937 resultados para Ohio and Pennsylvania Rail-Road Company.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Indenture of deed of land situate between The St. Catharines and Niagara Central Railway Company and Samuel DeVeaux Woodruff of St. Catharines regarding parts of Lots no. 12 and 13 30 in the 8th Concession of the Township of Grantham. This was registered at Merritton on Feb. 2, 1891 – instrument no. 1021, Aug. 16, 1890.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agreement to undertake construction and complete the road in accordance with the engineer or the Port Robinson and Thorold macadamized road. This is signed by John Williams, Aug. 11, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter containing specifications for the construction of the Port Robinson and Thorold macadamized road sent to Matthews from S.D. Woodruff (3 pages, handwritten), Aug. 25, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to S.D. Woodruff regarding a resolution passed on May 17, 1856 by the Board of Directors of the Port Robinson and Thorold Macadamized Road Committee This is signed by Duncan McFarland, president, May 27, 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to S.D. Woodruff regarding resolution #5 of the Board of Directors. Mr. Woodruff is requested to take steps to ensure the early completion of the Port Dalhousie and Thorold macadamized road. This is signed by James McCoppen, president. The letter is stained and worn torn in spots. This does not affect the text, July 11, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter from S.D. Woodruff to the president and directors of the Port Robinson and Thorold Macadamized Road Committee regarding extra work done (3 pages, handwritten), Aug. 6, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Note showing the return of time for the preliminary survey of the Port Robinson and Thorold macadamized road for March and April, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Note regarding the number of days Fred Holmes was employed upon the Port Robinson and Thorold macadamized road during the months of July and August. This is signed by S.D. Woodruff and Fred Holmes, November, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate for Fred Holmes and William Baird for time on the Port Robinson and Thorold Macadamized Road during the months of September, October and November, 1856. This was sent to S.D. Woodruff by Fred Holmes, Nov.29, 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to present three new methods for color detection and segmentation of road signs. The images are taken by a digital camera mounted in a car. The RGB images are converted into IHLS color space, and new methods are applied to extract the colors of the road signs under consideration. The methods are tested on hundreds of outdoor images in different light conditions, and they show high robustness. This project is part of the research taking place in Dalarna University / Sweden in the field of the ITS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this FAL Bulletin is to provide a comprehensive analysis of safety and security in road freight operations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 1966, when the annual damage survey was initiated, Dr. C. R. Weaver, Statistician at the Ohio Agriculture Research and Development Center, Wooster, Ohio, drew up a sampling plan, balancing costs against desired precision. The plan included three combinations of fields to be sampled and stations per field for high damage areas, three combinations for moderate damage areas, and two combinations for light damage areas. Alternatives for the high damage area included (1) 497 fields with two stations per field (± .48), (2) 775 fields with two stations per field (± .26), and (3) 235 fields with ten stations per field (— .68). For the moderate damage areas, the alternatives were (1) 441 fields with three stations per field (± .26), (2) 155 fields with three stations per field (± .50), and (3) 235 fields with ten stations per field (± .32). The light dam¬age area alternatives were (1) 297 fields with three stations per field (- .26), and (2) 81 fields with three stations per field (± .50). The original survey in 1966 sampled eight counties in three regions. In 1967, 14 counties in the same three regions were sampled. Two new counties were added to one region and two new regions with two counties each (treated as one region for sampling purposes) were added to the 1968 survey. The 1968 survey was of sufficient size to be representative of the corn damage picture in Ohio and Southeast Michigan. The 1969 survey was identical to the 1968 survey.