989 resultados para Project organisation


Relevância:

30.00% 30.00%

Publicador:

Resumo:

 The project developed and disseminated, through a distributed leadership approach, an overall framework for the quality management of online learning environments (OLEs) in Australian higher education. The Six Elements of the Online Learning Environment (6EOLE) Quality Management Framework and its guidelines was constructed based on various data collection methods deployed in the project.

The 6EOLE Quality Management Framework, displayed on page six, and accompanying guidelines (i.e. An evidence-based approach to implementation, and A condensed guide) can be used to guide management action to assure and continuously improve the quality of an organisation’s OLE where environmental factors are relatively stable, at least for a period....


This report shows how the project’s objectives were achieved through the project approach and methodology, which in turn led to a set of project outcomes and key deliverables. Moreover, a consideration of these key outcomes and deliverables has led to the presentation of recommendations to the Office for Learning and Teaching and the higher education sector. We argue these recommendations are pertinent to the consideration of distributed leadership and the quality management of OLEs at any tertiary institution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Systemic Science (systems thinking) provides a structured approach to better conceptualise and operationalise problems and to deal with complexity, uncertainty and risk. Systemic Science is different from traditional forms of scientific investigation because it focuses on 'the whole' rather than the component parts.

Systemic science is a skill that DPI generally lacks, although certain sections of the organisation do employ its principles with success. The objective of this project was to enhance DPI's existing systems thinking capability, with particular emphasis on FFSR, to develop the skills in more staff across the organisation, and to showcase the merits of the approach by applying the concepts on existing/planned projects. This report details ‘Phase 2’ (year 2) of the project and as such, outputs from the separate ‘Phase 1’ are not reported here.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ocean acidification is predicted to impact the structure and function of all marine ecosystems in this century. As focus turns towards possible impacts on interactions among marine organisms, its effects on the biology and transmission potential of marine parasites must be evaluated. In the present study, we investigate two marine trematode species (Philophthalmus sp. and Parorchis sp., both in the family Philophthalmidae) infecting two marine gastropods. These trematodes are unusual in that their asexually multiplying stages within snails display a division of labour, with two distinct castes, a large-bodied morph producing infective stages and a smaller morph playing a defensive role against other competing parasites. Using a potentiometric ocean acidification simulation system, we test the impacts of acidified seawater (7.8 and 7.6 pH) on the production of free-living infective stages (cercariae), the size and survival of encysted resting stages (metacercariae), and the within-host division of labour measured as the ratio between numbers of the two morphs. In general, low pH conditions caused an increase in cercarial production and a reduction in metacercarial survival. The ratio of the two castes within snail hosts tended to shift towards more of the smaller defensive morphs under low pH. However, the observed effects of reduced pH were species specific and not always unimodal. These results suggest that ocean acidification can affect the biology of marine parasites and may also impact transmission success and parasite abundance of some trematodes, with possible consequences for marine communities and ecosystems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Indian petroleum industry is passing through a very dynamic business environment due to the liberalisation of many government policies, vertical integration among organisations and the presence of multinational companies. This caused a competitive environment among the organisations in the Indian petroleum industry in the public sector. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered one of the means for remaining competitive in this business environment. However, present project management practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the issues in managing projects of the organisation in the Indian petroleum sector with the involvement of the executives in a workshop environment. This also suggests some remedial measures for resolving those issues through identifying critical success factors and enablers. The enablers not only resolve the present issues but also ensure superior performance. These are analysed in a quantitative framework to derive improvement measures in project management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2004, the Royal Pharmaceutical Society of Great Britain (RPSGB) funded research on teaching, learning and assessment within the UK undergraduate pharmacy degree (MPharm), including the compulsory final year project. Documentary analysis showed that all schools met the project requirement, although there were wide variations in the relative contribution of the project to the final year mark and the degree classification. Interviews with staff revealed that organisation of research projects was complex and time consuming and exacerbated by increasing student numbers and the impact of research ethics. 61% of students, surveyed via a self-completion questionnaire (response rate 50.6%) perceived the research project to be very or fairly important. Whilst 47% considered that they had enough choice of topic and 37% said that their training in research methods provided a good foundation for their project, this suggests scope for improvement. In the UK, there are legislative changes impending which may provide an opportunity to review the future purpose and feasibility of a "significant" final year project within the MPharm.