183 resultados para Geomechanics


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The large ancient underground rock caverns in Longyou is an important component of grotto cultural. Current task facing the long-term preservation of these unmovable cultural relics is arduous and challenging. The deformation failure of the caverns' surrounding rock is deteriorating. The weathering velocity of these caverns is accelerating. With the strength of caverns' surrounding rock worsening, critical rocks were generated in local regions of the caverns' vault and posing a threat to the security of people passing by. Selection of a maximum-security route and construction a aisle in the caverns might be an efficient way to ensure the security of tourists and reach the target of long-term preservation. The deformation and destruction of the ancient underground caverns is primarily dominated by geological conditions and the special structure of caverns. Based on field investigation, several fundamental conditions for deformation and failure are recognized, and nine deformation and fracture patterns of the Longyou grotto are proposed. In order to judge the stability of caverns’ surrounding rock, the element safety coefficient method is presented. An explicit explanation for the meaning of the method is deduced using Mohr-Coulomb strength criterion. Numerical analyses are carried out in the dissertation through FLAC3D code. Through numerical analysis, the stress distribution regularities of the caverns’ roofs, piles and public side wall are analysed, and the stability properties of caverns’ surrounding rock are also assessed. At the same time, the element safety coefficient method is introduced to contrast the stability degree of different regions in caverns. The above analyses are bases for choosing the optimal tourism routes in the caverns of Longyou grotto. The impact of surface load on the stability of shallow buried cavities in Longyou grotto is evaluated, the results show that building load has significant influence on the stability of the No.1 cavern’s roof, pile and public side wall between the No.1 cavern and the No.2 cavern, pedestrian load has less impact on the stability of surrounding rock than building load. The principles for choosing the optimal tourism routes in the caverns are discussed. With these principles, the dissertation makes a systematic research on the geological analytic method, numerical analytic method and meeting tourism requirements method, which are used in selecting the optimal tourism routes in the caverns. In order to achieve the best effect in the process of tourism routes selection, the above three method are integrated through Theory of Engineering Geomechanics Meta-system(EGMS). According to field investigations, numerical analyses, tourism requirements and expert experiences, the optimal tourism routes through No.1 to No.5 cavern are determined preliminarily. The obtained results from the research work are useful for the security aisle's construction, they also have reference value to other projects in practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, the complex faulted-block oil reservoir of Xinzhen area in Dongying depression is systematically studied from basic conditions forming faulted-block oil and gas reservoir integrating geology, seismic, logging and reservoir engineering information and computer; guided by petroleum geology, geomechanics, structural geology and geophysics and other theories. Based on analysis of background condition such as regional strata, structure and petroleum geology, structural research on geometry, kinemaitcs and dynamics, oil-controlling fault research on the seal features, sealing mechanism and sealing pattern, and research on enrichment rules and controlling factors of complex faulted-block oil reservoir are carried out to give out the formation mechanics of oil reservoir of Xinzhen complex faulted-block oil reservoir. As a result, the reservoir formation pattern is established. At the same time, through dissecting the characteristics and hydrocarbon enrichment law of complex faulted-block oil reservoir, and studying its distribution law of remaining oil after entering extra high water-cut period, a set of technologies are formed to predict complex faulted-block oil reservoir and its remaining oil distribution and to enhance oil recovery (EOR). Based on the time relationship between migration of hydrocarbon and trap formation, accumulating period of Xinzhen oil reservoir is determined. The formation of Xinzhen anticlinal trap was prior to the primary migration. This is favorable to formation of Xinzhen anticlinal hydrocarbon reservoir. Meanwhile, because anticline top caving isn't at the sane time as that of moving or faulted-trap forming inner anticline, oil and gas migrated many times and Xinzhen complex faulted-block oil reservoir formed from ES_3~(upper) to EG. Accumulating law and controlling factors of complex faulted-block reservoir are analyzed from many aspects such as regional structure background controlling hydrocarbon accumulating, plastic arch-open structure controlling oil-bearing series and reservoir types, sealing-opening of fault controlling hydrocarbon distribution and structure pattern controlling enriched trap types. Also, we established the structure pattern in Xinzhen a'ea: the arch-open of underlying strata cause expanding fracture. The main block