989 resultados para Tree City USA Program


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cryptococcus neoformans and Cryptococcus gattii are important agents of meningoencephalitis in humans in the city of Belém. This clinical data suggests that the region may be a highly endemic area for the pathogenic Cryptococcus species within the state of Pará (PA), Northern Brazil. Preliminary analysis of 11 environmental samples from the city of Belém showed two positive locations, including a hollow of a kassod tree (Senna siamea) colonized simultaneously by C. gattii molecular type VGII and C. neoformans molecular type VNI, and a birdcage in a commercial aviary positive for C. neoformans, molecular type VNI. This is the first evidence of an environmental occurrence of molecular types VNI and VGII in PA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The distribution of Lutzomyia longipalpis is heterogeneous with a pattern of high abundance areas (HAAs) embedded in a matrix of low abundance areas (LAAs). The objective of this study was to describe the variability in the abundance of Lu. longipalpis at two different spatial levels and to analyse the relationship between the abundance and multiple environmental variables. Of the environmental variables analysed in each household, the condition that best explained the differences in vector abundance between HAA-LAA was the variable "land_grass", with greater average values in the peridomestic environments within the LAA, and the variables "#sp tree", "#pots" and "dist_water" that were higher in the HAA. Of the environmental variables analysed in the patches, the variable "unpaved_streets" was higher in the LAAs and the variable "prop_inf_dogs" was higher in the HAAs. An understanding of the main environmental variables that influence the vector distribution could contribute to the development of strategies for the prevention and control of visceral leishmaniasis (VL). This is the first work in which environmental variables are analysed at the micro-scale in urban areas at the southern edge of the current range of Lu. longipalpis. Our results represent a significant contribution to the understanding of the abundance of the vector in the peridomestic habitats of the region.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A non-controlled longitudinal study was conducted to evaluate the combined vaccine against measles, mumps and rubella (MMR) immunogenicity in 150 children vaccinated in the routine of three health units in the city of Rio de Janeiro, Brazil, 2008-2009, without other vaccines administered during the period from 30 days before to 30 days after vaccination. A previous study conducted in Brazil in 2007, in 1,769 children ranging from 12-15 months of age vaccinated against yellow fever and MMR simultaneously or at intervals of 30 days or more between doses, had shown low seroconversion for mumps regardless of the interval between administration of the two vaccines. The current study showed 89.5% (95% confidence interval: 83.3; 94.0) seroconversion rate for mumps. All children seroconverted for measles and rubella. After revaccination, high antibody titres and seroconversion rates were achieved against mumps. The results of this study and others suggest that two MMR doses confer optimal immunoresponses for all three antigens and the possible need for additional doses should be studied taking into account not only serological, but also epidemiological data, as there is no serological correlate of protection for mumps.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Advance planning, proper species selection, site preparation, careful handling of tree seedlings, and a good weed control program will help assure a successful tree planting. A commitment to plant with care, is an important first step that leads to successful establishment of tree and shrub seedlings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The historically-reactive approach to identifying safety problems and mitigating them involves selecting black spots or hot spots by ranking locations based on crash frequency and severity. The approach focuses mainly on the corridor level without taking the exposure rate (vehicle miles traveled) and socio-demographics information of the study area, which are very important in the transportation planning process, into consideration. A larger study analysis unit at the Transportation Analysis Zone (TAZ) level or the network planning level should be used to address the needs of development of the community in the future and incorporate safety into the long-range transportation planning process. In this study, existing planning tools (such as the PLANSAFE models presented in NCHRP Report 546) were evaluated for forecasting safety in small and medium-sized communities, particularly as related to changes in socio-demographics characteristics, traffic demand, road network, and countermeasures. The research also evaluated the applicability of the Empirical Bayes (EB) method to network-level analysis. In addition, application of the United States Road Assessment Program (usRAP) protocols at the local urban road network level was investigated. This research evaluated the applicability of these three methods for the City of Ames, Iowa. The outcome of this research is a systematic process and framework for considering road safety issues explicitly in the small and medium-sized community transportation planning process and for quantifying the safety impacts of new developments and policy programs. More specifically, quantitative safety may be incorporated into the planning process, through effective visualization and increased awareness of safety issues (usRAP), the identification of high-risk locations with potential for improvement, (usRAP maps and EB), countermeasures for high-risk locations (EB before and after study and PLANSAFE), and socio-economic and demographic induced changes at the planning-level (PLANSAFE).