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines the extent to which a learning organisation perspective is attainable in small- to medium-sized manufacturing companies. An audit tool is developed from the literature on organisational learning and recognised processes that lead towards becoming a learning organisation. The paper focuses on the application of the audit tool in three UK automotive component suppliers which are all experiencing pressures for change imposed by the major vehicle manufacturers. The main changes are concerned with tiering of the supply chain and substantial delegation of responsibilities to component suppliers including an increasing emphasis on innovation and continuous improvement. The companies presented in the paper are taken from a research project into the impact of changes in supply chain relationships on the operation of small- and medium-sized manufacturing firms in the West Midlands region of the UK. The ways in which the companies are responding to change are presented together with the results of a self-assessment using the developed audit tool. These results suggest that companies of this type tend to focus on change in those areas that involve least challenge to the established power and authority of management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this project was to develop the education work of an environmental pressure group. The research devised and implemented a project to produce multi-media teaching packs on the urban environment. Whilst this involved understanding environmental education it was necessary to research beyond this to include the various structural and dynamic constraints on change in the field. This presented a number of methodological difficulties; from the resolution of which a model of the research process involved in this project has been developed. It is argued that research oriented towards practical change requires the insights of an experienced practitioner to be combined with the rigours of controlled systematic enquiry. Together these function as a model-building process encompassing intuition, induction and deduction. Model testing is carried out through repeated intervention in the field; thus an interplay between researcher and client ensues such that the project develops in a mutually acceptable direction. In practice, this development will be both unpredictable and erratic. Although the conclusions reached here are based on a single case study they address general methodological issues likely to be encountered in different field settings concerned with different practical problems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ez a tanulmány a projektvezetési szakirodalomban kialakult ismeretanyagot szem előtt tartva (noha tételesen nem hivatkozva arra) tárja fel azt a sajátos és tipikusnak nevezhető kontextust, amelyben a projektalapú szervezetek projektmarketing tevékenysége megnyilvánul. A tanulmány célja tehát nem magának a projektmarketingnek a kérdéskörére irányul, hanem elsősorban annak projektspecifikus kontextusára. Jellegét illetően a tanulmány spekulatív jellegű, vagyis lényegét tekintve nem empirikus kutatási eredményekből levont következtetésekre épül. _____ Traditional approach to project marketing focuses on process-related aspects of the marketing efforts of project- based organisations. This paper is different. Unlike to the traditional approach it highlights the decisive contextual features of project marketing, bearing in mind the typical project business from the point of view of project-based organisations. These features include: a) instead of physically existing products project-based organisations need to sell their ability to create the project outcome physically; b) the project outcome and the conditions of implementation are defined by the project client; c) project clients are involved in creating the project outcome; d) project implementation strategy applied in a client organisation may vary project by project. These determining contextual features shape to a great extent the actual competitive position of the project-based organisations which may vary project by project even in relation to the very same project client.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Az államigazgatásban – itthon és külföldön is – a projektek jelentős százaléka időben csúszik, nem azt eredményezi, amit eredetileg elvártak, a szakmai résztvevők szerint túladminisztrált, a munkatársak tevékenysége nem áttekinthető. Ezeknek a problémáknak a nagy része a projektszervezet és a hierarchikusfunkcionális- hivatali szervezet egymás mellett éléséből és a nehezen szinkronizálható együttműködésből fakad. A cikkben egy, a gyakorlatban bevált módszertant mutat be a szerző, amely adott feltételrendszer mellett nagymértékben kiküszöböli a fent említett hiányosságokat és a szervezet napi működésébe illeszkedő tevékenységek sorozatára vezeti vissza a projekttevékenységeket. A módszer egy gyakorlati problémából – a volt APEH-es és VP-s rendszerek integrálása a NAV-ba – indult ki, azonban a szerző véleménye szerint alkalmazható más, funkcionális alapokon felépülő szervezetnél is. _____ The high percentage of public sector projects slips in time, the result is not that what was expected initially, those are overadministrated by according to the professional participants’ opinion, and the activity of staff does not clear. In this article the author describes a best practice methodology, which led the project activities to series of activities which fit to the organization’s daily operations. The method started from a practical problem, but according to the author’s opinion it can be applied to other structured functional basis organizations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increased complexity in large design and manufacturing organisations requires improvements at the operations management (OM)–applied service (AS) interface areas to improve project effectiveness. The aim of this paper is explore the role of Lean in improving the longitudinal efficiency of the OM–AS interface within a large aerospace organisation using Lean principles and boundary spanning theory. The methodology was an exploratory longitudinal case approach including exploratory interviews (n = 21), focus groups (n = 2), facilitated action-research workshops (n = 2) and two trials or experiments using longitudinal data involving both OM and AS personnel working at the interface. The findings draw upon Lean principles and boundary spanning theory to guide and interpret the findings. It was found that misinterpretation, and forced implementation, of OM-based Lean terminology and practice in the OM–AS interface space led to delays and misplaced resources. Rather both OM and AS staff were challenged to develop a cross boundary understanding of Lean-based boundary (knowledge) objects in interpreting OM requests. The longitudinal findings from the experiments showed that the development of Lean Performance measurements and lean Value Stream constructs was more successful when these Lean constructs were treated as boundary (knowledge) objects requiring transformation over time to orchestrate improved effectiveness and in leading to consistent terminology and understanding between the OM–AS boundary spanning team.