987 resultados para Land prices
Resumo:
In recent years the air transport industry has experienced unprecedented growth, driven by strong local and global economies. Whether this growth can continue in the face of anticipated oil crises; international economic forecasts and recent influenza outbreaks is yet to be seen. One thing is certain, airport owners and operators will continue to be faced with challenging environments in which to do business. In response, many airports recognize the value in diversifying their revenue streams through a variety of landside property developments within the airport boundary. In Australia it is the type and intended market of this development that is a point of contention between private airport corporations and their surrounding municipalities. The aim of this preliminary research is to identify and categorize on-airport development occurring at the twenty-two privatized Australian airports which are administered under the Airports Act [1996]. This new knowledge will assist airport and municipal planners in understanding the current extent and category of on-airport land use, allowing them to make better decisions when proposing development both within airport master plans and beyond the airport boundary in local town and municipal plans.
Resumo:
This thesis describes outcomes of a research study conducted to investigate the nutrient build-up and wash-off processes on urban impervious surfaces. The data needed for the study was generated through a series of field investigations and laboratory test procedures. The study sites were selected in urbanised catchments to represent typical characteristics of residential, industrial and commercial land uses. The build-up and wash-off samples were collected from road surfaces in the selected study sites. A specially designed vacuum collection system and a rainfall simulator were used for sample collection. According to the data analysis, the solids build-up on road surfaces was significantly finer with more than 80% of the particles below 150 ìm for all the land uses. Nutrients were mostly associated with the particle size range below 150 ìm in both build-up and wash-off samples irrespective of type of land use. Therefore, the finer fraction of solids was the most important for the nutrient build-up and particulate nutrient wash-off processes. Consequently, the design of stormwater quality mitigation measures should target particles less than 150 ìm for the removal of nutrients irrespective of type of land use. Total kjeldahl nitrogen (TKN) was the most dominant form of nitrogen species in build-up on road surfaces. Phosphorus build-up on road surfaces was mainly in inorganic form and phosphate (PO4 3-) was the most dominant form. The nutrient wash-off process was found to be dependent on rainfall intensity and duration. Concentration of both total nitrogen and phosphorus was higher at the beginning of the rain event and decreased with the increase in rainfall duration. Consequently, in the design of stormwater quality mitigation strategies for nutrients removal, it is important to target the initial period of rain events. The variability of wash-off of nitrogen with rainfall intensity was significantly different to phosphorus wash-off. The concentration of nitrogen was higher in the wash-off for low intensity rain events compared to the wash-off for high intensity rain events. On the other hand, the concentration of phosphorus in the wash-off was high for high intensity rain events compared to low intensity rain events. Consequently, the nitrogen washoff can be defined as a source limiting process and phosphorus wash-off as a transport limiting process. This highlights the importance of taking into consideration the wash-off of low intensity rain events in the design of stormwater quality mitigation strategies targeting the nitrogen removal. All the nitrogen species in wash-off are primarily in dissolved form whereas phosphorus is in particulate form. The differences in the nitrogen and phosphorus wash-off processes is principally due to the degree of solubility, attachment to particulates, composition of total nitrogen and total phosphorus and the degree of adherence of the solids particles to the surface to which nutrients are attached. The particulate nitrogen available for wash-off is removed readily as these are mobilised as free solids particles on the surface. Phosphorus is washed-off mostly with the solids particles which are strongly adhered to the surface or as the fixed solids load. Investigation of the nitrogen wash-off process using bulk wash-off samples was in close agreement with the investigation of dissolved fraction of wash-off solids. This was primarily due to the predominant nature of dissolved nitrogen. However, the investigation of the processes which underpin phosphorus wash-off using bulk washoff samples could lead to loss of information. This is due to the composition of total phosphorus in wash-off solids and the inherent variability of the wash-off process for the different particle size ranges. This variability should preferably be taken into consideration as phosphorus wash-off is predominantly in particulate form. Therefore, care needs to be taken in the investigation of the phosphorus wash-off process using bulk wash-off samples to ensure that there is no loss of information and hence result in misleading outcomes. The investigation of different particle size ranges of wash-off solids is preferable in the interest of designing effective stormwater quality management strategies targeting phosphorus removal.
