945 resultados para construction projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of the paper is to the identify risk factors, which affect oil and gas construction projects in Vietnam and derive risk responses. Design/methodology/approach - Questionnaire survey was conducted with the involvement of project executives of PetroVietnam and statistical analysis was carried out in order to identify the major project risks. Subsequently, mitigating measures were derived using informal interviews with the various levels of management of PetroVietnam. Findings - Bureaucratic government system and long project approval procedures, poor design, incompetence of project team, inadequate tendering practices, and late internal approval processes from the owner were identified as major risks. The executives suggested various strategies to mitigate the identified risks. Reforming the government system, effective partnership with foreign collaborators, training project executives, implementing contractor evaluation using multiple criteria decision-making technique, and enhancing authorities of project people were suggested as viable approaches. Practical implications - The improvement measures as derived in this study would improve chances of project success in the oil and gas industry in Vietnam. Originality/value - There are several risk management studies on managing projects in developing countries. However, as risk factors vary considerably across industry and countries, the study of risk management for successful projects in the oil and gas industry in Vietnam is unique and has tremendous importance for effective project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to present a state-of-the-art review of the scope and practical implications of the Building Information Modelling (BIM) platform in the UK construction practice. Theoretical developments suggest that BIM is an integration of both product and process innovation, not just a disparate set of software tools. BIM provides effective collaboration, visual representation and data management, which enable the smooth flow of information throughout the project’s lifecycle. The most frequently reported benefits are related to Capital Cost (capex) and Operational costs (opex) and time savings. Key challenges, however, focus on the interoperability of software, capital installation costs, in-house experience, client preference and cultural issues within design teams and within the organisation. The paper concludes with a critical commentary on the changing roles and a process required to implement BIM in UK construction projects, and suggests areas for further research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Privity of contract has lately been criticized in several European jurisdictions, particu-larly due to the onerous consequences it gives rise to in arrangements typical for the modern exchange such as chains of contracts. Privity of contract is a classical premise of contract law, which prohibits a third party to acquire or enforce rights under a contract to which he is not a party. Such a premise is usually seen to be manifested in the doctrine of privity of contract developed under common law, however, the jurisdictions of continental Europe do recognize a corresponding starting point in contract law. One of the traditional industry sectors affected by this premise is the construction industry. A typical large construction project includes a contractual chain comprised of an employer, a main contractor and a subcontractor. The employer is usually dependent on the subcontractor's performance, however, no contractual nexus exists between the two. Accordingly, the employer might want to circumvent the privity of contract in order to reach the subcontractor and to mitigate any risks imposed by such a chain of contracts. From this starting point, the study endeavors to examine the concept of privity of con-tract in European jurisdictions and particularly the methods used to circumvent the rule in the construction industry practice. For this purpose, the study employs both a com-parative and a legal dogmatic method. The principal aim is to discover general principles not just from a theoretical perspective, but from a practical angle as well. Consequently, a considerable amount of legal praxis as well as international industry forms have been used as references. The most important include inter alia the model forms produced by FIDIC as well as Olli Norros' doctoral thesis "Vastuu sopimusketjussa". According to the conclusions of this study, the four principal ways to circumvent privity of contract in European construction projects include liability in a chain of contracts, collateral contracts, assignment of rights as well as security instruments. The contempo-rary European jurisdictions recognize these concepts and the references suggest that they are an integral part of the current market practice. Despite the fact that such means of circumventing privity of contract raise a number of legal questions and affect the risk position of particularly a subcontractor considerably, it seems that the impairment of the premise of privity of contract is an increasing trend in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is twofold. First, it aims to highlight the main factors and items affecting the productivity of construction projects, based on the perceptions of CEOs in construction companies in Iran. Second, the study compares the elicited CEOs’ perceptions against the findings of studies based on the views of such as project managers, middle managers and employees in other levels. Design/methodology/approach – The study drew upon literature on construction work to develop a conceptual model. Further, a total of 60 CEOs from road construction companies were surveyed using a five-point Likert scale questionnaire to generate the data. The collated data were categorised and ranked according to the CEOs perceived level of importance using the relative importance index. Findings – The findings highlight the main factors and items affecting labour productivity in construction projects in Iran as perceived by CEOs, which are mainly of human resources management nature and could be attributed to motivation and managerial policy aspects. The study also recognises that factors associated with the working environment particularly safety and health are perceived as insignificant by Iranian CEOs which could be a concern for the Iranian construction industry. The discussions shed some light on the discrepancies between the perceptions of CEOs and previous studies in regards to major determinants of productivity in the construction context. Originality/value – This study is the first study aiming at discussing the perceptions of CEOs of construction companies active in construction projects in Iran. As such, the study highlights the standpoint of the main decision makers in construction companies in regards to labour productivity in the construction sector. Thus, the key contribution of the present study is providing insight into the perceptions of CEOs, who play the most vital role in strategic development of construction companies whereas previous studies have mostly focused on project or middle managers having a lower influence in determining the strategic plans of companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction waste generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of the construction industry. As the industry cannot continue to practice if the environmental resources on which it depends are depleted, the significance of waste management needs to be understood in order to encourage stakeholders to achieve related goals. Therefore, this research aims to determine effective approaches to eliminate and/or minimise waste generation in construction projects. Mixed methods were adopted by combining qualitative and quantitative