groups developed here are shovel-like normal fault block group in the north area of Xinzhen and its associated graben block group. Block groups dominate the formation and distribution of reservoirs. We studied qualitatively and quantitatively the sealing characteristics, sealing history and sealing mechanism of faults, too. And, the sealing characteristics are evaluated and the distribution pattern of hydrocarbon controlled by faults is researched. Due to movement intensity of big faults, deep falling of downthrown block, high degree of repture and development of fracture, shallow layers close to the downthrown block of secondary faults are unfavorable to hydrocarbon accumulation. This is confirmed by the exploration practice in Xinzhen anticline. In terms of the downthrown blocks of sencondary contemporaneous faults lied in the south and north area of Xinzhen, hydrocarbon is poor close to fracture belt, while it is relatively abundant in tertiary companion faults. Because of long-term movement of faults that control hydrocarbon, fi'om ES3 to EG, six set of oil-bearing series formed. And their opening causes the inhomogeneity in hydrocarbon abundance among each block--in two flanks of anticline reservoirs are abundant while in the axial area, oil and gas are sporadic. There the sealing characteristics control oil-bearing area of oil/gas accumulation and the height of oil reservoir. Longitudinally, oil and gas are enriched in dip-flat areas in mid-plane of faults. It is established that there are four types of accumulating patterns in complex faulted-block oil reservoirs in Xinzhen. The first is accumulating pattern of lithologic oil reservoirs in E~S_3~(mid-lowwer), that is, self-generating-self-reserving-self-covering lithologic trap pattern. The second is drag-anticline accumulating pattern in Xinzhen. The structure traps are drag anticlines formed by the contemporaneous faults of the second basement in the north of Xinzhen, and the multiple source rocks involve Ek_2, Es_4, Es_3 and Es_1 members. The reservoirs are fluvial-delta sandstones of the upper member of Shahejie formation and Guantao formation, covered by regional thick mudstone of the upper member of Guantao formation and MingHuazhen formation. The third is the accumulating pattern of reverse listric fault, the third-degree fault of Xinzhen anticline limb and the reservoirs form reservoir screened by reverse listric faults. The forth is accumulating pattern of crossing faults which form closing or semi-closing faulted-blocks that accumulate hydrocarbon. The technologies of predicting remaining oil in complex faulted-block reservoir during the mid and late development stage is formed. Remaining oil in simple large faulted-blocks enriches in structural high, structural middle, structural low of thick bottom water reservoirs, points near bent edge-fault oftertiary faults and part the fourth ones with big falling displacement, microstructure high place of oil-sandbodies and areas where local well pattern isn't perfect. While that in small complex faulted-blocks enriches near small nose, small high point, angle of small faults, small oil-bearing faulted-blocks without well and areas with non-perfect well pattern. The technologies of enhancing recovery factor in complex faulted-block reservoir during the mid and late development stage is formed as follows: fine reservoir description, drilling adjust wells, designing directional wells, sub-dividing layer series of development, improving flooding pattern, changing water-injection direction and enhancing swept volume, cyclic waterflooding and gas-injection, etc. Here, directional wells include directional deflecting wells, lateral-drilling wells, lateral-drilling horizontal wells and horizontal wells. The results of this paper have been used in exploration and development of Shengli oilfield, and have achieved great social and economic profit, especially in predicting distribution of complex faulted-block reservoir, remaining oil distribution during middle and late stage of development, and in EOR. Applying the achievement of fault-closure research, new hydrocarbon-bearing blocks are discovered in flanks of Dongying central uplift and in complex blocks with proved reserves 15 million tons. With the study of remaining oil distribution law in complex faulted-block reservoirs, recovery factors are increased greatly in Dongxin, Xianhe and Linpan complex faulted-block reservoirs and accumulated oil production increment is 3 million tons.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Synthetic Geology Information System(SGIS) is a part of the theory of Engineering Geomechanics-mate-Synthetics(EGMS), is also a development of its technical methodology. SGIS includes ways of geology engineering investigation, design, and construction. Although SGIS has an integrate theory frame, and some parts of it have gained great progress, the completion of SGIS is a continuous and accumulative process. This paper analyses the ways and principle of building knowledge database and model database, summarizes the experts' experience on exploration methods selection and the characters of exploration models, combining with the application of Decision Support System(DSS) in Decision support of Synthetic Exploration Methods for Railway engineering Geology. By the analysis of hierarchy structure of the model database, the effects of geology engineering factors