Resumo:
LUPTAI is a decision-aiding tool to enable local and state governments to optimise land use and transport integration. In contrast to mobility between land uses (typically via road), accessibility represents opportunity and choice to reach common land use destinations by public transport and/or walking. LUPTAI uses a GIS-based methodology to quantify and map accessibility to common land use destinations by walking and/or public transport. The tool can be applied to small or large study areas. It can be applied to the current situation in a study area or to future scenarios (such as scenarios involving changes to public transport services, public transport corridors or stations, population density or land use). The tool has been piloted on the Gold Coast and the results are encouraging. This paper outlines the GIS-based methodology and the findings related to this pilot study. The paper demonstrates benefits and possible application of LUPTAI to other urbanised local government areas in Queensland. It also discusses how this accessibility indexing approach could be developed into a decision-support tool to assist local and state government agencies in a range of transport and land-use planning activities.
Resumo:
Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.
Resumo:
Over the past decade privatised capital city airports in Australia have planned developed a range of non aviation commercial and retail land uses on airport land. Many surrounding municipalities consider this development in conflict with existing regional land use planning. Conversely airport operators are alarmed at continued urban consolidation and encroachment of incompatible regional development. Land use planning within and surrounding Australian capital city airports does not support compatible and integrated land use. It is currently a fragmented process due to: 1) current legislative and policy frameworks; 2) competing stakeholder priorities and interests; and 3) inadequate coordination and disjointed decision-making. This paper will examine privatised Australian airport development and consider three case studies to detail the context of airport and regional land use planning. A series of stakeholder workshops have served to inform the procedural dynamics and relationships between airport and regional decision-making. This exploratory research will assist in informing the knowledge gaps between aviation, airport development and broader urban land use policy. This paper will provide recommendations to enhance approaches to land use planning for airports and adjacent metropolitan regions in Australia and overseas.
Resumo:
This paper estimates a simultaneous-equation model of wages and prices for Australia, underpinned by a competing claims framework of imperfect competition. Two separate co-integrating relationships for wages and prices are identified by imposing the economic hypotheses implied by the theory. The steady-state relationships for wages and prices are then embedded in a parsimonious, dynamic wage-price model. The final model is both simple and parsimonious and able to describe the process of wage and price inflation in Australia
Resumo:
uring periods of market stress, electricity prices can rise dramatically. Electricity retailers cannot pass these extreme prices on to customers because of retail price regulation. Improved prediction of these price spikes therefore is important for risk management. This paper builds a time-varying-probability Markov-switching model of Queensland electricity prices, aimed particularly at forecasting price spikes. Variables capturing demand and weather patterns are used to drive the transition probabilities. Unlike traditional Markov-switching models that assume normality of the prices in each state, the model presented here uses a generalised beta distribution to allow for the skewness in the distribution of electricity prices during high-price episodes.
Resumo:
The Urban Research Program (URP) was established in 2003 as strategic research and community engagement initiative of Griffith University. The strategic foci of the Urban Research Program are research and advocacy in an urban regional context. The Urban Research Program seeks to improve understanding of, and develop innovative responses to Australia's urban challenges and opportunities by providing training assistance. The authors aim to make the results of their research and advocacy work available as freely and widely as possible.
Resumo:
The ready availability of suitably zoned and serviced land is one of the key factors in the timely and cost effective provision of new land for development. Unfortunately, in many high population growth areas, land that may be available does not have ready access to infrastructure, or the appropriate designation/s (zoning) in place. The corresponding lag in supply frequently bears the blame for the resultant disequilibrium in the market and affordability pressures on the end product. Government has the capacity to respond to the issue of land supply in a number of ways. Proactive measures define longer term goals and set the ground rules moving forwards. Reactive policy decisions are made in an often hostile environment where stakeholder interests conflict. With a trend to increased regulation, government risks further constraining the viability of land development in high growth areas, without full consideration of all the supply side variables. This preliminary paper will identify a number of the variables which may be constraining the supply of land for residential development in South East Queensland given the current regulatory environment. It will examine the interrelationship between these supply side constraints, a full understanding of which is required by government in order for its policies to stimulate, rather than restrict the supply of land in this high growth region.
