967 resultados para Teams, Call Centres, Resistance


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Developing an effective impact evaluation framework, managing and conducting rigorous impact evaluations, and developing a strong research and evaluation culture within development communication organisations presents many challenges. This is especially so when both the community and organisational context is continually changing and the outcomes of programs are complex and difficult to clearly identify.----- This paper presents a case study from a research project being conducted from 2007-2010 that aims to address these challenges and issues, entitled Assessing Communication for Social Change: A New Agenda in Impact Assessment. Building on previous development communication projects which used ethnographic action research, this project is developing, trailing and rigorously evaluating a participatory impact assessment methodology for assessing the social change impacts of community radio programs in Nepal. This project is a collaboration between Equal Access – Nepal (EAN), Equal Access – International, local stakeholders and listeners, a network of trained community researchers, and a research team from two Australian universities. A key element of the project is the establishment of an organisational culture within EAN that values and supports the impact assessment process being developed, which is based on continuous action learning and improvement. The paper describes the situation related to monitoring and evaluation (M&E) and impact assessment before the project began, in which EAN was often reliant on time-bound studies and ‘success stories’ derived from listener letters and feedback. We then outline the various strategies used in an effort to develop stronger and more effective impact assessment and M&E systems, and the gradual changes that have occurred to date. These changes include a greater understanding of the value of adopting a participatory, holistic, evidence-based approach to impact assessment. We also critically review the many challenges experienced in this process, including:----- • Tension between the pressure from donors to ‘prove’ impacts and the adoption of a bottom-up, participatory approach based on ‘improving’ programs in ways that meet community needs and aspirations.----- • Resistance from the content teams to changing their existing M&E practices and to the perceived complexity of the approach.----- • Lack of meaningful connection between the M&E and content teams.----- • Human resource problems and lack of capacity in analysing qualitative data and reporting results.----- • The contextual challenges, including extreme poverty, wide cultural and linguistic diversity, poor transport and communications infrastructure, and political instability.----- • A general lack of acceptance of the importance of evaluation within Nepal due to accepting everything as fate or ‘natural’ rather than requiring investigation into a problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent developments in networked three dimensional (3D) virtual worlds, and the proliferation of high bandwidth communications technology, have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a construction project in which the models for the project are developed and revised. The project investigates three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology. The third aspect of the project, listed above, led by the University of Newcastle, explores the domain of People and the extent to which they contribute to the effectiveness of virtual teams. This report relates, primarily, to this aspect.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent developments in networked three dimensional (3D) virtual worlds and the proliferation of high bandwidth communications technology have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a design/construction project in which models for a project are developed and revised. We have investigated three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasingly it has been argued that senior management teams (SMTs), comprising principals, deputy heads and other personnel, play a critical role in the governance of schools. In recent years, many researchers have drawn upon the tools of micropolitics to illuminate the relationships, dynamics and power plays between and amongst members of SMTs. The paper has two foci. Firstly, it overviews some of the seminal literature in the field of SMTs and micropolitics in an attempt to identify the working practices of and challenges facing members of SMTs. Secondly, it discusses an instrument, the TEAM Development Questionnaire, that emerged from a synthesis of this writing and research. The questionnaire presented here was especially devised to use with members of SMTs to help them (i) identify the dynamics amongst team members; and (ii) identify areas for the team to improve. A set of procedures for implementing the TEAM Development Questionnaire is provided to demonstrate its application to the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From the perspective of network, a project team’s social capital consists of conduits network, and resource exchange network. Prior research intensively studies the effect of the structure of conduits network on the team’s performance, assuming knowledge transfer is the causal mechanism linking conduits network to performance. This paper attempts to explore the interrelations between conduits network and knowledge network, and further distinguish the different influence between various conduit networks, and hypothesizes that a project team’s knowledge network mediates the effect of various conduit networks on the team’s performance. This research can enrich our knowledge of disparate influence of the various conduit networks on knowledge transfer, and imply some management practices to enhance the organization’s social capital, and hence improve the organization’s performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.