985 resultados para Turtons Creek
Resumo:
Upper Catfish Creek is located in a 9,300-acre watershed that flows through two significant natural resources, Swiss Valley Park and Swiss Valley Nature Preserves, one of the largest nature preserves in the Midwest. According to DNR’s 2002 305(d) report, that portion of the creek within the park and preserve is classified as a Class B(CW) cold water stream of which a portion has naturally reproducing trout (one of only 30 in the state of Iowa with this capability). Urban sprawl is a real threat to the Upper Catfish Creek Watershed. Currently, 10% of the watershed is residential, but 27% is zoned residential or commercial. The watershed is near Dubuque city limits but the jurisdiction is in the county. Differing criteria for land development between city and county jurisdictions further entices developers to build in outlying areas. County leaders agree there is more that needs to be done and will work with municipalities on uniformity of regulations and follow-up measures. We propose to set up key urban conservation practice models that will address storm water runoff and water quality which can be learned about and viewed by city and county officials, engineers, developers, etc. This would be part of a larger initiative including an educational campaign, inter-jurisdictional planning, the development of a land use GIS database, and agricultural conservation practices. The successes coming out of and learned about this watershed will serve as a model to spread county-wide.
Resumo:
Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.
Resumo:
Lower Coldwater and Palmer Creeks in Butler and Floyd counties are subwatersheds of the Cedar River, which provides drinking water to Cedar Rapids, IA. The increasing concentration of nitrate+nitrate in the river is of concern to the Cedar Rapids water utility, and IDNR snapshot monitoring shows Coldwater and Palmer to be significant potential sources (above the 90th percentile for subwatersheds monitored). Both creeks are also on the Iowa Section 303(d) list of impaired waters (aquatic life). Citizens of these predominantly agricultural watersheds organized the Coldwater-Palmer Watershed Improvement Association to deal proactively with nonpoint source pollutants from crop and livestock operations through a performance-based environmental management program. The locally-adapted program implemented by the Coldwater-Palmer watershed council rewards participants for environmental accomplishments - soil quality improvement and nutrient source reduction as measured by accepted, scientifically-based tests and models. Most of the locallyappropriate BMPs used to improve performance are undertaken voluntarily at participants' initiative. WIRB funds will be combined with funding from the Iowa Com Growers Association and significant in-kind support from the Cedar River Watershed Monitoring Coalition, Iowa State University Extension and other partners. The project will result in sustainable reduction in nutrient loading achieved with voluntary participation of a majority of watershed farm operators.
Resumo:
This watershed project will provide technical and financial assistance to improve surface and groundwater quality. This will be accomplished by installing an alternative tile outlet for 3 agricultural drainage wells (ADWs) and providing incentives to implement nutrient and pest management.
Resumo:
Price Creek is a 13 mile long stream located in SE Benton County and the NE corner of Iowa County. It ends below the village of Amana where it flows into the Iowa River. The Iowa and Benton County Soil & Water Conservation Districts (SWCDs) applied (and were tentatively approved) for 319/WPF/WSPF funding to treat livestock and water quality issues in this watershed over the next three years. That project’s funds were allocated for a Project Coordinator, information and education activities, and cost share for Best Management Practices (BMPs) directed toward livestock issues and nutrient issues. Soil erosion and sedimentation are also problems in this 18,838 acre watershed. It is 64% HEL (highly erodible land) and 58% of it is cropped. With a coordinator working with Price Creek producers, this would be an excellent time to also address the soil loss and sedimentation issues in this watershed. We will offer additional cost share incentives on BMPs targeting soil erosion on the critical areas we’ve identified. We are applying to IWIRB for additional funding to allow us to cost share specific BMPs up to 75% to treat soil loss in these critical areas of the Price Creek Watershed.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
Dry Run Creek Watershed was designated an impaired waterbody by DNR in 2002, following an assessment of the biota in the stream by DNR Biologist, Tom Wilton. Subsequent studies by IOWATER Snapshot effort in 2003, found e-coli bacteria concentrations and high nitrate readings in excess of the State of Iowa limits for recreational streams. The Dry Run Creek Watershed Improvement Project is comprised of five major components. Three components will feature demonstrations of structural best management practices (BMPs) to protect water quality in Dry Run Creek. The fourth is an educational workshop to "kick-off" the initiative and background the stakeholders of the watershed in new stormwater management strategies for water quality protection. The fifth is a monitoring program that will provide data on the effectiveness of the practices to be demonstrated. Measurable outcomes from these projects include monitoring to document the effectiveness of infiltration based BMPs to reduce pollutant loading in urban stormwater runoff and reducing the volume of stormwater discharged directly into Dry Run Creek via storm sewer flows. Understanding of and social acceptance of new stormwater strategies and practices will also be monitored by surveys of watershed stakeholders and compared to findings of a survey done before the start of the project.
