near unity and high efficiency at wide load range. The principle of operation, theoretical analysis, design example, and experimental results from test units for the novel preregulators are presented. The new boost preregulator was designed to nominal values of 1.6 kW output power, 220 V(rms) input voltage, 400 V(dc) output voltage, and operating at 20 kHz. The measured efficiency and power factor of the new ZCS-PWM boost preregulator were 96.7% and 0,99, respectively, with an input current total harmonic distortion (THD) equal to 3.42% for an input voltage with THD equal to 1.61%, at rated load, the new ZCS-PWM Zeta preregulator was designed to voltage step-down operation, and the experimental results were obtained from a laboratory prototype rated at 500 W, 220 V(rm), input voltage, 110 V(dc) output voltage, and operating at 50 kHz. The measured efficiency of the new ZCS-PWM Zeta preregulator is approximately 96.9% and the input power factor is 0.98, with an input current THD equal to 19.07% while the input voltage THD is equal to 1.96%, at rated load.
Resumo:
This letter presents an alternative approach for reducing the total real power losses by using a continuation method. Results for two simple test systems and for the IEEE 57-bus system show that this procedure results in larger voltage stability margin. Besides, the reduction of real power losses obtained with this procedure leads to significant money savings and, simultaneously, to voltage profile improvement. Comparison between the solution of an optimal power flow and the proposed method shows that the latter can provide near optimal results and so, it can be a reasonable alternative to power system voltage stability enhancement.
Resumo:
This work presents the application of the Decentralized Modal Control method for pole placement in multimachine power systems utilizing FACTS (Flexible AC Transmission Systems), STATCOM (Static Synchronous Compensator) and UPFC (Unified Power Flow Controller) devices. For this, these devices are equipped with supplementary damping controllers, denominated POD ( Power Oscillation Damping), achieving a coordinated project with local controllers (Power System Stabilizers - PSS). Comparative analysis on the function of damping of the FACTS, STATCOM and UPFC is performed using the New England System that has 10 generators, 39 buses and 46 transmission lines. (c) 2011 Elsevier Ltd. All rights reserved.
Resumo:
This paper proposes a methodology to achieve integrated planning and projects for secondary distribution circuits. The planning model is formulated as a mixed integer nonlinear programming problem (MINLP). In order to resolve this problem, a tabu search (TS) algorithm is used, with a neighborhood structure developed to explore the physical characteristics of specific geographies included in the planning and expansion of secondary networks, thus obtaining effective solutions as well as low operating costs and investments. The project stage of secondary circuits consists of calculating the mechanical efforts to determine the support structures of the primary and secondary distribution systems and determining the types of structures that should be used in the system according to topological and electrical parameters of the network and, therefore, accurately assessing the costs involved in the construction and/or reform of secondary systems. A constructive heuristic based on information of the electrical and topological conditions between the medium voltage and low voltage systems is used to connect the primary systems and secondary circuits. The results obtained from planning and design simulations of a real secondary system of electric energy distribution are presented.