989 resultados para external stakeholders


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Multi-storey buildings are highly vulnerable to terrorist bombing attacks in various parts of the world. Large numbers of casualties and extensive property damage result not only from blast overpressure, but also from the failing of structural components. Understanding the blast response and damage consequences of reinforced concrete (RC) building frames is therefore important when assessing multi-storey buildings designed to resist normal gravity loads. However, limited research has been conducted to identify the blast response and damage of RC frames in order to assess the vulnerability of entire buildings. This paper discusses the blast response and evaluation of damage of three-dimension (3D) RC rigid frame under potential blast loads scenarios. The explicit finite element modelling and analysis under time history blast pressure loads were carried out by LS DYNA code. Complete 3D RC frame was developed with relevant reinforcement details and material models with strain rate effect. Idealised triangular blast pressures calculated from standard manuals are applied on the front face of the model in the present investigation. The analysis results show the blast response, as displacements and material yielding of the structural elements in the RC frame. The level of damage is evaluated and classified according to the selected load case scenarios. Residual load carrying capacities are evaluated and level of damage was presented by the defined damage indices. This information is necessary to determine the vulnerability of existing multi-storey buildings with RC frames and to identify the level of damage under typical external explosion environments. It also provides basic guidance to the design of new buildings to resist blast loads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia seven schemes (apart from the Superannuation Complaints Tribunal) provide alternative dispute resolution services for complaints brought by consumers against financial services industry members. Recently the Supreme Court of New South Wales held that the decisions of one scheme were amenable to judicial review at the suit of a financial services provider member and the Supreme Court of Victoria has since taken a similar approach. This article examines the juristic basis for such a challenge and contends that judicial review is not available, either at common law or under statutory provisions. This is particularly the case since Financial Industry Complaints Service Ltd v Deakin Financial Services Pty Ltd (2006) 157 FCR 229; 60 ACSR 372 decided that the jurisdiction of a scheme is derived from a contract made with its members. The article goes on to contend that the schemes are required to give procedural fairness and that equitable remedies are available if that duty is breached.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examines the impact of internal audit outsourcing and internal audit’s involvement in consulting on external auditors’ reliance on the work of internal audit. We test whether these factors influence (i) reliance on internal audit work already undertaken and (ii) the use of internal auditors as assistants. In each case, we distinguish between control evaluation and substantive testing. We find that involvement in consulting impacts reliance on work undertaken and the use of internal auditors as assistants for control evaluation. External auditors make greater use of internal auditors as assistants for substantive testing when internal audit is provided in-house. Overall, external auditors use internal audit more for control evaluation tasks than for substantive testing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improved public awareness and strong sentiments towards environmental issues will continue to create increasing demand for sustainable housing (SH) in the coming years. Despite this potential, the up-take rate of sustainable housing in new build and through home renovation is not as high as expected within the housing industry. This is in contrast to the influx of emerging building technologies, new materials and innovative designs seen in exemplar homes built worldwide. How we should use the increasing awareness of SH and emerging technologies as an impetus to change the un-sustainable designs and practices of the building industry is high on the agenda of the government and majority of the stakeholders involved. This warrants the study of multifaceted strategies that meet the needs of multiple stakeholders and integrated seamlessly into housing development processes. Specifically, the different perceptions, roles and incentives of stakeholders, who inevitably need to ensure their benefits and commercial returns, should be highlighted and acted upon. ----- This paper discusses the preliminary findings of a research project that aims to promote SH implementation by identifying and materializing the mutual benefits among key stakeholders. The aim is to be achieved through questionnaire surveys, structural equation modelling, interviews and case studies with seven major stakeholders within the Australian housing industry. This research identifies the influence and relationship of relevant factors, investigates preferences, similarities and differences between stakeholders on perceived benefits and in turn explores the mutual-benefit strategy package that facilitates decision making towards sustainable housing development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Resource decisions are critical to the venture creation process, which has important subsequent impacts on venture creation and performance (Boeker, 1989). Most entrepreneurs however, suffer substantial resource constraints in venture creation and during venture growth (Shepherd et al., 2000). Little is known about how high potential, sustainability ventures (the ventures of interest in this research), despite resource constraints, achieve continued venture persistence and venture success. One promising theory that explicitly links to resource constraints is a concept developed by Levi Strauss (1967) termed bricolage. Bricolage aligns with notions of resourcefulness: using what's on hand, through making do, and recombining resources for new or novel purposes (Baker & Nelson 2005). To the best of our knowledge, previous studies have not systematically investigated internal and external constraints, their combinations, and subsequent bricolage patterns. The majority of bricolage literature focuses on external environmental constraints (e.g. Wieck 1989; Baker & Nelson 2005), thereby paying less attention to in evaluating internal constraints (e.g. skills and capabilities) or constraint combinations. In this paper we focus on ventures that typically face resource-poor environments. High potential, nascent and young sustainability ventures are often created and developed with resource constraints and in some cases, have greater resource requirements owing to higher levels of technical sophistication of their products (Rothaermel & Deeds 2006). These ventures usually have high aspirations and potential for growth who ''seeks to meet the needs and aspirations without compromising the ability to meet those of the future'' (Brundtland Commission 1983). High potential ventures are increasingly attributed with a central role in the development of innovation, and employment in developed economies (Acs 2008). Further, increasing awareness of environmental and sustainability issues has fostered demand for business processes that reduce detrimental environmental impacts of global development (Dean & McMullen 2007) and more environmentally sensitive products and services: representing an opportunity for the development of ventures that seek to satisfy this demand through entrepreneurial action. These ventures may choose to ''make do'' with existing resources in developing resource