906 resultados para management method
Resumo:
Background/Aims: While laboratory methods for the detection of testicular tissue are well standardized, currently there is no available test to demonstrate the presence of ovarian tissue. We evaluated the effectiveness of gonadal stimulation with luteinizing hormone (LH)/follicle-stimulating hormone (FSH) for the detection of ovarian tissue in patients with disorders of sex development (DSD). Methods: Ten patients with congenital adrenal hyperplasia (CAH) as ovarian-positive controls, 10 with cryptorchidism (ovarian-negative controls), 13 patients with DSD of no defined etiology and 7 patients with ovotesticular DSD (true hermaphroditism, TH) were included in the study. They underwent a daily injection of both LH and FSH on 3 consecutive days. LH, FSH, estradiol, testosterone and inhibin A were measured before treatment, 24 h after the 1st dose and 24 h after the 3rd dose. Results: Estradiol increased in all CAH and TH patients, with a median value of 155.1 and 92.6 pg/ml, respectively, after the 3rd injection. Inhibin A also increased in all CAH and TH patients, with a median value of 70.4 and 32.2 pg/ml, respectively, after the 3rd injection. There was no change in these hormones in the other groups. Conclusion: The LH/FSH stimulation test might be a useful method to detect the presence of ovarian tissue. Copyright (C) 2009 S. Karger AG, Basel
Resumo:
This book chapter represents a synthesis of the work which started in my PhD and which has been the conceptual basis for all of my research since 1993. The chapter presents a method for scientists and managers to use for selecting the type of remotely sensed data to use to meet their information needs associated with a mapping, monitoring or modelling application. The work draws on results from several of my ARC projects, CRC Rainforest and Coastal projects and theses of P.Scarth , K.Joyce and C.Roelfsema.
Resumo:
OBJECTIVES: 1. To critically evaluate a variety of mathematical methods of calculating effective population size (Ne) by conducting comprehensive computer simulations and by analysis of empirical data collected from the Moreton Bay population of tiger prawns. 2. To lay the groundwork for the application of the technology in the NPF. 3. To produce software for the calculation of Ne, and to make it widely available.
Resumo:
Purpose: Hemiplegic shoulder pain can affect up to 70% of stroke patients and can have an adverse impact on rehabilitation outcomes. This article aims to review the literature on the suggested causes of hemiplegic shoulder pain and the therapeutic techniques that can be used to prevent or treat it. On the basis of this review, the components of an optimal management programme for hemiplegic shoulder pain are explored. Method: English language articles in the CINAHL and MEDLINE databases between 1990 and 2000 were reviewed. These were supplemented by citation tracking and manual searches. Results: A management programme for hemiplegic shoulder pain could comprise the following components: provision of an external support for the affected upper limb when the patient is seated, careful positioning in bed, daily static positional stretches, motor retraining and strapping of the scapula to maintain postural tone and symmetry. Conclusions: Research is required to evaluate the effectiveness of the components of the proposed management programme for the prevention and treatment of hemiplegic shoulder pain and to determine in what combination they achieve the best outcomes.
Resumo:
Objective: To investigate the efficacy of a stress management programme on symptoms of colds and influenza in 27 university students before and after the examination period. Method: The incidence of symptoms, levels of negative affect, and secretion rate of secretory immunoglobulin A (sIgA) were recorded for 5 weeks before treatment, for the 4 weeks of treatment, and for 8 weeks after treatment in treated subjects and in 25 others who did not participate in stress management. Results: Symptoms decreased in treated subjects but not in controls during and after the examination period. Although sIgA secretion rate increased significantly after individual sessions of relaxation, resting secretion rate of sIgA did not increase over the course of the study. Negative affect decreased after examinations in both groups, but was not affected by treatment. Conclusion: Stress management reduced days of illness independently of negative affect and sIgA secretion rate. Although the component of treatment responsible for this effect has yet to be identified, psychological interventions may have a role in reducing symptoms of upper respiratory tract infection. (C) 2001 Elsevier Science Inc. All rights reserved.
Resumo:
A soft linguistic evaluation method is proposed for the environmental assessment of physical infrastructure projects based on fuzzy relations. Infrastructure projects are characterized in terms of linguistic expressions of 'performance' with respect to factors or impacts and the 'importance' of those factors/impacts. A simple example is developed to illustrate the method in the context of three road infrastructure projects assessed against five factors/impacts. In addition, a means to include hard or crisp factors is presented and illustrated with respect to a sixth factor.
