966 resultados para Sculpture, Reproductions of.


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

With reproductions of original title-pages.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

With reproductions of original title-pages.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Contains facsimile reproductions of original title-pages.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The plates are reproductions of the author's paintings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Reprinted in 1880 for the New Shakespeare Society, series VI, no. 7, under the title "The rogues and vagabonds of Shakspere's youth," and again in 1907 for "The Shakespeare library."

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Edited by John Payne Collier.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Accompanied by "Motor transportation taxes and fees in Oregon. Appendix A[-B]." (2 v. in 4. tables. 22x35 cm.) Published: [San Francisco?] 1952.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

"This work consists of a series of plates accompanied by brief descriptions ... The plates are reproductions of original drawings made by Mr. C.E. Faxon." cf. Introd.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

An inverted figurative monument to Victorian governor Charles Joseph Latrobe. By creating the impression that a nineteenth century statue has been made to stand precariously on its head, the work seeks to address the tension between the authority of the monument (as a civic marker and a form of portraiture) and its ‘invisibility’ in public space while simultaneously addressing (and subverting) the ‘authorless’ nature of the figurative monument. The work was awarded a judge’s commendation in the 2005 Helen Lempriere National Sculpture Award and had strong responses from the viewing public and widespread media coverage. Ironically, this parodic monument had the effect of raising the profile of Charles La Trobe in the media in ways that a conventional monument would not. Landmark now endures as part of the permanent sculpture collection of Latrobe University, Melbourne.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Since the industrial revolution, our world has experienced rapid and unplanned industrialization and urbanization. As a result, we have had to cope with serious environmental challenges. In this context, an explanation of how smart urban ecosystems can emerge, gains a crucial importance. Capacity building and community involvement have always been key issues in achieving sustainable development and enhancing urban ecosystems. By considering these, this paper looks at new approaches to increase public awareness of environmental decision making. This paper will discuss the role of Information and Communication Technologies (ICT), particularly Webbased Geographic Information Systems (Web-based GIS) as spatial decision support systems to aid public participatory environmental decision making. The paper also explores the potential and constraints of these webbased tools for collaborative decision making.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In asset intensive industries such as mining, oil & gas, utilities etc. most of the capital expenditure happens on acquiring engineering assets. Process of acquiring assets is called as “Procurement” or “Acquisition”. An asset procurement decision should be taken in consideration with the installation, commissioning, operational, maintenance and disposal needs of an asset or spare. However, such cross-functional collaboration and communication does not appear to happen between engineering, maintenance, warehousing and procurement functions in many asset intensive industries. Acquisition planning and execution are two distinct parts of asset acquisition process. Acquisition planning or procurement planning is responsible for determining exactly what is required to be purchased. It is important that an asset acquisition decision is the result of cross-functional decision making process. An acquisition decision leads to a formal purchase order. Most costly asset decisions occur even before they are acquired. Therefore, acquisition decision should be an outcome of an integrated planning & decision making process. Asset intensive organizations both, Government and non Government in Australia spent AUD 102.5 Billion on asset acquisition in year 2008-09. There is widespread evidence of many assets and spare not being used or utilized and in the end are written off. This clearly shows that many organizations end up buying assets or spares which were not required or non-conforming to the needs of user functions. It is due the fact that strategic and software driven procurement process do not consider all the requirements from various functions within the organization which contribute to the operation and maintenance of the asset over its life cycle. There is a lot of research done on how to implement an effective procurement process. There are numerous software solutions available for executing a procurement process. However, not much research is done on how to arrive at a cross functional procurement planning process. It is also important to link procurement planning process to procurement execution process. This research will discuss ““Acquisition Engineering Model” (AEM) framework, which aims at assisting acquisition decision making based on various criteria to satisfy cross-functional organizational requirements. Acquisition Engineering Model (AEM) will consider inputs from corporate asset management strategy, production management, maintenance management, warehousing, finance and HSE. Therefore, it is essential that the multi-criteria driven acquisition planning process is carried out and its output is fed to the asset acquisition (procurement execution) process. An effective procurement decision making framework to perform acquisition planning which considers various functional criteria will be discussed in this paper.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A sculpture made of polyurethane, epoxy resin, pigment and lacquer depicting a ice-cream melting into the form of a nine sided geometric figure.