995 resultados para Road Lighting Costs.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Federal Highway Administration, Office of Research, Development and Technology, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
In the general introduction of the road-accident phenomenon inside and outside Iran, the results of previous research-works and international conferences and seminars on road-safety have been reviewed. Also a sample-road between Tehran and Mashad has been investigated as a case-study. Examining the road-accident data and iriformation,first: the information presented in road-accident report-forms in developed countries is discussed and, second: the procedures for road-accident data collection in Iran are investigated in detail. The data supplied by Iran Road-Police Central Statistics Office, is analysed, different rates are computed, due comparisons with other nations are made, and the results are discussed. Also such analysis and comparisons are presented for different provinces of Iran. It is concluded that each province with its own natural, geographical, social and economical characteristics possesses its own reasons for the quality and quantity of road-accidents and therefore must receive its own appropriate remedial solutions. The question~ of "what is the cost of road-accidents", "why and how evaluate the cost", "what is the appropriate way of approach to such evaluation" are all discussed and then "the cost of road-accidents in Iran" based on two different approaches: "Gross National Output"and "court award" is computed. It is concluded that this cost is about 1.5 per cent of the country's national product. In Appendix 3 an impressive example is given of the trend of costs and benefits that can be attributed to investment in road-safety measures.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
The European Union has expanded significantly in recent years. Sustainable trade within the Union, leading to economic growth to the benefit of the ‘old’ and ‘new’ member states is thus extremely important. The road infrastructure is strategic and vital to such development since an uneven transport infrastructure, in terms of capacity and condition, has the potential to reinforce uneven development trends and hinder economic convergence of old and new member states. In the decades since their design and construction, loading conditions have significantly changed for many major highway infrastructure elements/networks owing primarily to increased freight volumes and vehicle sizes. This, coupled with the gradual deterioration of a significant number of highway structures due to their age, and the absence of a pan-European assessment framework, can be expected to affect the smooth functioning of the infrastructure in its as-built condition. Increased periods of reduced flow can be expected owing to planned and unplanned interventions for repair/rehabilitation. This paper reports the findings of a survey regarding the current status of the highway infrastructure elements in six countries within the European Union as reported by the owners/operators. The countries surveyed include a cross-section of ‘existing’ older countries and ‘new’ member states. The current situations for bridges, culverts, tunnels and retaining walls are reported, along with their potential replacement costs. The findings act as a departure point for further studies in support of a centralised and/or synchronised EU approach to infrastructure maintenance management. Information in the form presented in this paper is central to any future decision-making frameworks in terms of trade route choice and operations, monetary investment, optimised maintenance, management and rehabilitation of the built infrastructure and the economic integration of the newly joined member states.
Resumo:
Public Lightning is an important part of municipality’s nighttime landscape. Lighting can be used to enhance public safety and security while improving the aesthetic appeal of the surrounding properties but with the current global financial crisis, such lighting systems must also be sustainable. Most climate policy efforts focus on the state and international level, however national governments won’t be able to meet their international commitments without local action. In Portugal, the Public Lighting is responsible for 3% of energy consumption. The problem is that the trend is to increase (about 4-5% per year) which represents very high costs for the municipal authorities. In terms of numbers are analyzed in this thesis 45 of 278 existent in Continental Portugal what represents only 16,2 % of the counties. This where the local authorities in Portugal that had a Sustainable Energy Action Plan (SEAP) that had been accepted and made available in the Covenant of Mayors website until the end of year 2013. It is important that the Covenant of Mayors will increase the local authorities awareness for energy efficiency and especially to public lighting because there is still a long way to go in terms of energy consumption reduction. In future works it would be interesting to see the payback of the EolGreen post in a real scenario due to lack of energy consumption from the grid it would allow to have a pretty high initial investment even with the maintenance that those technologies need.
