900 resultados para biomass allocation
Resumo:
The deployment of bioenergy technologies is a key part of UK and European renewable energy policy. A key barrier to the deployment of bioenergy technologies is the management of biomass supply chains including the evaluation of suppliers and the contracting of biomass. In the undeveloped biomass for energy market buyers of biomass are faced with three major challenges during the development of new bioenergy projects. What characteristics will a certain supply of biomass have, how to evaluate biomass suppliers and which suppliers to contract with in order to provide a portfolio of suppliers that best satisfies the needs of the project and its stakeholder group whilst also satisfying crisp and non-crisp technological constraints. The problem description is taken from the situation faced by the industrial partner in this research, Express Energy Ltd. This research tackles these three areas separately then combines them to form a decision framework to assist biomass buyers with the strategic sourcing of biomass. The BioSS framework. The BioSS framework consists of three modes which mirror the development stages of bioenergy projects. BioSS.2 mode for early stage development, BioSS.3 mode for financial close stage and BioSS.Op for the operational phase of the project. BioSS is formed of a fuels library, a supplier evaluation module and an order allocation module, a Monte-Carlo analysis module is also included to evaluate the accuracy of the recommended portfolios. In each mode BioSS can recommend which suppliers should be contracted with and how much material should be purchased from each. The recommended blend should have chemical characteristics within the technological constraints of the conversion technology and also best satisfy the stakeholder group. The fuels library is made up from a wide variety of sources and contains around 100 unique descriptions of potential biomass sources that a developer may encounter. The library takes a wide data collection approach and has the aim of allowing for estimates to be made of biomass characteristics without expensive and time consuming testing. The supplier evaluation part of BioSS uses a QFD-AHP method to give importance weightings to 27 different evaluating criteria. The evaluating criteria have been compiled from interviews with stakeholders and policy and position documents and the weightings have been assigned using a mixture of workshops and expert interview. The weighted importance scores allow potential suppliers to better tailor their business offering and provides a robust framework for decision makers to better understand the requirements of the bioenergy project stakeholder groups. The order allocation part of BioSS uses a chance-constrained programming approach to assign orders of material between potential suppliers based on the chemical characteristics of those suppliers and the preference score of those suppliers. The optimisation program finds the portfolio of orders to allocate to suppliers to give the highest performance portfolio in the eyes of the stakeholder group whilst also complying with technological constraints. The technological constraints can be breached if the decision maker requires by setting the constraint as a chance-constraint. This allows a wider range of biomass sources to be procured and allows a greater overall performance to be realised than considering crisp constraints or using deterministic programming approaches. BioSS is demonstrated against two scenarios faced by UK bioenergy developers. The first is a large scale combustion power project, the second a small scale gasification project. The Bioss is applied in each mode for both scenarios and is shown to adapt the solution to the stakeholder group importance and the different constraints of the different conversion technologies whilst finding a globally optimal portfolio for stakeholder satisfaction.
Resumo:
In this paper, the placement of sectionalizers, as well as, a cross-connection is optimally determined so that the objective function is minimized. The objective function employed in this paper consists of two main parts, the switch cost and the reliability cost. The switch cost is composed of the cost of sectionalizers and cross-connection and the reliability cost is assumed to be proportional to a reliability index, SAIDI. To optimize the allocation of sectionalizers and cross-connection problem realistically, the cost related to each element is considered as discrete. In consequence of binary variables for the availability of sectionalizers, the problem is extremely discrete. Therefore, the probability of local minimum risk is high and a heuristic-based optimization method is needed. A Discrete Particle Swarm Optimization (DPSO) is employed in this paper to deal with this discrete problem. Finally, a testing distribution system is used to validate the proposed method.
Resumo:
To allocate and size capacitors in a distribution system, an optimization algorithm, called Discrete Particle Swarm Optimization (DPSO), is employed in this paper. The objective is to minimize the transmission line loss cost plus capacitors cost. During the optimization procedure, the bus voltage, the feeder current and the reactive power flowing back to the source side should be maintained within standard levels. To validate the proposed method, the semi-urban distribution system that is connected to bus 2 of the Roy Billinton Test System (RBTS) is used. This 37-bus distribution system has 22 loads being located in the secondary side of a distribution substation (33/11 kV). Reducing the transmission line loss in a standard system, in which the transmission line loss consists of only about 6.6 percent of total power, the capabilities of the proposed technique are seen to be validated.
Resumo:
In this paper, the placement and sizing of Distributed Generators (DG) in distribution networks are determined optimally. The objective is to minimize the loss and to improve the reliability. The constraints are the bus voltage, feeder current and the reactive power flowing back to the source side. The placement and size of DGs are optimized using a combination of Discrete Particle Swarm Optimization (DPSO) and Genetic Algorithm (GA). This increases the diversity of the optimizing variables in DPSO not to be stuck in the local minima. To evaluate the proposed algorithm, the semi-urban 37-bus distribution system connected at bus 2 of the Roy Billinton Test System (RBTS), which is located at the secondary side of a 33/11 kV distribution substation, is used. The results finally illustrate the efficiency of the proposed method.