Resumo:
The changing development and population sprawl in major cities, especially those located in high rainfall areas, has resulted in the need to review and re-assess potential flood impacts in these cities. In many cases these new flood lines and flood maps have placed residential property that was previously considered to be flood free to now be considered to be potentially flood liable. Previous research based in Sydney and the UK has identified the fact that residential property that has been subject to flooding has a decreased price and higher investment risk than flood free property in the same location. These studies have also shown that the greatest impact on residential property subject to flooding is just following a flood event. In June 2009, Brisbane City Council released revised flood maps for the Greater Brisbane region and these maps have identified areas that have not previously been considered flood liable. This paper will analyse the sale performance of flood liable streets in the main flood areas of Brisbane over the period January 1990 through to June 2009, to determine the variation in price for these flood liable areas to the residential property immediately adjoining them. The average sale price will be tracked on both a geographic location and socio-economic basis.
Resumo:
This is a preliminary scoping presentation. It outlines some of the very early issues identified this research topic.
Resumo:
The global impact of an ever-increasing population-base combined with dangerously depleted natural resources highlights the urgent need for changes in human lifestyles and land-use patterns. To achieve more equitable and sustainable land use, it is imperative that populations live within the carrying capacity of their natural assets in a manner more accountable to and ethically responsible for the land which sustains them. Our society’s very survival may well depend on worldwide acceptance of the carrying capacity imperative as a principle of personal, political, economic, educational and planning responsibility. This theoretically-focused research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. It also addresses existing gaps in current methodologies and suggests avenues for improvement. A set of eleven key criteria are employed to compare various existing carrying capacity assessment models. These criteria include whole-systems analysis, dynamic responses, levels of impact and risk, systemic constraints, applicability to future planning and the consideration of regional and local boundary delineation. This research finds that while some existing methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. However, it is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable systems-based model may be achievable in the future.
Resumo:
While some existing carrying capacity methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. This research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. A range of key criteria are employed to compare various existing carrying capacity assessment models. These criteria include integrated systems analysis, dynamic responses, levels of risk, systemic constraints, applicability to future planning and the consideration of regional boundary delineation. It is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable system-based model may be achievable in the future.
Resumo:
Broad, early definitions of sustainable development have caused confusion and hesitation among local authorities and planning professionals. This confusion has arisen because loosely defined principles of sustainable development have been employed when setting policies and planning projects, and when gauging the efficiencies of these policies in the light of designated sustainability goals. The question of how this theory-rhetoric-practice gap can be filled is the main focus of this chapter. It examines the triple bottom line approach–one of the sustainability accounting approaches widely employed by governmental organisations–and the applicability of this approach to sustainable urban development. The chapter introduces the ‘Integrated Land Use and Transportation Indexing Model’ that incorporates triple bottom line considerations with environmental impact assessment techniques via a geographic, information systems-based decision support system. This model helps decision-makers in selecting policy options according to their economic, environmental and social impacts. Its main purpose is to provide valuable knowledge about the spatial dimensions of sustainable development, and to provide fine detail outputs on the possible impacts of urban development proposals on sustainability levels. In order to embrace sustainable urban development policy considerations, the model is sensitive to the relationship between urban form, travel patterns and socio-economic attributes. Finally, the model is useful in picturing the holistic state of urban settings in terms of their sustainability levels, and in assessing the degree of compatibility of selected scenarios with the desired sustainable urban future.
Resumo:
The privatization of major Australian airports in the late 1990s unleashed an unprecedented development wave as corporate lessees implemented ambitious business plans. While planning and environmental regulations governing on-airport development were significantly enhanced, there has been national disquiet about a governance regime that remains under the auspices of the federal government and is not effectively integrated into state and local decision-making machinery. Tensions in major airport regions have been exacerbated by the building of highly conspicuous non-aeronautical developments approved with no determining input by local decision-makers as well as the growing pressures on off-airport locations for aviation-related development. This paper canvasses this context and overviews the evolving structure of planning controls for Australia’s privatized federal airports. A range of issues surfacing through the National Aviation Policy Review process in 2008–2009 is described.