Resumo:
Hazardous materials are substances that, if not regulated, can pose a threat to human populations and their environmental health, safety or property when transported in commerce. About 1.5 million tons of hazardous material shipments are transported by truck in the US annually, with a steady increase of approximately 5% per year. The objective of this study was to develop a routing tool for hazardous material transport in order to facilitate reduced environmental impacts and less transportation difficulties, yet would also find paths that were still compelling for the shipping carriers as a matter of trucking cost. The study started with identification of inhalation hazard impact zones and explosion protective areas around the location of hypothetical hazardous material releases, considering different parameters (i.e., chemicals characteristics, release quantities, atmospheric condition, etc.). Results showed that depending on the quantity of release, chemical, and atmospheric stability (a function of wind speed, meteorology, sky cover, time and location of accidents, etc.) the consequence of these incidents can differ. The study was extended by selection of other evaluation criteria for further investigation because health risk as an evaluation criterion would not be the only concern in selection of routes. Transportation difficulties (i.e., road blockage and congestion) were incorporated as important factor due to their indirect impact/cost on the users of transportation networks. Trucking costs were also considered as one of the primary criteria in selection of hazardous material paths; otherwise the suggested routes would have not been convincing for the shipping companies. The last but not least criterion was proximity of public places to the routes. The approach evolved from a simple framework to a complicated and efficient GIS-based tool able to investigate transportation networks of any given study area, and capable of generating best routing options for cargos. The suggested tool uses a multi-criteria-decision-making method, which considers the priorities of the decision makers in choosing the cargo routes. Comparison of the routing options based on each criterion and also the overall suitableness of the path in regards to all the criteria (using a multi-criteria-decision-making method) showed that using similar tools as the one proposed by this study can provide decision makers insights in the area of hazardous material transport. This tool shows the probable consequences of considering each path in a very easily understandable way; in the formats of maps and tables, which makes the tradeoffs of costs and risks considerably simpler, as in some cases slightly compromising on trucking cost may drastically decrease the probable health risk and/or traffic difficulties. This will not only be rewarding to the community by making cities safer places to live, but also can be beneficial to shipping companies by allowing them to advertise as environmental friendly conveyors.
Resumo:
Les méthodes de design et de construction des routes développés dans le sud canadien ont maintenant besoin d’être adaptés aux environnements nordiques du pays afin de prévenir le dégel dramatique du pergélisol lors de la construction d’une nouvelle route. De plus, le réchauffement climatique occasionne présentement d’importants problèmes de stabilité des sols dans le nord canadien. Ces facteurs causent des pertes importantes au niveau des capacités fonctionnelles et structurales de l’Alaska Highway au Yukon sur un segment de plus de 200 km situé entre le village de Destruction Bay et la frontière de l’Alaska. Afin de trouver des solutions rentables à long terme, le ministère du transport du Yukon (en collaboration avec le Federal Highway Administration du gouvernement américain, Transports Canada, l’Université Laval, l’Université de Montréal et l’Alaska University transportation Center) a mis en place 12 sections d’essais de 50 mètres de longueur sur l’autoroute de l’Alaska près de Beaver Creek en 2008. Ces différentes sections d’essais ont été conçues pour évaluer une ou plusieurs méthodes combinées de stabilisation thermique telles que le drain thermique, le remblai à convection d’air, le pare-neige / pare-soleil, le remblai couvert de matières organiques, les drains longitudinaux, le déblaiement de la neige sur les pentes et la surface réfléchissante. Les objectifs spécifiques de la recherche sont 1) d’établir les régimes thermiques et les flux de chaleur dans chacune des sections pour les 3 premières années de fonctionnement ; 2) de documenter les facteurs pouvant favoriser ou nuire à l’efficacité des systèmes de protection et ; 3) de déterminer le rapport coûts/bénéfices à long terme pour chacune des techniques utilisées. Pour ce faire, une nouvelle méthode d’analyse, basée sur la mesure de flux d’extraction de chaleur Hx et d’induction Hi à l’interface entre le remblai et le sol naturel, a été utilisée dans cette étude. Certaines techniques de protection du pergélisol démontrent un bon potentiel durant leurs 3 premières années de fonctionnement. C’est le cas pour le remblai à convection d’air non-couvert, le remblai à convection d’air pleine largeur, les drains longitudinaux, le pare-soleil / pare-neige et la surface réfléchissante. Malheureusement, des problèmes dans l’installation des drains thermiques ont empêché une évaluation complète de leur efficacité.