974 resultados para Load demand


Relevância:

30.00% 30.00%

Publicador:

Resumo:

More and more households are purchasing electric vehicles (EVs), and this will continue as we move towards a low carbon future. There are various projections as to the rate of EV uptake, but all predict an increase over the next ten years. Charging these EVs will produce one of the biggest loads on the low voltage network. To manage the network, we must not only take into account the number of EVs taken up, but where on the network they are charging, and at what time. To simulate the impact on the network from high, medium and low EV uptake (as outlined by the UK government), we present an agent-based model. We initialise the model to assign an EV to a household based on either random distribution or social influences - that is, a neighbour of an EV owner is more likely to also purchase an EV. Additionally, we examine the effect of peak behaviour on the network when charging is at day-time, night-time, or a mix of both. The model is implemented on a neighbourhood in south-east England using smart meter data (half hourly electricity readings) and real life charging patterns from an EV trial. Our results indicate that social influence can increase the peak demand on a local level (street or feeder), meaning that medium EV uptake can create higher peak demand than currently expected.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of mean values of thermal and electric demand can be justifiable for synthesising the configuration and for estimating the economic results because it simplifies the analysis in a preliminary feasibility study of a cogeneration plant. For determining the cogeneration scheme that best fits the energetic needs of a process several cycles and combinations must be considered, and those technically feasible will be analysed according to economic models. Although interesting for a first approach, this procedure do not consider that the peaks and valleys present in the load patterns will impose additional constraints relatively to the equipment capacities. In this paper, the effects of thermal and electric load fluctuation to the cogeneration plant design were considered. An approach for modelling these load variability is proposed for comparing two competing thermal and electric parity competing schemes. A gas turbine associated to a heat recovery steam generator was then proposed and analysed for thermal- and electric-following operational strategies. Thermal-following option revealed to be more attractive for the technical and economic limits defined for this analysis. (c) 2006 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a method for calculating the power flow in distribution networks considering uncertainties in the distribution system. Active and reactive power are used as uncertain variables and probabilistically modeled through probability distribution functions. Uncertainty about the connection of the users with the different feeders is also considered. A Monte Carlo simulation is used to generate the possible load scenarios of the users. The results of the power flow considering uncertainty are the mean values and standard deviations of the variables of interest (voltages in all nodes, active and reactive power flows, etc.), giving the user valuable information about how the network will behave under uncertainty rather than the traditional fixed values at one point in time. The method is tested using real data from a primary feeder system, and results are presented considering uncertainty in demand and also in the connection. To demonstrate the usefulness of the approach, the results are then used in a probabilistic risk analysis to identify potential problems of undervoltage in distribution systems. (C) 2012 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents two mathematical models and one methodology to solve a transmission network expansion planning problem considering uncertainty in demand. The first model analyzed the uncertainty in the system as a whole; then, this model considers the uncertainty in the total demand of the power system. The second one analyzed the uncertainty in each load bus individually. The methodology used to solve the problem, finds the optimal transmission network expansion plan that allows the power system to operate adequately in an environment with uncertainty. The models presented are solved using a specialized genetic algorithm. The results obtained for several known systems from literature show that cheaper plans can be found satisfying the uncertainty in demand.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Multinodal load forecasting deals with the loads of several interest nodes in an electrical network system, which is also known as bus load forecasting. To perform this demand, it is necessary a technique that is precise, trustable and has a short-time processing. This paper proposes two methodologies based on general regression neural networks for short-term multinodal load forecasting. The first individually forecast the local loads and the second forecast the global load and individually forecast the load participation factors to estimate the local loads. To design the forecasters it wasn't necessary the previous study of the local loads. Tests were made using a New Zealand distribution subsystem and the results obtained are compatible with the ones founded in the specialized literature. © 2011 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electric power grids throughout the world suffer from serious inefficiencies associated with under-utilization due to demand patterns, engineering design and load following approaches in use today. These grids consume much of the world’s energy and represent a large carbon footprint. From material utilization perspectives significant hardware is manufactured and installed for this infrastructure often to be used at less than 20-40% of its operational capacity for most of its lifetime. These inefficiencies lead engineers to require additional grid support and conventional generation capacity additions when renewable technologies (such as solar and wind) and electric vehicles are to be added to the utility demand/supply mix. Using actual data from the PJM [PJM 2009] the work shows that consumer load management, real time price signals, sensors and intelligent demand/supply control offer a compelling path forward to increase the efficient utilization and carbon footprint reduction of the world’s grids. Underutilization factors from many distribution companies indicate that distribution feeders are often operated at only 70-80% of their peak capacity for a few hours per year, and on average are loaded to less than 30-40% of their capability. By creating strong societal connections between consumers and energy providers technology can radically change this situation. Intelligent deployment of smart sensors, smart electric vehicles, consumer-based load management technology very high saturations of intermittent renewable energy supplies can be effectively controlled and dispatched to increase the levels of utilization of existing utility distribution, substation, transmission, and generation equipment. The strengthening of these technology, society and consumer relationships requires rapid dissemination of knowledge (real time prices, costs & benefit sharing, demand response requirements) in order to incentivize behaviors that can increase the effective use of technological equipment that represents one of the largest capital assets modern society has created.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With recent technological developments within the field of power conditioning and the progressive decrease of incentives for PV electricity in grid-connected markets, new operation modes for PV systems should be explored beyond the traditional maximization of PV electri city feed-in. An example can be found in the domestic sector, where the use of modern PV hybrid systems combin ed with efficient electrical appliances and demand side management strategies can significantly enhance the PV value for the user. This paper presents an active demand side management system able to displace the consumer’s load curve in response to local (PV hybrid system, user) and external conditions (external grid). In this way, th e consumer becomes an “active consumer” that can also cooperate with others and the grid, increasing even more the PV value for the electrical system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The sport of rowing has become more popular in the past decade. While it is a relatively low impact sport, injuries can occur, specifically to the ribs (Karlson K. A., 1998) and more often in female athletes (Hickey, Fricker, & McDonald , 1997). It has been proposed that as the athlete rows, applying a cyclical load to the body, the mid trapezius fatigues and is unable to resist the force produced during the drive phase (Warden S. J., Gutschlag, Wajswelner, & Crossley, 2002). Once this happens, the scapulae are then pulled anterio-laterally which increases the compression force on the ribs, increasing the risk of injury. The rowing motion of 12 female varsity and club rowers was tracked as they completed a fatiguing rowing test on a rowing ergometer. Results showed that the curvature of thoracic spine changed throughout the rowing cycle but did not change with increasing power level. The transverse shoulder angle decreased (the upper back was less straight) as power level increased (R2=-0.69±19), suggesting that the scapula moved anterio-laterally. This may be that as it tired, the mid-trapezius was unable to hold the scapulae in position. The decreasing transverse shoulder angle when the power level is increased indirectly supports the fatiguing of the retractor muscles as a mechanism of injury. It would be valuable to understand the limitations of each athlete and to be able to prescribe the optimal training zone to reduce the risk of injury.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although maximum power point tracking (MPPT) is crucial in the design of a wind power generation system, the necessary control strategies should also be considered for conditions that require a power reduction, called de-loading in this paper. A coordinated control scheme for a proposed current source converter (CSC) based DC wind energy conversion system is presented in this paper. This scheme combines coordinated control of the pitch angle, a DC load dumping chopper and the DC/DC converter, to quickly achieve wind farm de-loading. MATLAB/Simulink simulations and experiments are used to validate the purpose and effectiveness of the control scheme, both at the same power level. © 2013 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since privatisation, maintenance of DNO LV feeder maximum demand information has gradually demised in some Utility Areas, and it is postulated that lack of knowledge about 11kV and LV electrical networks is resulting in a less economical and energy efficient Network as a whole. In an attempt to quantify the negative impact, this paper examines ten postulated new connection scenarios for a set of real LV load readings, in order to find the difference in design solutions when LV load readings were and were not known. The load profiles of the substations were examined in order to explore the utilisation profile. It was found that in 70% of the scenarios explored, significant cost differences were found. These cost differences varied by an average of 1000%, between schemes designed with and without load readings. Obviously, over designing a system and therefore operating more, underutilised transformers becomes less financially beneficial and less energy efficient. The paper concludes that new connection design is improved in terms of cost when carried out based on known LV load information and enhances the case for regular maximum feeder demand information and/or metering of LV feeders. © 2013 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

