976 resultados para Hungry Horse Dam
Resumo:
Survey map of the land for the Mill Scibes Grand River Dam. Created by The Welland Canal Company. Included is a drawing of the land. Noteable features include; Sulphur Creek, post, bridge, Grand River, lot divisions, inside face of embankment. Surveyor notes are seen in pencil on the map.
Resumo:
Charles Bell is pictured in this black and white undated photograph with his horse and cart. Mr. Bell ran an ice and coal business on Geneva St. in St. Catharines, Ontario. This photograph was in the possession of the Rick Bell family, of St. Catharines.Handwritten inscription on the reverse reads: "Grandpa Charles Bell ran ice and coal business, Geneva St. St. Catharines"
Resumo:
Transcript (spelling and grammar retained): Chippawa [Chippewa] 28th August 1860 My Dear Sir I duly received your very kind letter of the 24th [June] asking me to communicate such facts of general interest connected with my career during the War with the United States. I have no objection to afford you such information as came under my own observation; nevertheless I do so, with the understanding, I have no desire to be my own trumpeter. With respect to your circular wherein you state you have been for several years collecting materials for a History of the late War between the United States & Great Britain, for which you are now gathering further materials to add to your collection, concerning the Second War for Independence. I am rather at a loss to know, what is meant by the second war; If you allude to the petty Rebellion, it could not be called a War, Those that caused the outbreak were very soon put down, by the Loyal people of the Province without the aid of Regular Troops being satisfied with the Independence they enjoyed. With respect to the several questions names in your circular: To the 1st I would say, this locality is made memorable by the battle of Chippawa [Chippewa] which took place about a mile above the village on the ground I pointed out to you, when I had the pleasure of seeing you a few days ago, with Mr Porter of the Niagara Falls, of which I believe you took sketches at the time. 2nd I have no historical documents of any value; so many years having gone past, the most of my old papers have either been lost or destroyed, I however came across two letters, one dated Queenston 9th July 1812 from Lt. Col. Nicholl Quarter Master General of Militia, the other from Lt. Col Myers Deputy Quarter Master General of the Regular Army date Fort George 23rd same month, directed to me in the hand writing of each of those officers as Deputy Quarter Master General of Militia, which letters I shall be obliged you would return at as early a day possible, as I wish to place them with tome others in the case, I have had made to hold the cocked hat & feather I wore during that eventful period, which I am sorry I did not exhibit when you was at my house; with reference to it I now enclose a letter from Lt. Col. Clark, residing at Port Dalhousie he was Captain & Adjutant of Militia in the War of 1812__ I send the letter in proof of the cock’d hat it is a lengthy one, but you may find time to turn over it, as I shall also place it in the hat case__ 3rd Where are [but] [for] traditionary [sic] witnesses residing in this vicinity – Col Clark above named Mr Merritt of St. Catharines, & Mr Kerby of Brantford are the only ones I now recollect, who could offord [sic] you any statistical information. 4th I have no pictorial sketches of any Military Movements or fortifications. As regards my own career, which you appear [ ? ] of knowing__ I was first a Lieutenant in a volunteer flank company stationed on the river side opposite [Navy] Island not far from the battle ground of Chippawa [Chippewa], I got promotion as Lieutenant of Cavalry before I got my Cavalry dress completed in three days more, I was called by General Brock to Fort George, was appointed Deputy Quarter Master General of Militia with the rank of Captain s the accompanying letters will show. I was at the battle of Stony Creek, several skirmishes at the Cross Roads, when the American army [ ? ] Fort George, at the taking of Col. Boerstler at the Beaver Dam, & had the honor of receiving Colonel Chapens sword at the surrender, who commanded a company of volunteer Horse Men was at the taking of 15 regulars & two officers at Fort Schlosser—was with Col. Bishop at the taking of Black Rock, near him when he fell, three men of the 8th Reg. more killed in the Boat I was in – I was at Chippawa battle, and the last, not the least in Lundy’s lane battle, which the Americans call the battle of Bridge [Waters]. I had forgot; there was another small affair at Corks Mill where I was. I could write a little history of events, but have not the time to do so. If what I have stated will be of any service for the purpose you require I shall feel happy. The history of the late War was published at Toronto in the Anglo American Magazine. Did you ever see it, I have the Books, there were however several errors which came under my notice, which I could have corrected. If my time would permit I could give you a more detailed statement of events. I trust however you may succeed with your publication , and I shall be most happy to hear from you at all times—I related many little occurances verbally to you when here, which I thought not necessary to repeat again as you would have a perfect recollection of them. Be pleased to return the letters for the purpose I require them. I am My Dear Sir Your respectful friend James Cummings
Resumo:
A photograph with the caption, "LaChasse dam looking from river to Lake LaChasse".
Resumo:
A photograph of the construction of the dam at Lake LaChasse.
Resumo:
A diagram of a horse, labelled and illustrated by Dorothy Rungeling.