combinations that produce the least impact on the environment. The continuous conflict between the greater requirements for resources and limited resource availability in high potential sustainable ventures, with the added complexity of balancing this with an uncompromising focus on using ''what's on hand'' to lessen environment impacts may make bricolage behaviours critical for these ventures. Research into bricolage behaviour is however, the exception rather than the rule (Cunha 2005). More research is therefore needed to further develop and extend this emerging concept, especially in the context of sustainability ventures who are committed to personal and social goals of resourcefulness. To date, however, bricolage has not been studied specifically among high potential sustainable ventures. This research seeks to develop an in depth understanding of the impact of internal and external constraints and their combinations on the mechanisms employed in bricolage behaviours in differing dynamic environments. The following research question was developed to investigate this: How do internal, external resource constraints (or their combinations) impact bricolage resource decisions in high potential sustainability ventures? ---------- Methodology/Key Propositions: 6 case studies will be developed utilizing survey data from the Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE) large-scale longitudinal study of new venture start-ups in Australia. Prior to commencing case studies, 6 scoping interviews were conducted with key stakeholders including industry members, established businesses and government to ensure practical relevance in case development. The venture is considered the unit of analysis with the key informant being the entrepreneur and other management team members where appropriate. Triangulation techniques are used in this research including semi-structured interviews, survey data, onsite visits and secondary documentation website analysis, resumes, and business plans. These 6 sustainability ventures have been selected based on different environmental dynamism conditions including a traditionally mature market (building industry) and a more dynamic, evolving industry (renewable energy/solar ventures). In evaluating multidisciplinary literature, we expect the following external constraints are critical including: technology constraints (seen through lock-in of incumbents existing technology), institutional regulation and standards, access to markets, knowledge and training to nascent and young venture bricolage processes. The case studies will investigate internal constraints including resource fungability, resource combination capabilities, translating complex science/engineering knowledge into salient, valuable market propositions, i.e. appropriate market outcomes, and leveraging relationships may further influence bricolage decisions. ---------- Results and Implications: Intended ventures have been identified within the CAUSEE sample and have agreed to participate and secondary data collection for triangulation purposes has already commenced. Data collection of the case studies commenced 27th of May 2009. Analysis is expected to be completed finalised by 25th September 2009. This paper will report on the pattern of resource constraints and its impact on bricolage behaviours: its subsequent impact on resource deployment within venture creation and venture growth. As such, this research extends the theory of bricolage through the systematic analysis of constraints on resource management processes in sustainability ventures. For practice, this research may assist in providing a better understanding of the resource requirements and processes needed for continued venture persistence and growth in sustainability ventures. In these times of economic uncertainty, a better understanding of the influence on constraints and bricolage: the interplay of behaviours, processes and outcomes may enable greater venture continuance and success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the Good Friday Agreement of 1998, large sums have been invested in community theatre projects in Northern Ireland, in the interests of conflict transformation and peace building. While this injection of funds has resulted in an unprecedented level of applied theatre activity, opportunities to maximise learning from this activity are being missed. It is generally assumed that project evaluation is undertaken at least partly to assess the degree of success of projects against important social objectives, with a view to learning what works, what does not, and what might work in the future. However, three ethnographic case studies of organisations delivering applied theatre projects in Northern Ireland indicate that current processes used to evaluate such projects are both flawed and inadequate for this purpose. Practitioners report that the administrative work involved in applying for and justifying funding is onerous, burdensome, and occurs at the expense of artistic activity. This is a very real concern when the time and effort devoted to ‘filling out the forms’ does not ultimately result in useful evaluative information. There are strong disincentives for organisations to report honestly on their experiences of difficulties, or undesirable impacts of projects, and this problem is not transcended by the use of external evaluators. Current evaluation processes provide little opportunity to capture unexpected benefits of projects, and small but significant successes which occur in the context of over-ambitious objectives. Little or no attempt is made to assess long-term impacts of projects on communities. Finally, official evaluation mechanisms fail to capture the reflective practice and dialogic analysis of practitioners, which would richly inform future projects. The authors argue that there is a need for clearer lines of communication, and more opportunities for mutual learning, among stakeholders involved in community development. In particular, greater involvement of the higher education sector in partnership with government and non-government agencies could yield significant benefits in terms of optimizing learning from applied theatre project evaluations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: To demonstrate properties of the International Classification of the External Cause of Injury (ICECI) as a tool for use in injury prevention research. Methods: The Childhood Injury Prevention Study (CHIPS) is a prospective longitudinal follow up study of a cohort of 871 children 5–12 years of age, with a nested case crossover component. The ICECI is the latest tool in the International Classification of Diseases (ICD) family and has been designed to improve the precision of coding injury events. The details of all injury events recorded in the study, as well as all measured injury related exposures, were coded using the ICECI. This paper reports a substudy on the utility and practicability of using the ICECI in the CHIPS to record exposures. Interrater reliability was quantified for a sample of injured participants using the Kappa statistic to measure concordance between codes independently coded by two research staff. Results: There were 767 diaries collected at baseline and event details from 563 injuries and exposure details from injury crossover periods. There were no event, location, or activity details which could not be coded using the ICECI. Kappa statistics for concordance between raters within each of the dimensions ranged from 0.31 to 0.93 for the injury events and 0.94 and 0.97 for activity and location in the control periods. Discussion: This study represents the first detailed account of the properties of the ICECI revealed by its use in a primary analytic epidemiological study of injury prevention. The results of this study provide considerable support for the ICECI and its further use.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.