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This manual summarizes the roadside tree and brush control methods used by all of Iowa's 99 counties. It is based on interviews conducted in Spring 2002 with county engineers, roadside managers and others. The target audience of this manual is the novice county engineer or roadside manager. Iowa law is nearly silent on roadside tree and brush control, so individual counties have been left to decide on the level of control they want to achieve and maintain. Different solutions have been developed but the goal of every county remains the same: to provide safe roads for the traveling public. Counties in eastern and southern Iowa appear to face the greatest brush control challenge. Most control efforts can be divided into two categories: mechanical and chemical. Mechanical control includes cutting tools and supporting equipment. A chain saw is the most widely used cutting tool. Tractor mounted boom mowers and brush cutters are used to prune miles of brush but have significant safety and aesthetic limitations and boom mowers are easily broken by inexperienced operators. The advent of tree shears and hydraulic thumbs offer unprecedented versatility. Bulldozers are often considered a method of last resort since they reduce large areas to bare ground. Any chipper that violently grabs brush should not be used. Chemical control is the application of herbicide to different parts of a plant: foliar spray is applied to leaves; basal bark spray is applied to the tree trunk; a cut stump treatment is applied to the cambium ring of a cut surface. There is reluctance by many to apply herbicide into the air due to drift concerns. One-third of Iowa counties do not use foliar spray. By contrast, several accepted control methods are directed toward the ground. Freshly cut stumps should be treated to prevent resprouting. Basal bark spray is highly effective in sensitive areas such as near houses. Interest in chemical control is slowly increasing as herbicides and application methods are refined. Fall burning, a third, distinctly separate technique is underused as a brush control method and can be effective if timed correctly. In all, control methods tend to reflect agricultural patterns in a county. The use of chain saws and foliar sprays tends to increase in counties where row crops predominate, and boom mowing tends to increase in counties where grassland predominates. For counties with light to moderate roadside brush, rotational maintenance is the key to effective control. The most comprehensive approach to control is to implement an integrated roadside vegetation management (IRVM) program. An IRVM program is usually directed by a Roadside Manager whose duties may be shared with another position. Funding for control programs comes from the Rural Services Basic portion of a county's budget. The average annual county brush control budget is about $76,000. That figure is thought not to include shared expenses such as fuel and buildings. Start up costs for an IRVM program are less if an existing control program is converted. In addition, IRVM budgets from three different northeastern Iowa counties are offered for comparison in this manual. The manual also includes a chapter on temporary traffic control in rural work zones, a summary of the Iowa Code as it relates to brush control, and rules on avoiding seasonal disturbance of the endangered Indiana bat. Appendices summarize survey and forest cover data, an equipment inventory, sample forms for record keeping, a sample brush control policy, a few legal opinions, a literature search, and a glossary.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Chicago to Iowa City Intercity Passenger Rail Program (Program) is a joint undertaking of the Iowa Department of Transportation (Iowa DOT) and the Illinois Department of Transportation (Illinois DOT). The purpose of the Program is to reestablish passenger rail services from Chicago to Iowa City, independently and in concert with the MWRRI (Midwest Regional Rail Initiative). The Chicago to Iowa City Corridor is one part of the vision established by the MWRRI to expand existing and develop new regional passenger rail service to meet existing and future travel demands in the Midwest. This project will expand and create a rail transportation alternative to supplant private automobile, bus, and air travel between Chicago and Iowa City, and intermediate points, and to create new transportation opportunity and capability for people who cannot meet their transportation needs with private automobile, bus and air modes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from January 2, 2007 to June 30, 2008 for the purposes of assisting in the evaluation component for the two-year Prison Re-Entry Initiative (PRI) grand awarded to the DOC by the U.S. Office of Justice Programs. The PRI grant period ran from July 2006 through June 2008 and included two primary components. First, all PRI participants returning to Polk County would participate in a Lifeskills curriculum offered through the Des Moines Area Community College (DMACC) at four Iowa prison institutions located at Mitchellville, Newton, Fort Dodge and Rockwell City. Second, all PRI participants returning to Polk County would be referred to The Directors Council (TDC) for cmmunity-based wrap-around services.