Resumo:
Black and white photograph, 16 cm x 11 ½ cm, of Hamilton Killaly Woodruff with a young child [Charles Woodruff Band?]. The child is sitting on a rocking horse and Hamilton is standing watching the child with his hat in one hand and his cane in the other.
Resumo:
The description on the reverse states "The Majesty and Beauty of Niagara. The Horse Shoe Fall." There is also a No. associated with the card, but the original printed number (5800_01) has been crossed out and replaced in ink with 5795.
List of prices paid to Dilly Coleman by Doctor Richard .S. King for the board and feeding of a horse
Resumo:
List (2 pages, handwritten) of prices paid to Dilly Coleman by Doctor Richard .S. King for the board and feeding of a horse. There is a handwritten note on the inner page regarding instructions for feeding the horse, Sept. 1850.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension to W.G. Thompson regarding horse hire (copy), Jul. 30, 1857.
Resumo:
Cross sections of Lyons Creek from Cooks Mills Dam to culvert (9 pages of charts, graphs and text, handwritten). This is signed by Fred Holmes, May 1857.
Resumo:
La thrombasthénie de Glanzmann (TG) est une maladie caractérisée par un défaut d’agrégation plaquettaire. C’est une maladie génétique autosomale récessive causée par une anomalie du récepteur plaquettaire pour le fibrinogène. Ce récepteur est une intégrine localisée à la surface plasmatique qui est formée par un complexe composé des sous‐unités αIIb et β3. Nous avons identifié un cheval démontrant les caractéristiques clinicopathologiques de la TG. Des études par cytométrie de flux ont révélé une déficience au niveau de la portion αIIb du récepteur. Ces résultats suggèrent une ou plusieurs mutations au niveau du gène codant pour cette portion αIIb du récepteur. L’objectif de notre étude était de caractériser l’ADNc et l’ADN génomique codant pour les gènes ITGA2B et ITGB3 codant respectivement pour les deux sous‐unités αIIb et β3 chez un cheval atteint de la TG. L’ADNc a été synthétisé par RT‐PCR en utilisant l’ARN total récolté à partir des plaquettes. L’ADN génomique a été extrait à partir des globules blancs. Des amorces spécifiques ont été utilisées pour l’amplification par PCR d’ITGA2B et d’ITGB3. Les séquences d’ADNc et d’ADN génomique de notre patient ont été caractérisées par séquençage et comparées par l’analyse BLAST (GenBank). Une substitution d’une guanine par une cytosine a été mise en évidence au niveau de l’exon 2 d’ITGA2B amenant à la substitution d’une arginine (Arg72) par une proline (Pro72). Ce changement d’acide aminé pourrait résulter en une conformation structurelle anormale qui amènerait à une sous‐unité αIIb inactive. L’analyse de l’ADN génomique a démontré que ce cheval était homozygote pour cette mutation. Le séquençage de l’ADN génomique des parents et de la grand‐mère du patient a démontré que ces individus étaient hétérozygotes pour cette mutation. Le séquençage d’ITGB3 n’a démontré aucune anomalie.
Resumo:
This presentation was the product of an invitation to speak at a symposium for students and faculty from a variety of different non-law departments at the University of Tennessee, where in 1973 I had started what became a six-year legal campaign to divert the Tennessee Valley Authority from impounding the last flowing 33 miles of the Little Tennessee River behind TVA’s Tellico Dam.
Resumo:
This thesis Entitled Post-Environmental Evaluation of The Rajjaprabha Dam In Thailand. This post evaluation of environmental consequences of Rajjaprabha dam IS conducted ten years after its commencement. The Rajjaprabha dam project was planned and implemented as a multipurpose project, mainly for hydropower production, flood protection, fisheries, recreation and irrigation. The project includes the dam and reservoir with a 240 MW hydropower plant located about 90 km upstream from Surat Thani province, and irrigation systems covering the coastal plain in Surat Thani. The upstream storage reservoir (with about 5,639 mcm storage) and the hydropower plant had already been implemented. The first phase of irrigation system covers an area of 23,100 hectares. The second phase is envisaged to cover about 50,000 hectares. This study was conducted with the following objectives: (I) to assess all existing environmental resources and their values with the help of input-output analysis (2) to findout the beneficial impacts of the project (3) to evaluate the actual positive effects vis-a-vis the estimated effects before the project was implemented and (4) to identify all significant changes in relatives to the impacts previously assessed. The study area includes the Phum Duang river basin of about 4,668 km2 (placed on the areas that are upstream and downstream to the damsite), The duration of study is limited to 10 years after the dam has become operational i.e. from 1987-1997. The results of the study reveal that there is no significant changes in climatic and ground water resources, with respect to the study area inspte of the fact that the physical and chemical properties of the soil have slightly changed. Sedimentation in the reservoir does not have much effect on the function of the dam.