English has been taught as a core and compulsory subject in China for decades. Recently, the demand for English in China has increased dramatically. China now has the world's largest English-learning population. The traditional English-teaching method cannot continue to be the only approach because it merely focuses on reading, grammar and translation, which cannot meet English learners and users' needs (i.e., communicative competence and skills in speaking and writing). ^ This study was conducted to investigate if the Picture-Word Inductive Model (PWIM), a new pedagogical method using pictures and inductive thinking, would benefit English learners in China in terms of potential higher output in speaking and writing. With the gauge of Cognitive Load Theory (CLT), specifically, its redundancy effect, I investigated whether processing words and a picture concurrently would present a cognitive overload for English learners in China. ^ I conducted a mixed methods research study. A quasi-experiment (pretest, intervention for seven weeks, and posttest) was conducted using 234 students in four groups in Lianyungang, China (58 fourth graders and 57 seventh graders as an experimental group with PWIM and 59 fourth graders and 60 seventh graders as a control group with the traditional method). No significant difference in the effects of PWIM was found on vocabulary acquisition based on grade levels. Observations, questionnaires with open-ended questions, and interviews were deployed to answer the three remaining research questions. A few students felt cognitively overloaded when they encountered too many writing samples, too many new words at one time, repeated words, mismatches between words and pictures, and so on. Many students listed and exemplified numerous strengths of PWIM, but a few mentioned weaknesses of PWIM. The students expressed the idea that PWIM had a positive effect on their English teaching. ^ As integrated inferences, qualitative findings were used to explain the quantitative results that there were no significant differences of the effects of the PWIM between the experimental and control groups in both grade levels, from four contextual aspects: time constraints on PWIM implementation, teachers' resistance, how to use PWIM and PWIM implemented in a classroom over 55 students.^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Power systems require a reliable supply and good power quality. The impact of power supply interruptions is well acknowledged and well quantified. However, a system may perform reliably without any interruptions but may have poor power quality. Although poor power quality has cost implications for all actors in the electrical power systems, only some users are aware of its impact. Power system operators are much attuned to the impact of low power quality on their equipment and have the appropriate monitoring systems in place. However, over recent years certain industries have come increasingly vulnerable to negative cost implications of poor power quality arising from changes in their load characteristics and load sensitivities, and therefore increasingly implement power quality monitoring and mitigation solutions. This paper reviews several historical studies which investigate the cost implications of poor power quality on industry. These surveys are largely focused on outages, whilst the impact of poor power quality such as harmonics, short interruptions, voltage dips and swells, and transients is less well studied and understood. This paper examines the difficulties in quantifying the costs of poor power quality, and uses the chi-squared method to determine the consequences for industry of power quality phenomenon using a case study of over 40 manufacturing and data centres in Ireland.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