Resumo:
A field study was conducted to investigate the fate of N-15-labelled nitrate applied at 20 kg N ha(-1) in a wet summer to microplots installed in areas under different residue management regimes in second-rotation hoop pine (Araucaria cunninghamii) plantations aged 1-3 years in south-east Queensland, Australia. PVC microplots of 235 mm diameter and 300 mm long were driven into 250 mm soil. There were three replications of each of eight treatments. These were areas just under and between 1-year-old windrows (ca. 2-3 m in width) of harvesting residues spaced 15 m apart, and with and without incorporated foliage residues (20 t DM ha(-1)); the areas just under and between 2- or 3-year-old windrows spaced 10 m apart. Only 7-29% of the added N-15 was recovered from the top 750 mm of the soil profile with the leaching loss estimated to be 70-86% over the 34-day period. The N-15 loss via denitrification was 3.7-6.3% by directly measuring the N-15 gases emitted. The microplots with the incorporated residues at the 1-year-old site had the highest N-15 loss (6.3%) as compared with the other treatments. The N-15 mass balance method together with the use of bromide (Br) tracer applied at 100 kg Br ha(-1) failed to obtain a reliable estimate of the denitrification loss. The microplots at the 1-year-old site had higher N-15 immobilisation rate (7.5-24.7%) compared with those at 2- and 3-year-old sites (2.1-3.6%). Incorporating the residues resulted in an increase in N-15 immobilisation rate (24.5-24.7%) compared with the control without the incorporated residues (8.4-14.3%). These findings suggest that climatic conditions played important roles in controlling the N-15 transformations in the wet summer season and that the residue management regimes could also significantly influence the N-15 transformations. Most of the N-15 loss occurred through leaching, but a considerable amount of the N-15 was lost through denitrification. Bromide proved to be an unsuitable tracer for monitoring the N-15 leaching and movement under the wet summer conditions. (C) 2002 Elsevier Science B.V. All rights reserved.
Resumo:
The purpose of this study is to characterize how Portuguese Small and Medium Enterprises (SMEs) view the Occupational Health and Safety Management Systems (OHSMSs) certification process, after receiving the Quality Management System (QMS) certification. References were based on the ISO 9001 standard for a QMS and OHSAS 18001 for OHSMS. The method used to evaluate the implemented systems, was by form of questionnaire. Those questioned had to have a certified quality management system, an implemented OHSMS and be a SME. The questionnaire was sent to 300 SMEs; 46 responses were received and validated. Of them, only 12 SMEs had the OHSMS certificate according to OHSAS 18001. Within those 12 companies that participated: 7 SMEs are from the industrial sector; 3 belong to the electricity/telecommunications sector and 2 SMEs are from the trade/services activity sector. The size of the sample was small, but corresponds to Portuguese reality. Moreover, 34 SMEs did not have the OHSMS certificate. The questionnaire requested the main reasons for SMEs to opt for non-certification and it was related with high costs, while the main reasons to certificate were, among others, needed to eliminate or minimize risks to workers. The main benefits that Portuguese SMEs have gained from the referred certifications have been, improved working conditions, ensuring compliance with legislation and better internal communication about risks and hazards. Also presented are the main difficulties in achieving an OHSMS certification including high certification costs, difficulties motivating personnel, difficulties in changing the company’s culture and increased bureaucracy.
Resumo:
Purpose/objectives: This paper seeks to investigate whether performance management (PM) framework adopted in Portuguese local government (PLG) fit the Otley’s PM framework (1999). In particularly, the research questions are (1) whether PM framework adopted in PLG (SIADAP) fit the Otley´s framework, and (2) how local politicians (aldermen) see the operation of performance management systems (PMS) in PLG (focusing on the goal-setting process and incentive and reward structures). Theoretical positioning/contributions: With this paper we intend to contribute to literature on how the Otley’s PM framework can guide empirical research about the operation of PMS. In particular, the paper contributes to understand the fit between PMS implemented in PLG and the Otley´s PM framework. The analysis of this fit can be a good contribution to understand if PMS are used in PLG as a management tool or as a strategic response to external pressures (based on interviews conducted to aldermen). We believe that the Otley’s PM framework, as well as the extended PM framework presented by Ferreira and Otley (2009), can provide a useful research tool to understand the operation of PMS in PLG. Research method: The first research question is the central issue in this paper and is analyzed based on the main reforms introduced by Portuguese government on PM of public organizations (like municipalities). On the other hand, interviews conducted on three larger Portuguese municipalities (Oporto, Braga, and Matosinhos) show how aldermen see the operation of PMS in PLG, highlighting the goals setting process with targets associated and the existing of incentive and reward structures linked with performance. Findings: Generally we find that formal and regulated PM frameworks in PLG fit the main issues of the Otley’s PM framework. However, regarding the aldermen perceptions about PMS in practice we find a gap between theory and practice, especially regarding difficulties associated with the lack of a culture of goals and targets setting and the lack of incentive and reward structures linked with performance.
