951 resultados para Master Plan for Aeronautical Infrastructures


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years unmanned vehicles have grown in popularity, with an ever increasing number of applications in industry, the military and research within air, ground and marine domains. In particular, the challenges posed by unmanned marine vehicles in order to increase the level of autonomy include automatic obstacle avoidance and conformance with the Rules of the Road when navigating in the presence of other maritime traffic. The USV Master Plan which has been established for the US Navy outlines a list of objectives for improving autonomy in order to increase mission diversity and reduce the amount of supervisory intervention. This paper addresses the specific development needs based on notable research carried out to date, primarily with regard to navigation, guidance, control and motion planning. The integration of the International Regulations for Avoiding Collisions at Sea within the obstacle avoidance protocols seeks to prevent maritime accidents attributed to human error. The addition of these critical safety measures may be key to a future growth in demand for USVs, as they serve to pave the way for establishing legal policies for unmanned vessels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of the POBICOS project is a platform that facilitates the development and deployment of pervasive computing applications destined for networked, cooperating objects. POBICOS object communities are heterogeneous in terms of the sensing, actuating, and computing resources contributed by each object. Moreover, it is assumed that an object community is formed without any master plan; for example, it may emerge as a by-product of acquiring everyday, POBICOS-enabled objects by a household. As a result, the target object community is, at least partially, unknown to the application programmer, and so a POBICOS application should be able to deliver its functionality on top of diverse object communities (we call this opportunistic computing). The POBICOS platform includes a middleware offering a programming model for opportunistic computing, as well as development and monitoring tools. This paper briefly describes the tools produced in the first phase of the project. Also, the stakeholders using these tools are identified, and a development process for both the middleware and applications is presented. © 2009 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Urban Oasis celebrates Ajman’s history as well as encourages a greater future. Stitching into the existing urban fabric of Ajman and the surrounding cities, the master plan provides an entrance that encases a number of different events. From studying other successful event cities, it became apparent the need for a variety of events over a yearly basis.

Sustainability is another key feature of the master plan. From the way the urban network of streets are formed and orientated to how energy is produced and conserved. Another sustainable aspect that drove the master plan was the retention of the camel track. An important and incredible event in itself, the camel track provides an opportunity to celebrate Ajman’s culture and retain an important part of its history.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O projeto foi realizado na Toyota (divisão fabril de Ovar), no ano letivo 2014/2015, teve por base um estágio extracurricular que foi realizado para que desta forma tomasse contacto com uma realidade concreta e absoluta no contexto empresarial. O estágio serviu, principalmente, como uma experiência na compreensão do funcionamento de uma indústria de automóveis. Este projeto desenvolve-se no âmbito do 2ºano do Mestrado de Logística e apresenta os contributos desenvolvidos no departamento de logística para a reorganização da mesma para a produção de um novo modelo automóvel. Atualmente, a Toyota, para os modelos de automóveis que produz, recebe os componentes em CKD (Completed Knocked Down) provenientes do Japão em lotes de cinco unidades. Estes lotes são armazenados no armazém, de onde só saem quando for dada ordem para serem produzidos. Cada lote tem várias caixas, que são colocadas à vez numa zona comum de abertura. São retidos os componentes das caixas CKD e colocados nos transportadores próprios dos postos correspondentes (supermercado de linha). Isto significa que sempre que é solicitado uma viatura de um determinado lote, são obrigados a produzir as cinco unidades. Isto significa que as restantes unidades do lote terão que ficar em parque aberto a aguardar venda futura, para além de ter um stock desnecessário, estas unidades ficam vulneráveis e sofrem desgaste, pois estão expostas à intempérie, causando graves problemas de qualidade e respetivos custos associados. Recentemente, foi decidida a produção do modelo Land Cruiser 70 na unidade industrial de Ovar, Portugal, o que obrigou a uma reorganização da produção e processos logísticos para a sua produção. Os objetivos que a empresa pretende com a entrada de um novo projeto Land Cruiser 70, são os seguintes: Alterar o sistema de abastecimento, implementando o abastecimento unitário em toda a fábrica para o novo modelo, garantindo o “one by one production”; Definir o funcionamento do processo logístico desde a chegada dos componentes até ficarem disponíveis no supermercado de linha. Para isso será necessário dimensionar armazém e zona de abertura, definir layouts e quantidade de stocks, bem como definir sistemas de comunicação entre abertura e supermercado; Verificar as peças que vão fazer parte do chassi por posto e contabilizar os dolly´s1 necessários; Fazer o layout de abastecimento da linha do chassi; Calcular o tempo de abertura, de abastecimento e de picking do chassi e de triming. Este projeto tem em conta a política de melhoria contínua de forma a conseguir satisfazer o cliente (ser eficaz) utilizando cada vez menos recursos quer físicos quer humanos (ser eficiente, detetar e eliminar os desperdícios). O presente projeto foi inserido na equipa de melhoria contínua da logística, maioritariamente no chassi. Em termos globais, os objetivos propostos neste estágio foram atingidos com êxito.