940 resultados para Iron and steel bridges Design and construction
Resumo:
Incluye Bibliografía
Resumo:
Includes bibliography
Design and construction of a new Drosophila species, D.synthetica, by synthetic regulatory evolution
Resumo:
Here, I merge the principles of synthetic biology1,2 and regulatory evolution3-11 to create a new species12-15 with a minimal set of known elements. Using preexisting transgenes and recessive mutations of Drosophila melanogaster, a transgenic population arises with small eyes and a different venation pattern that fulfills the criteria of a new species according to Mayr's "Biological Species Concept"7,10. The genetic circuit entails the loss of a non-essential transcription factor and the introduction of cryptic enhancers. Subsequent activation of those enhancers causes hybrid lethality. The transition from "transgenic organisms" towards "synthetic species", such as Drosophila synthetica, constitutes a safety mechanism to avoid hybridization with wild type populations and preserve natural biodiversity16-18. Drosophila synthetica is the first transgenic organism that cannot hybridize with the original wild type population but remains fertile when crossed with other transgenic animals.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
The paper examines the development and restructuring of the iron and steel industry in Asian countries. Studying countries that have integrated steelworks with large blast furnaces (South Korea, Taiwan, China and India) and countries without (Thailand, Indonesia and Malaysia), the paper shows the difference in the development processes across the countries and across time, and points to the diversity of the development experience of these countries. The paper argues that significant differences in steel production technologies in terms of initial investment and minimum-efficient scale, the changing role of the state, and shifting demand structures in the domestic steel markets of each country have been the important factors that led to the differences in the development path of the steel industry in each country.
Resumo:
This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.
Resumo:
The writer would like to point out the existence of a very remarkable Spanish cable-stayed bridge built in 1925, wich is thus older than the first one recorded by the authors (and probably the pioneer in concrete-deck type). The Tempul Aqueduct was designed by the famous Professor Educardo Torroja. The deck is a concrete box girder sustained by two planes of 3 mm diam 37-wire double cables working at 27 kg/mm2.
Resumo:
Building-integrated Photovoltaics (BIPV) is one of the most promising technologies enabling buildings to generate on-site part of their electricity needs while performing architectural functionalities. A clear example of BIPV products consists of semi-transparent photovoltaic modules (STPV), designed to replace the conventional glazing solutions in building façades. Accordingly, the active building envelope is required to perform multiple requirements such as provide solar shading to avoid overheating, supply solar gains and thermal insulation to reduce heat loads and improve daylight utilization. To date, various studies into STPV systems have focused on their energy performance based on existing simulation programs, or on the modelling, normally validated by limited experimental data, of the STPV modules thermal behaviour. Taking into account that very limited experimental research has been conducted on the energy performance of STPV elements and that the characterization in real operation conditions is necessary to promote an energetically efficient integration of this technology in the building envelope, an outdoor testing facility has been designed, developed and built at the Solar Energy Institute of the Technical University of Madrid. In this work, the methodology used in the definition of the testing facility, its capability and limitations are presented and discussed.
Resumo:
The Barriga Dam (Burgos, Spain) is a unique case study because its trapezoid spillway is located on the dam body and is composed of wedge-shaped concrete blocks (WSB) that include certain relevant improvements. This note summarizes the main features of the studies, the key aspects of the final design of the WSB and their placement on the dam, and important details of the spillway design. The design team concluded the study by showing the suitability of this enhanced technology for application to small dams and ponds in the short term, even with unit flows above 5 m2/s.
Resumo:
This study has a double objective: to provide foreign colleagues with an insight into the controversy surrounding the international competitiveness of pig iron produced in Bilbao and also to present previously unpublished documentation regarding the European iron industry, which I have retrieved from the historical archive of Credit Lyonnais of Paris. This information includes the costs of Biscayan, French, British, German and Belgium pig iron broken down into five components (iron ore, coke, flux, labour and other costs), which is useful in determining the reasons why the pig iron from Bilbao became less competitive. The article is made up of three parts. Firstly, I will synthesise the controversy surrounding the competitiveness of the Basque iron and steel industry. Then I will present the itemised costs which provide information to illustrate how Biscayan pig iron was not competitive because it was produced with English coal which was more expensive than that consumed by the European factories located "on top of" or near coal seams. The article will finish with a section that, by way of conclusion, explains the comparative advantage and disadvantage of Bilbao, applying the first model of Alfred Weber's Theory of Industrial Location to three technological advances, occurring between the 1860s and 1913 (malleable iron, Bessemer steel and Thomas steel).