861 resultados para Grid-connected


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Hydrodynamic models are a powerful tool that can be used by a wide range of end users to assist in predicting the effects of both physical and biological processes on local environmental conditions. This paper describes the development of a tidal model for Strangford Lough, Northern Ireland, a body of water renowned for the location of the first grid-connected tidal turbine, SeaGen, as well as the UK’s third Marine Nature Reserve. Using MIKE 21 modelling software, the development, calibration and performance of the modelare described in detail. Strangford Lough has a complex flow pattern with high flows through the Narrows (~3.5 m/s) linking the main body of the Lough to the Irish Sea and intricate flow patterns around the numerous islands. With the aid of good quality tidal and current data obtained throughout the Lough during the model development, the surface elevation and current magnitude between the observed and numerical model were almost identical with model skill >0.98 and >0.84 respectively. The applicability of the model is such that it can be used as an important tool for the prediction of important ecological processes as well as engineering applications within Strangford Lough.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Over-frequency generator tripping (OFGT) is used to cut off extra generation to balance power and loads in an isolated system. In this paper the impact of OGFT as a consequence of grid-connected wind farms and under-frequency load shedding (UFLS) is analysed. The paper uses a power system model to demonstrate that wind power fluctuations can readily render OFGT and UFLS maloperation. Using combined hydro and wind generation, the paper proposes a coordinated strategy which resolves problems associated with OFGT and UFLS and preserves system stability.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a multi-agent system approach to address the difficulties encountered in traditional SCADA systems deployed in critical environments such as electrical power generation, transmission and distribution. The approach models uncertainty and combines multiple sources of uncertain information to deliver robust plan selection. We examine the approach in the context of a simplified power supply/demand scenario using a residential grid connected solar system and consider the challenges of modelling and reasoning with
uncertain sensor information in this environment. We discuss examples of plans and actions required for sensing, establish and discuss the effect of uncertainty on such systems and investigate different uncertainty theories and how they can fuse uncertain information from multiple sources for effective decision making in
such a complex system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Energias Renováveis – Conversão Eléctrica e Utilização Sustentáveis

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Seit gut zehn Jahren erlebt die Windenergienutzung in Deutschland einen in der Mitte der 80er Jahre nicht für möglich gehaltenen Aufschwung. Anlagenanzahl und installierte Leistung haben in diesem Zeitraum mit durchschnittlichen jährlichen Wachstumsraten von mehr als 30 Prozent zugenommen, die mittlere installierte Leistung pro neu errichteter Anlage stieg dabei um das Zehnfache und die technische Verfügbarkeit der Anlagen liegt mittlerweile bei über 98 Prozent. Mit größer werdenden Anlagen zeigt sich weiterhin ein klarer Trend zu Blattwinkel verstellbaren Konzepten, mit zunehmend drehzahlvariabler Betriebsweise. Vor dem von Vielen für die kommenden drei bis sechs Jahre prognostizierten Einstieg in die großtechnische Offshore- Windenergienutzung mit den damit verbundenen immensen technologischen und strukturellen Herausforderungen erscheint es sinnvoll, einen kritischen Blick zurückzuwerfen auf die 90er Jahre mit den ihnen zugrunde liegenden förderpolitischen Rahmenbedingungen. Dabei soll die Frage beantwortet werden, welchen konkreten Einfluss die staatlichen Forschungs- und Förderprogramme, besonders das "250 MW Wind"-Programm, auf die Entwicklung der Windenergienutzung hatten, das heißt, unter welchen Bedingungen sich bestimmte Techniklinien durchsetzten, wie der Einfluss eines geschützten Marktes durch gesetzlich garantierte Einspeisetarife auf diese Entwicklung zu bewerten ist und schließlich, welche Fehlentwicklungen möglicher Weise eingetreten sind. Dazu wird mit Hilfe von Lernkurven gezeigt, welche Kostenreduktionen insgesamt erzielt wurden, wie hoch die dazu notwendigen staatlichen Finanzmittel waren und welche Schlussfolgerungen daraus für die Zukunft abgeleitet werden können. Die Arbeit soll insgesamt dazu beitragen, die erreichten technischen Entwicklungsschritte vor dem Hintergrund der förderpolitischen Gegebenheiten besser zu verstehen, Chancen für gezielte Änderungen in der Förderpraxis zu ergreifen und Hinweise auf die Ausgestaltung von zukünftigen Forschungsprogrammen und Entwicklungsschwerpunkten im Bereich der Windenergie zu geben, um weitere Kostensenkungspotenziale auszuschöpfen. Dabei wird sich die zukünftige Schwerpunktsetzung in der programmatischen Ausrichtung der Forschung stärker auf die drei wichtigsten Anwendungsfelder für Windenergieanlagen konzentrieren müssen, die großtechnische Offshore- Anwendung, die netzgebundene, dezentrale Energieversorgung sowie auf Windenergieanlagen zur ländlichen Elektrifizierung in autonomen Versorgungssystemen für Schwellen- und Entwicklungsländer.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A test and demonstration facility for PV and PV hybrid systems and system components has been designed and installed at Dalarna University in Sweden. The facility allows studies of complete PV systems or single components in a range of 0.1-10 kW. The facility includes two grid-connected PV systems, a PV Hybrid off-grid system, three emulators and the necessary measurement and control equipment. Tests can be done manually or automatically through programmed test procedures controlled that will be implemented in Labview. The facility shall be used by researchers, professionals of the industry and engineering students.