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente relatório descreve o Estágio Curricular desenvolvido na instituição pública Agência Portuguesa do Ambiente (APA) I.P./ Administração da Região Hidrográfica do Norte (ARHN), na Divisão dos Recursos Hídricos do Litoral (DRHL) no Porto, no âmbito do Mestrado em Engenharia Civil, ramo de Infraestruturas, do Instituto Superior de Engenharia do Porto (ISEP). Os principais objetivos do Estágio prendem-se com a gestão de zonas costeiras, particularizando-se o caso na orla costeira Caminha-Espinho. Dá-se especial enfoque ao estudo da erosão costeira, suas consequências e soluções que a possam minimizar. Este estudo divide-se em três trabalhos principais. O primeiro identifica e caracteriza as ocupações situadas no Domínio Público Marítimo (DPM), no troço de costa em estudo. No segundo, estima-se o balanço sedimentar ocorrido durante uma década com recurso a informação geográfica (altimétrica) de 2001 e 2011. Por fim, o terceiro trabalho apresenta algumas intervenções de defesa costeira, que foram possíveis de visitar durante a sua fase de execução. As principais ferramentas utilizadas para este estudo foram softwares de Sistemas de Informação Geográfica (SIG), como o ArcGis ou o QGIS. Estes três trabalhos encontram-se em anexo a este relatório.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Portugal, having responsibilities at European level, needs to ensure compliance with European standards, particularly with regard to the European Security Plan for Critical Infrastructures. National critical infrastructures should be a focus of attention with regard to the management of public risks, since these represent "a set of services that are essential to the functioning of the country and the functioning of the forces that ensure national defense." (Soares, 2008) This contribution on national critical infrastructures (CI) has the essential objective of clarifying the development of the strategy adopted by Portugal in pursuit of the security of these fundamental infrastructures. The goal lies not only through producing a descriptive document, but also carry a brief confrontation between the legal framework related to these subjects and the reality in which the Critical Infrastructure Operators and the National Civil Protection Authority (ANPC) operate. It is intended, in this sense, to understand the development of the project for the national security program of critical infrastructures and what effects of its measures on operators. As for the methodology, we followed a methodological strategy, where we combine the literature with data obtained through semi-structured interviews. Portugal, being a geographically peripheral country and having no record of incidents capable of causing major contingencies in key services for the normal development of society, does not have a structured and regulator plan that substantiates the need for operators responsible for CI to invest in security. This same approach is expected at the State level, believing that even though this theme has be widely explored by international institutions, Portugal has not yet tried to give the attention it deserves. Without the existence of an institution and a regulatory system, CI operators can become less available to comply with the legal framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In modern society, energy consumption and respect for the environment have become essential aspects of urban planning. The rising demand for alternative sources of energy, coupled with the decline in the construction sector and material usage, gives the idea that the thinking on modern cities, where attention is given to reduced energy consumption, savings, waste recycling and respect for the surrounding environment, is being put into practice. If we examine development of the city over recent centuries, by means of the theories of the most famous and influential urban planners, it is possible to identify the major problems caused by this type of planning. For this reason, in recent urban planning the use of systems of indicators that evaluate and certify land environmentally and energetically guides the master plan toward a more efficient city model. In addition the indicators are targeted on key factors determined by the commissioner or the opportunities the territory itself provides. Due the complexity of the environmental mechanics, the process of design and urban planning has become a challenging issue. The introduction of the indicators system has made it possible to register the life of the process, with a spiral route that allows the design itself to be refined. The aim of this study, built around the creation of a system of urban sustainability indicators that will evaluate highly eco-friendly cities, is to develop a certification system for cities or portions of them. The system will be upgradeable and objective, will employ real data and will be concerned with energy production and consumption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students. Pictured here is the tower and university centre. The view is looking east towards a cluster of science buildings and residences in the background.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students. Pictured here is the tower and behind it, in the lower left portion of the picture, the planned outdoor amphitheatre. This view is from the edge of the escarpment facing southward or southeast.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students. Pictured here is the tower and main entrance to the university. To the left is a planned administration building. The original plans also called for a miniature canal running between the boulevard at the entrance which would then pass through an underground system and open up into a waterfall at the brink of the escarpment behind the tower.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Model layout of the 3 stage residence expansion to the university proposed in September of 1967. This was a revision of the original master plan which called for high rise residences east of the Tower rather then the sprawling residences shown here. Although modified slightly from the model, the first stage of the residence would become a reality in the form of the Decew Residence. The realization of the second stage would also eventually take place when the Gordon and Betty Vallee Residence was constructed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Model layout of the 3 stage residence expansion to the university proposed in September of 1967. This was a revision of the original master plan which called for high rise residences east of the Tower rather then the sprawling residences shown here. Although modified slightly from the model, the first stage of the residence would become a reality in the form of the Decew Residence. The realization of the second stage would also eventually take place when the Gordon and Betty Vallee Residence was constructed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This map shows the entire campus master plan and details what each area of land would be used for.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Phase 1 Map of the Master Plan showing the Tower and Thistle Complex, along with some additional buildings and the main parking lot. Note the location of the Central Utilities Building to the east differs from it's actual location along the escarpment.