on the selection of exploration methods are expressed. By the usage of fuzzy patterns recognize, hierarchy structure analysis, fuzzy collection closement analysis etc, the software of DSS for engineering design and construction are developed. At same time, by the development of Monitoring Data Analysis System and experiment data management system of Hydro-power project, this paper discussed the data management of science experiment of Hydro-power project by the usage of synthetic database and the usage of Geography Information System(GIS) and DSS technics. The technic of visual operation of data process and project monitoring system are presented. The intelligence algorithm of self-adoption is carried out to improve the data process and analysis of monitoring. Items of the project theoretical analysis and data process are designed in detail. All the theory and technical methods presented in this paper are one part of SGIS, in which the application of DSS and GIS, is an important step of the progress and completion of SGIS.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Synthetic Geology Information System (SGIS) is an important constituent part of the theory of Engineering Geomechanics Mate-Synthetic (EGMS), and is the information system more suited for the collection, storage, management, analysis and processing to the information coming from engineering geology,' geological engineering and geotechnical engineering. Its contents involve various works and methods of the investigation, design, and construction in different stages of the geological engineering. Engineering geological and three-dimensional modeling and visualization is the fundamental part of the SGIS, and is a theory, method and technique by which, adopting the computer graphics and image processing techniques, the data derived from engineering geological survey and the calculated results obtained from the geomechanical numerical simulation and analysis are converted to the graphics and images displayed on the computer screen and can be processed interactively. In this paper, the significance and realizing approaches of the three-dimensional modeling and visualization for the complex geological mass in the engineering geology are discussed and the methods of taking advantage of the interpolation and fitting for the scattered and field-surveyed data to simulate the geological layers, such as the topography and earth surface, the groundwater table and the stratum boundary, are researched into. At the mean time, in mind the characteristics of the structure of the basic data for three-dimensional modeling, its visual management can be resolved into the engineering surveyed database management module, plot parameter management module and data output module and the requirement for basic data management can be fulfilled. In the paper, the establishment and development of the three-dimensional geological information system are probed tentatively, and an instance of three-dimensional visual Engineering Distribution Information System (EDIS), theConstruction Management Information System for an airport, in which the functions, such as the real-time browse among the three-dimensional virtual-reality landscapes of the airport construction from start to finish, the information query to the airport facility and the building in the housing district and the recording and playback of the animation sets for the browse and the takeoff and landing of the planes, is developed by applying the component-mode three-dimensional virtual-reality geological information system (GIS) software development kits (SDK), so the three-dimensional visual management platform is provided for the airport construction. Moreover, in the gaper, integrated with the three-dimensional topography visualization and its application in the Sichuan-Tibet Highways, the method of the digital elevation model (DEM) data collection from the topographic maps is described, and the three-dimensional visualization and the roaming about the terrain along the highway are achieved through computer language programming. Understanding to the important role played by the varied and unique topographical condition in the gestation and germination of the highly-dense, frequently-arising and severely-endangered geological hazards can be deepened.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the engineering reinforcement of-rock and soil mass, engineers must consider how to obtain better reinforcing effect at the cost of less reinforcing expense, which, in fact, is the aim of reinforcement design. In order to accomplish the purpose, they require not only researching the material used to reinforce and its structure, but also taking into account of several important geological factors, such as the structure and property of rock and soil mass. How to improve the reinforcing effect according to engineering geomechanical principle at the respect of the reinforcement of engineering soil and rock mass is studied and discussed in this paper. The author studies the theory, technology and practice of geotechnical reinforcement based on engineering geomechanics, taking example for the soil treatment of Zhengzhou Airport, the effect analysis of reinforcement to the slope on the left bank of Wuqiangxi Hydropower Station and the reinforcing design of the No. 102 Landslide and unique sand-slide slope on the Sichuan-Tibet Highway. The paper is comprised