961 resultados para Program C : Delivery Management of Built Assets


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sending data between the construction site and an off-site design office is one of the more problematic areas in information technology for construction automation, particularly for construction defect management. The aim of this research is to investigate how mobile computing and new forms of human-computer interaction can be brought to bear on specific problems in construction management. The construction defect reporting system is one such application. Combining mobile and wireless computing technologies with a digital workbench, we have developed a system to facilitate remote telecollaboration between a construction site and an off-site engineering office. The application reported in this paper demonstrates how construction defect reporting can be streamlined by field collection of construction defect information using a mobile device and visualising the defect in a CAD model on a digital workbench in an engineering office. This paper reports on the design of the system and our tests of sending images from the construction site to the engineer’s office and positional accuracy of GPS for localization of the defect.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Automated Scheduler is a prototype software tool that automatically prepares a construction schedule together with a 4D simulation of the construction process from a 3D CAD building model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Queensland Department of Public Works (DPW) holds a significant interest in the Brisbane Central Business District (CBD) in controlling approximately 20 percent of the office space within its confines. This comprises a total of 333,903 square metres of space, of which 170,111 square metres is owned and 163,792 square metres is leased from the private sector. The department’s nominal ownership extends to several enduring, landmark buildings as well as several modern office towers. The portfolio includes the oldest building in the CBD, being the former Commissariat Stores building and one of the newest, a 15,000 square metre office tower under construction at 33 Charlotte Street.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most investors look at the initial return (or yield) that they will receive from an investment property, but this is only part of the picture. The more important issue is what capital appreciation will be achieved. Unless an investment property will deliver substantial capital appreciation, it is unlikely to be a good investment in financial terms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The overall goal of the project was to provide a tool for improved investment decision making for functional performance of investment property. The evaluation examines both ex post and ex ante building performance within operational and investment contexts and considers the resultant financial, environmental and social impacts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This publication, summarising outcomes of an investigation into eTendering as a part of a CRC Construction Innovation research project, presents guidelines and recommendations to be considered when implementing eTendering systems, procedures and policies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In line with developments overseas Australian clients are turning to considerations of value in project procurement. Until the 1980s the industry operated in a largely traditional manner however the extremely adversarial behaviour exhibited during towards the end of the decade led to a number of significant events and initiatives including the publication of “No Dispute”, the Gyles Royal Commission into the Building Industry, the Construction Industry Development Agency (CIDA) and the work of the Australian Procurement and Construction Council (APCC). A number of research projects in progress in the CRC for Construction Innovation (CRC CI) are focussing on the assessment of value and methodologies to support the delivery of value in the procurement and management of engineering and construction projects. This paper charts the emergence of several key drivers in the process and illustrates how they can be integrated into a comprehensive Decision Support System that balances value to stakeholders with project imperatives and incorporates a lessons learned data base which enriches the decision making process to optimise delivery method design and selection.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.