Resumo:
Lifecycle funds offered by retirement plan providers allocate aggressively to risky asset classes when the employee participants are young, gradually switching to more conservative asset classes as they grow older and approach retirement. This approach focuses on maximizing growth of the accumulation fund in the initial years and preserving its value in the later years. The authors simulate terminal wealth outcomes based on conventional lifecycle asset allocation rules as well as on contrarian strategies that reverse the direction of asset switching. The evidence suggests that the growth in portfolio size over time significantly impacts the asset allocation decision. Due to the portfolio size effect that is observed by the authors, the terminal value of accumulation in retirement accounts is influenced more by the asset allocation strategy adopted in later years relative to that adopted in early years. By mechanistically switching to conservative assets in the later years of a plan, lifecycle strategies sacrifice significant growth opportunity and prove counterproductive to the participant's wealth accumulation objective. The authors' conclude that this sacrifice does not seem to be compensated adequately in terms of reducing the risk of potentially adverse outcomes.
Resumo:
In this paper, the optimal allocation and sizing of distributed generators (DGs) in a distribution system is studied. To achieve this goal, an optimization problem should be solved in which the main objective is to minimize the DGs cost and to maximise the reliability simultaneously. The active power balance between loads and DGs during the isolation time is used as a constraint. Another point considered in this process is the load shedding. It means that if the summation of DGs active power in a zone, isolated by the sectionalizers because of a fault, is less than the total active power of loads located in that zone, the program start shedding the loads in one-by-one using the priority rule still the active power balance is satisfied. This assumption decreases the reliability index, SAIDI, compared with the case loads in a zone are shed when total DGs power is less than the total load power. To validate the proposed method, a 17-bus distribution system is employed and the results are analysed.
Resumo:
In cloud computing resource allocation and scheduling of multiple composite web services is an important challenge. This is especially so in a hybrid cloud where there may be some free resources available from private clouds but some fee-paying resources from public clouds. Meeting this challenge involves two classical computational problems. One is assigning resources to each of the tasks in the composite web service. The other is scheduling the allocated resources when each resource may be used by more than one task and may be needed at different points of time. In addition, we must consider Quality-of-Service issues, such as execution time and running costs. Existing approaches to resource allocation and scheduling in public clouds and grid computing are not applicable to this new problem. This paper presents a random-key genetic algorithm that solves new resource allocation and scheduling problem. Experimental results demonstrate the effectiveness and scalability of the algorithm.
Resumo:
In open railway access markets, a train service provider (TSP) negotiates with an infrastructure provider (IP) for track access rights. This negotiation has been modeled by a multi-agent system (MAS) in which the IP and TSP are represented by separate software agents. One task of the IP agent is to generate feasible (and preferably optimal) track access rights, subject to the constraints submitted by the TSP agent. This paper formulates an IP-TSP transaction and proposes a branch-and-bound algorithm for the IP agent to identify the optimal track access rights. Empirical simulation results show that the model is able to emulate rational agent behaviors. The simulation results also show good consistency between timetables attained from the proposed methods and those derived by the scheduling principles adopted in practice.
Resumo:
This paper explores the conditions of acceptability of differing allocation systems under scarcity and evaluates what makes a price system more or less fair. We find that fairness in an allocation arrangement depend on the institutional settings inherent in the situation, such as information, transparency and competition and the perceived institutional quality e.g., fiscal exchange and institutional trust). Results also indicate that the solution “weak people first” is seen as the fairest approach to an excess demand situation, followed by “first come, first serve”, the price system and an auction system. On the other hand, a random procedure or an allocation through the government is not perceived to be fair. Moreover, economics students seemed to be less sceptical towards the price system than other subjects although we observe that female students are more sceptical than male students.
Resumo:
A substantial body of research is focused on understanding the relationships between socio-demographics, land-use characteristics, and mode specific attributes on travel mode choice and time-use patterns. Residential and commercial densities, inter-mixing of land uses, and route directness in conjunction with transportation performance characteristics interact to influence accessibility to destinations as well as time spent traveling and engaging in activities. This study uniquely examines the activity durations undertaken for out-of-home subsistence; maintenance, and discretionary activities. Also examined are total tour durations (summing all activity categories within a tour). Cross-sectional activities are obtained from household activity travel survey data from the Atlanta Metropolitan Region. Time durations allocated to weekdays and weekends are compared. The censoring and endogeneity between activity categories and within individuals are captured using multiple equations Tobit models. The analysis and modeling reveal that land-use characteristics such as net residential density and the number of commercial parcels within a kilometer of a residence are associated with differences in weekday and weekend time-use allocations. Household type and structure are significant predictors across the three activity categories, but not for overall travel times. Tour characteristics such as time-of-day and primary travel mode of the tours also affect traveler's out-of-home activity-tour time-use patterns.
Resumo:
Robustness of the track allocation problem is rarely addressed in literatures and the obtained track allocation schemes (TAS) embody some bottlenecks. Therefore, an approach to detect bottlenecks is needed to support local optimization. First a TAS is transformed to an executable model by Petri nets. Then disturbances analysis is performed using the model and the indicators of the total trains' departure delays are collected to detect bottlenecks when each train suffers a disturbance. Finally, the results of the tests based on a rail hub linking six lines and a TAS about thirty minutes show that the minimum buffer time is 21 seconds and there are two bottlenecks where the buffer times are 57 and 44 seconds respectively, and it indicates that the bottlenecks do not certainly locate at the area where there is minimum buffer time. The proposed approach can further support selection of multi schemes and robustness optimization.