of two parts for the convenience of discussion. In the first part, from the first chapter to the fifth chapter, trying to perform the relevant research and application at the viewpoint of soil mass engineering geomechanics, the author mainly discusses the study of reinforcing soft ground soil through dynamical consolidation and its application. Then, in the second part, from the sixth chapter to the eleventh chapter, the study of new technologies in the rock slope reinforcement and their application are discussed. The author finds that not only better reinforcing effect can be gained in the research where the principle and method of rock mass engineering geomechanics is adopted, but also new reinforcing technologies can be put forward. Zhengzhou Airport is an important one in central plains. It lies on Yellow River alluvial deposit and the structure of stratum is complex and heterogeneous. The area of airport is very large, which can result in differential settlement easily, damage of airport and aircraft accident, whereas, there are no similar experiences to dispose the foundation, so the foundation treatment become a principal problem. During the process of treatment, the method of dynamic compaction was adopted after compared with other methods using the theory of synthetic integration. Dynamic compaction is an important method to consolidate foundation, which was successfully used in the foundation of Zhengzhou Airport. For fill foundation, controlling the thickness of fill so as to make the foundation treatment can reach the design demand and optimum thickness of the fill is a difficult problem. Considering this problem, the author proposed a calculation method to evaluate the thickness of fill. The method can consider not only the self-settlement of fill but also the settlement of the ground surface under applied load so as to ensure the settlement occurred during the using period can satisfy the design demand. It is proved that the method is correct after using it to choose reasonable energy of dynamic compaction to treat foundation. At the same time, in order to examine the effect of dynamic compaction, many monitor methods were adopted in the test such as static loading test, modulus of resilience test, deep pore pressure -test, static cone penetration test and the variation of the pore volume measurement. Through the tests, the author summarized the discipline of the accumulation and dissipation of pore pressure in Yellow River alluvial deposit under the action of dynamic compaction, gave a correct division of the property change of silt and clay under dynamic compaction, determined the bearing capacity of foundation after treatment and weighted the reinforcing effect of dynamic consolidation from the variation of the soil particle in microcosmic and the parameter of soil mass' density. It can be considered that the compactness of soil is in proportion to the energy of dynamic compaction. This conclusion provided a reference to the research of the "Problem of Soil Structure-the Central Problem of Soil Mechanics in 21 Century ". It is also important to strengthen rock mass for water conservancy and electric power engineering. Slip-resistance pile and anchoring adit full of reinforced concrete are usually adopted in engineering experience to strengthen rock mass and very important for engineering. But there also some deficiency such as the weakest section can't be highlighted, the monitor is inconvenient and the diameter of pile and adit is very large etc. The author and his supervisor professor Yangzhifa invented prestressed slip-resistance pile and prestressed anchoring adit full of reinforced concrete, utilizing the advantage that the prestressed structure has better anti-tensile characteristic (this invention is to be published). These inventions overcome the disadvantages of general slip-resistance pile and anchoring adit full of reinforced concrete and have the functions of engineering prospecting, strengthening, drainage and monitor simultaneous, so they have better strengthened effect and be more convenient for monitor and more economical than traditional methods. Drainage is an important factor in treatments of rock mass and slop. In view of the traditional drainage method that drainage pore often be clogged so as to resulted in incident, professor Yangzhifa invented the method and setting of guide penetration by fiber bundle. It would take good effect to use it in prestressed slip-resistance pile and anchoring adit full of reinforced concrete. In this paper, the author took example for anchoring adit full of reinforced concrete used to strengthen Wuqiangxi left bank to simulate the strengthened effect after consolidated by prestressed slip-resistance pile, took example for 102 landslide occurred along Sichuan-Tibet highway to simulate the application of slip-resistance pile and the new technology of drainage. At the same time the author proposed the treatment method of flowing sand in Sichuan-Tibet highway, which will benefit the study on strengthening similar engineering. There are five novelties in the paper with the author's theoretical study and engineering practice: 1. Summarizing the role of pore water pressure accumulation and dissipation of the Yellow River alluvial and diluvial soil under the action of dynamical consolidation, which has instructive significance in the engineering construction under the analogical engineering geological conditions in the future. It has not been researched by the predecessors. 