English has been taught as a core and compulsory subject in China for decades. Recently, the demand for English in China has increased dramatically. China now has the world’s largest English-learning population. The traditional English-teaching method cannot continue to be the only approach because it merely focuses on reading, grammar and translation, which cannot meet English learners and users’ needs (i.e., communicative competence and skills in speaking and writing). This study was conducted to investigate if the Picture-Word Inductive Model (PWIM), a new pedagogical method using pictures and inductive thinking, would benefit English learners in China in terms of potential higher output in speaking and writing. With the gauge of Cognitive Load Theory (CLT), specifically, its redundancy effect, I investigated whether processing words and a picture concurrently would present a cognitive overload for English learners in China. I conducted a mixed methods research study. A quasi-experiment (pretest, intervention for seven weeks, and posttest) was conducted using 234 students in four groups in Lianyungang, China (58 fourth graders and 57 seventh graders as an experimental group with PWIM and 59 fourth graders and 60 seventh graders as a control group with the traditional method). No significant difference in the effects of PWIM was found on vocabulary acquisition based on grade levels. Observations, questionnaires with open-ended questions, and interviews were deployed to answer the three remaining research questions. A few students felt cognitively overloaded when they encountered too many writing samples, too many new words at one time, repeated words, mismatches between words and pictures, and so on. Many students listed and exemplified numerous strengths of PWIM, but a few mentioned weaknesses of PWIM. The students expressed the idea that PWIM had a positive effect on their English teaching. As integrated inferences, qualitative findings were used to explain the quantitative results that there were no significant differences of the effects of the PWIM between the experimental and control groups in both grade levels, from four contextual aspects: time constraints on PWIM implementation, teachers’ resistance, how to use PWIM and PWIM implemented in a classroom over 55 students.