Resumo:
It is known the power of ideas is tremendous. But there are employees in many companies who have good ideas but not put them into practice. On the other hand, there are many others who have good ideas and are encouraged to contribute their ideas for innovation in the company. This study attempts to identify factors that contribute to success in managing ideas and consequent business innovation. The method used was the case study applied to two companies. During the investigation, factors considered essential for the success of an idea management program were identified, of which we highlight, among others, evidences the results, involvement of the top management, establishment of goals and objectives; recognition; dissemination of good results. Companies with these implemented systems, capture the best ideas from their collaborators and apply them internally. This study intends to contribute to business innovation in enterprises through creation and idea management, mainly through collecting the best ideas of their own employees. The results of this study can be used to help improving deployed suggestions systems, as well as, all managers who wish to implement suggestions systems/ideas management systems.
Resumo:
Effective environmental management within companies, integrated with other management areas like quality and occupational health and safety, is nowadays assumed to be a strategic way to implement and improve lean and cleaner production. Also, sustainable development (SD) and business sustainability can be achieved through a better coordinated management of processes versus associated resources. This paper presents an in depth discussion regarding the promotion of integrated management systems, their benefits and major contribution towards the sustainable development of cleaner production related features. It addresses issues regarding the contributions resulting from the integration of standardized Management System (MS) from both internal and external perspectives. Complementing the overall review of aspects to the development of integrated management systems a survey was conducted in order to better understand the relevance of the identified success factors. The main findings in this paper are as follows: a contextualization model of sustainable development and integrated management systems considering the Triple Bottom Line: economic, social and environmental; and, a method and associated model to support the development of integrated management systems as well as general guidelines to support integration. It can be concluded that a proactive approach and commitment to cleaner production, supported by an integrated management system, brings relevant savings for organizations as well as providing value to the relevant interested parties.
Resumo:
The purpose of this article is to present a defense of the use of single case studies in management research. The defense is necessary because this type of research has been relegated to a secondary role, or even rejected, by many researchers, who consider it unscientific. Evidence of this low status is the fact that most reputable academic journals in management publish few articles based on single-case studies. In this paper, we examine in detail the objections to the use of such cases in management research. We show the efforts made by some researchers to answer these objections and we show quality criteria for research that are alternatives to the criteria used in the so-called "scientific method." Our analysis suggests that a better understanding - by researchers with different methodological preferences - of the arguments for each particular use of the single-case study as a research method would allow a better dialogue between researchers and benefit management research as a whole.
Resumo:
Power systems have been suffering huge changes mainly due to the substantial increase of distributed generation and to the operation in competitive environments. Virtual power players can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Resource management gains an increasing relevance in this competitive context, while demand side active role provides managers with increased demand elasticity. This makes demand response use more interesting and flexible, giving rise to a wide range of new opportunities.This paper proposes a methodology for managing demand response programs in the scope of virtual power players. The proposed method is based on the calculation of locational marginal prices (LMP). The evaluation of the impact of using demand response specific programs on the LMP value supports the manager decision concerning demand response use. The proposed method has been computationally implemented and its application is illustrated in this paper using a 32 bus network with intensive use of distributed generation.
Resumo:
This paper proposes a simulated annealing (SA) approach to address energy resources management from the point of view of a virtual power player (VPP) operating in a smart grid. Distributed generation, demand response, and gridable vehicles are intelligently managed on a multiperiod basis according to V2G user´s profiles and requirements. Apart from using the aggregated resources, the VPP can also purchase additional energy from a set of external suppliers. The paper includes a case study for a 33 bus distribution network with 66 generators, 32 loads, and 1000 gridable vehicles. The results of the SA approach are compared with a methodology based on mixed-integer nonlinear programming. A variation of this method, using ac load flow, is also used and the results are compared with the SA solution using network simulation. The proposed SA approach proved to be able to obtain good solutions in low execution times, providing VPPs with suitable decision support for the management of a large number of distributed resources.
Resumo:
Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.