Resumo:
In-lake management can be a critical need for water quality improvement for impaired recreation lakes. Biomanipulation practices to achieve the proper balance of predatory fish, zooplankton grazing of algae, and native aquatic vegetation can sometimes restore water clarity of turbid, nutrient enriched lakes. Lakewood leaders have a renovation plan for Lake Colchester, involving several common and three innovative practices. Lakewood is prepared to pay for proven practices, but seeks WIRB grant support to test innovations in collaboration with Iowa DNR biologists, and ISU limnologists, serving as advisors and monitors for the entire project.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
The goal of this project is to help residents of the Hewitt Creek watershed identify themselves as a watershed community and use cost-effective approaches to control non-point source nutrient and sediment contaminants according to collective science-based environmental goals. The project will tap the low-cost, high-return human resources of local knowledge and resident leadership for economical and sustainable solutions. A watershed council will implement an incentive program to engage their watershed community in locally-acceptable practices and performance (outcome) measures for environmental stewardship that have reasonable cost and are linked with accountable crop and livestock management decisions. The Iowa and Dubuque County Farm Bureau have supported one year of management practice incentives. The performance incentive program will take this effort to the next level, to focus on outcomes.
Resumo:
Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.
Resumo:
The Iowa County Soil and Water Conservation District is applying on behalf of the unincorporated community of Conroy to construct a wastewater collection and treatment system to assist in the cleanup and protection of the Clear Creek Watershed. Conroy sits at the headwaters of Clear Creek. Monitoring of the watershed has shown consistently high levels of E.coli bacteria and chloride near the upper end of the creek. In addition, toilet paper and fecal material have been observed on numerous occasions. These are obvious health threats to the residents of the watershed. The monitoring of the watershed, coupled with lab analysis, suggest septic inputs are negatively impacting the headwaters of Clear Creek. A new sewer system for the community of Conroy will eliminate illegal discharges into the creek and be the first step in the overall protection of the watershed and the water quality therein.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.
Resumo:
Little Bear Creek is a 21.79 mile Class A1 and B (WW2) warm water stream that encompasses approximately 29,202 acres in northern Poweshiek County. The lower 8.4 mile segment is listed as biologically impaired on both the IDNR 2008 303(d) list and 2010 303(d) draft list. A RASCAL assessment and landowner survey was completed through a development grant in 2011, and these assessments indicate that erosion and sediment delivery from cropland, lack of adequate buffers along the stream channel, and streambank conditions contribute significant sediment delivery to the stream, likely resulting in the impairment. An estimated 36,544 tons of sediment are delivered to the stream annually. A total of 11,075 acres (38%) of the watershed are high priority areas or land with sediment delivery rates greater than one. Our goal over 15 years is to install Best Management Practices (BMPs) and increase public education in order to reduce sediment and phosphorus delivery by 25% and decrease priority areas by 15%. More specific objectives for this WIRB project are to 1) Reduce annual sediment delivery by roughly 16.3% or 1,058 tons and associated phosphorus delivery by 1,375 pounds and 2) Develop an information and education program aimed at producers and residents within the headwaters of Grant and Chester townships, which account for 18% of the watershed's priority areas. The SWCD proposes to utilize 50% EQIP funds and 25% WIRB funds toward rural BMPs, and 75% WIRB funds toward urban BMPs received through this application.
Resumo:
Waterloo Creek Watershed is a 30,610 acre area that straddles the Iowa and Minnesota border. The lower 43% of the watershed is in Iowa. Bee and Duck Creeks in Minnesota flow into Waterloo Creek in Iowa. Designated as a primary contact recreational stream as well as a high-quality, cold water stream in Iowa, Waterloo Creek is a popular destination for anglers and other nature enthusiasts. The stream was on the Iowa DNR’s “Impaired Waters List” in 2008 and 2010 for Escherichia coli (E. coli) bacteria. Samples collected in 2010 and 2011 showed higher levels of E. coli. at sites with cattle in close proximity to the stream and were generally greater after high rainfall events. Other factors affecting water quality are high turbidity levels and frequent flooding. There is a deficiency in upland land treatment and an abundance of conventional tillage which increases the amount of erosion and potential for surface runoff to carry sediment to the stream. A comprehensive watershed assessment and management plan have been completed for the watershed which identify the causes of and solutions to water quality impairments. The goals of this project are to 1) develop a formal working relationship between technical staff in Iowa and Minnesota, 2) identify specific locations for Best Management Practice (BMP) implementation, 3) reduce sediment loading to Waterloo Creek to improve aquatic habitat and decrease bacteria delivery, and 4) reduce flooding potential in the watershed. The following BMPs will be implemented to reach these goals: terraces, grade stabilization structures, pasture management, stream buffers, stream bank stabilization, and agricultural waste structures.