research approaches. Interviews and a questionnaire survey were conducted as the primary data collection methods. The findings reveal twenty six critical solutions for waste management. Five factors of solutions for waste management were extracted from the exploratory factor analysis. These factors were: team building and supervision; strategic guidelines in waste management; proper design and documentation; innovation in waste management decisions; and lifecycle management. The evidence from this study suggests that both technologies and attitudinal approaches require improvement to eliminate/minimise waste generation in construction projects. Similarly, attention should be paid to being mindful of the environmental effects of waste generation and avoiding waste generation as early as possible in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to understand the attitudes and behaviours of stakeholders towards waste management and consequently identify ways of improving waste management practices in construction projects. Semi-structured interviews were conducted. The findings reveal that most of the decisions in construction projects are based on their financial returns unless there is a special requirement to comply with Green Star or any other sustainable building rating system. Even though there is a trend towards environment-friendly construction, contractors are favourable towards methods involving financial incentives. Results also indicate that private developers are more price-driven compared with government clients. Findings reveal the necessity of enforcing legislation to improve waste management practices until such practices become culturally embedded in organizations across the supply chain. Similarly, end users' motivation towards waste management was also identified as a key to encouraging stakeholders of construction projects and improving their attitudes and behaviours towards waste management practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has been found to be a major generator of waste and there are many challenges associated with finding the most sustainable way to manage construction waste. As the construction industry is a project based industry, it is essential to look at cultural issues related to waste management at the project level. Therefore, this research aims to identify the current status of waste management practices in construction projects by analysing project managers’ views on waste management performance in construction projects; project managers’ attitudes towards waste management; and project managers’ views on waste management culture in construction projects. A questionnaire survey was carried out and project managers were selected as a target group to distribute questionnaires, as project managers have a vital involvement in promoting and maintaining project culture in the construction project environment. Data was analysed using descriptive statistics and the Kruskal-Wallis test. The findings reveal that project managers believe that even though the operational cost of waste minimisation is high in construction projects, overall waste management is profitable. At the same time it was interesting that even though project managers believe most project participants are satisfied with existing waste management systems, overall waste management efforts are not perceived as being at a satisfactory level in construction projects. Project managers consider waste as an inevitable by-product, but they do not believe that waste management is beyond the control of project members or that waste has no value. At the same time, it was found that project managers infer that project participants are cost and time conscious in waste management despite the roles, responsibilities and duties of each party in waste management not being well-coordinated or fully understood. Taken together, these findings highlight the misconceptions related to waste management in construction projects and emphasise the necessity of collective responsibility on the part of project participants to enhance the performance of waste management in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study was twofold: (1) Identifying the risks that are critical for risk management of road construction projects in Sri Lanka on a life cycle basis and (2) defining the shares of the parties involved in projects in terms of handling the identified risks. A Delphi study was conducted among 33 Sri Lankan experts (consultants, project managers, contractors) in three rounds. The findings showed that the construction and design phases are prone to many major risks. Moreover, ‘delays in payment by the client’ was the most critical risk factor in the construction stage. Furthermore, it was established that some major risks could occur in more than one phase of the project life cycle, stressing the necessity of handling these risk factors as a prerequisite for project success. The discussions presented in this study would enhance the effectiveness of implementing risk management practices in Sri Lankan road construction projects. From a broader vantage point, it will also serve the risk management body of knowledge in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Implementation of global virtual engineering teams (GVETs) commenced since at least two decades ago, but construction has been behind other industries in terms of harnessing this new paradigm. Nevertheless, GVETs are receiving increasing attention within the construction context due to numerous potential benefits they can bring about for the projects. On the other hand, the research about GVETs in Australia is still in its embryonic stages. Australian scholars noticeably have paid scant attention to GVETs in comparison to their colleagues in other developed countries. This paper assumes the process of implementation of a GVET as an isolated project. The study then highlights the well-known main areas of necessary knowledge for managing a GVET project within the construction context based on a project lifecycle approach. Recognizing the weaknesses of existing literature, the paper sets out an agenda for further research within Australian construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The intense competition between the Iranian construction companies has led them to take all appropriate measures to decrease the costs as much as possible. Hence, due to the pivotal role of human resources in construction projects cost, a major part of Iranian construction companies seek their profitability and survival in maximizing the productivity of their operatives. Because of the widespread belief among contractors about the low productivity of daily workers and operatives with basic salary, they commit a major part of their projects activities to sub-contractors. Deployment of sub-contractors by construction firms has become largely conventional in country's construction projects. The aims of this paper is defined as determining the factors and grounds affecting sub-contractors productivity and evaluate their overall negative side effects on project productivity via a structured questionnaire. A total of 31 factors selected and were divided into 7 broad categories. The perceptions of companies managers were asked about the level of effect brought about by the mentioned factors and groups upon productivity on a time based criterion. The analysis indicated that the most important grounds affecting sub-contractors productivity in descending order include: Materials/Tools, Construction technology and method, Planning, Supervision system, Reworks, Weather, and Jobsite condition. Project managers should focus on the identified major grounds and relevant factors in order to improve productivity as long as they commit construction activities to sub-contractors. © 2012 Copyright Vilnius Gediminas Technical University (VGTU) Press Technika.