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A common problem when planning large free field PV-plants is optimizing the ground occupation ratio while maintaining low shading losses. Due to the complexity of this task, several PV-plants have been built using various configurations. In order to compare the shading losses of different PV technologies and array designs, empirical performance data of five free field PV-plants operating in Germany was analyzed. The data collected comprised 140 winter days from October 2011 until March 2012. The relative shading losses were estimated by comparing the energy output of selected arrays in the front rows (shading-free) against that of shaded arrays in the back rows of the same plant. The results showed that landscape mounting with mc-Si PV-modules yielded significantly better results than portrait one. With CIGS modules, making cross-table strings using the lower modules was not beneficial as expected and had more losses than a one-string-per-table layout. Parallel substrings with CdTe showed relatively low losses. Among the two CdTe products analyzed, none showed a significantly better performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this thesis the solar part of a large grid-connected photovoltaic system design has been done. The main purpose was to size and optimize the system and to present figures helping to evaluate the prospective project rationality, which can potentially be constructed on a contaminated area in Falun. The methodology consisted in PV market study and component selection, site analysis and defining suitable area for solar installation; and system configuration optimization based on PVsyst simulations and Levelized Cost of Energy calculations. The procedure was mainly divided on two parts, preliminary and detailed sizing. In the first part the objective was complex, which included the investigation of the most profitable component combination and system optimization due to tilt and row distance. It was done by simulating systems with different components and orientations, which were sized for the same 100kW inverter in order to make a fair comparison. For each simulated result a simplified LCOE calculation procedure was applied. The main results of this part show that with the price of 0.43 €/Wp thin-film modules were the most cost effective solution for the case with a great advantage over crystalline type in terms of financial attractiveness. From the results of the preliminary study it was possible to select the optimal system configuration, which was used in the detailed sizing as a starting point. In this part the PVsyst simulations were run, which included full scale system design considering near shadings created by factory buildings. Additionally, more complex procedure of LCOE calculation has been used here considered insurances, maintenance, time value of money and possible cost reduction due to the system size. Two system options were proposed in final results; both cover the same area of 66000 m2. The first one represents an ordinary South faced design with 1.1 MW nominal power, which was optimized for the highest performance. According to PVsyst simulations, this system should produce 1108 MWh/year with the initial investment of 835,000 € and 0.056 €/kWh LCOE. The second option has an alternative East-West orientation, which allows to cover 80% of occupied ground and consequently have 6.6 MW PV nominal power. The system produces 5388 MWh/year costs about 4500,000 € and delivers electricity with the same price of 0.056 €/kWh. Even though the EW solution has 20% lower specific energy production, it benefits mainly from lower relative costs for inverters, mounting and annual maintenance expenses. After analyzing the performance results, among the two alternatives none of the systems showed a clear superiority so there was no optimal system proposed. Both, South and East-West solutions have own advantages and disadvantages in terms of energy production profile, configuration, installation and maintenance. Furthermore, the uncertainty due to cost figures assumptions restricted the results veracity.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This thesis focuses on using photovoltaic produced electricity to power air conditioners in a tropical climate. The study takes place in Surabaya, Indonesia at two different locations the classroom, located at the UBAYA campus and the home office, 10 km away. Indonesia has an average solar irradiation of about 4.8 kWh/m²/day (PWC Indonesia, 2013) which is for ideal conditions for these tests. At the home office, tests were conducted on different photovoltaic systems. A series of measuring devices recorded the performance of the 800 W PV system and the consumption of the 1.35 kW air conditioner (cooling capacity). To have an off grid system many of the components need to be oversized. The inverter has to be oversized to meet the startup load of the air conditioner, which can be 3 to 8 times the operating power (Rozenblat, 2013). High energy consumption of the air conditioner would require a large battery storage to provide one day of autonomy. The PV systems output must at least match the consumption of the air conditioner. A grid connect system provides a much better solution with the 800 W PV system providing 80 % of the 3.5 kWh load of the air conditioner, the other 20 % coming from the grid during periods of low irradiation. In this system the startup load is provided by the grid so the inverter does not need to be oversized. With the grid-connected system, the PV panel’s production does not need to match the consumption of the air conditioner, although a smaller PV array will mean a smaller percentage of the load will be covered by PV. Using the results from the home office tests and results from measurements made in the classroom. Two different PV systems (8 kW and 12 kW) were simulated to power both the current air conditioners (COP 2.78) and new air conditioners (COP 4.0). The payback period of the systems can vary greatly depending on if a feed in tariff is awarded or not. If the feed in tariff is awarded the best system is the 12 kW system, with a payback period of 4.3 years and a levelized cost of energy at -3,334 IDR/kWh. If the feed in tariff is not granted then the 8 kW system is the best choice with a lower payback period and lower levelized cost of energy than the 12 kW system under the same conditions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work presents the stage integration in power electronics converters as a suitable solution for solar photovoltaic inverters. The rated voltages available in Photovoltaic (PV) modules have usually low values for applications such as regulated output voltages in stand-alone or grid-connected configurations. In these cases, a boost stage or a transformer will be necessary. Transformers have low efficiencies, heavy weights and have been used only when galvanic isolation is mandatory. Furthermore, high-frequency transformers increase the converter complexity. Therefore, the most usual topologies use a boost stage and one inverter stage cascaded. However, the complexity, size, weight, cost and lifetime might be improved considering the integration of both stages. These are the expected features to turn attractive this kind of integrated structures. Therefore, some integrated converters are analyzed and compared in this paper in order to support future evaluations and trends for low power single-phase inverters for PV systems. © 2011 IEEE.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a three-phase integrated inverter suitable for stand-alone and grid-connected applications. Furthermore, the utilization of the special features of the tri-state coupled with the new space vector modulation allows the converter to present an attractive degree of freedom for the designing of the controllers. Additionally, the control is derived through dq0 transformation, all the system is described and interesting simulation results are available to confirm the proposal. © 2012 IEEE.