2. Putting forward the concept of density D in microcosmic based on the microcosmical structure study of the soil sample. Adopting D to weight the reinforcing effect of dynamic consolidation is considered to be appropriate by the means of comparing the D values of Zhengzhou Airport's ground soil before with after dynamically consolidating reinforcement, so a more convenient balancing method can be provided for engineering practice. 3. According to the deep research into the soil mass engineering geology, engineering rock and soil science, soil mechanics, as well as considerable field experiments, improving the consolidating method in airport construction, from the conventional method, which is dynamically compactmg original ground surface firstly, then filling soil and dynamically layer-consolidating or layer-compacting at last to the upgraded method, which is performing dynamical consolidation after filling soil to place totally at the extent of the certain earth-filling depth. The result of the dynamical consolidation not only complies with the specifications, but also reduces the soil treatment investment by 10 million RMB. 4. Proposing the method for calculating the height of the filled soil by the means of estimating the potential displacement produced in the original ground surface and the filled earth soil under the possible load, selecting the appropriate dynamically-compacting power and determining the virtual height of the filled earth soil. The method is proved to be effective and scientific. 5. According to the thought of Engineering Geomechanics Metal-Synthetic Methodology (EGMS), patenting two inventions (to the stage of roclamation, with Professor Yang Zhi-fa, the cooperative tutor, and etc.) in which multi-functions, engineering geological investigation, reinforcement, drainage and strength remedy, are integrated all over in one body at the viewpoint of the breakage mechanism of the rock slope.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As one part of national road No. 318, Sichuan-Tibet (Chengdu-Lasha) Highway is one of traffic life lines connecting Tibet municipality to the inland, which is very important to the economic development of Tibet. In addition, it is still an important national defence routeway, with extremely important strategic position on maintaining the stability and solidarity of Tibet municipality and consolidating national defence. Particular geological condition, terrain and landform condition and hydrometeorological condition induce large-scale debris flows and landslides (including landslips) and the like geological hazards frequently occur along the highway. High frequency geological hazards not only result in high casualties and a great property loss, but also block traffic at every turn, obstructing the Sichuan-Tibet highway seriously. On the basis of considerable engineering geological investigation and analysis to the relative studying achievements of predecessors, it is found that one of the dominating reason incurring landslides or debris flows again and again in a place is that abundant loose materials are accumulated in valleys and slopes along the highway. Taking landslides' and debris flows along Ranwu-Lulang section of Sichuan-Tibet highway as studying objects, the sources and cause of formation of loose accumulation materials in the studying area are analyzed in detail, the major hazard-inducing conditions, hazard, dynamic risk, prediction of susceptibility degree of landslides and debris flows, and the relations between landslides and debris flows and various hazard-inducing conditions are systematically researched in this paper. All of these will provide scientific foundation for the future highway renovating and reducing and preventing geological hazards. For the purpose of quantitatively analyzing landslide and debris flow hazards, the conception of entropy and information entropy are extended, the conception of geological hazard entropy is brought forward, and relevant mathematics model is built. Additionally, a new approach for the dynamic risk analysis of landslide and debris flow is put forward based on the dynamic characteristics of the hazard of hazard-inducings and the vulnerability of hazard-bearings. The formation of landslide and debris flow is a non-linear process, which is synthetically affected by various factors, and whose formation mechanics is extremely complex. Aiming at this question, a muli-factors classifying and overlapping technique is brought forward on the basis of engineering geomechanics meta-synthesis (EGMS) thought and approach, and relevant mathematics model is also built to predict the susceptibility degree of landslide or debris flow. The example analysis result proves the validity of this thought and approach. To studying the problem that whether the formation and space distribution of landslides and debris flows are controlled by one or several hazard-inducing conditions, the theme graphics of landslides and debris flows hazard and various hazard-inducing conditions are overlapped to determine the relationship between hazard and hazard-inducing conditions. On this basis, the semi-quantitative engineering zonation of the studying area is carried out. In addition, the overlapping analysis method of the hazard-indue ing conditions of landslides and debris flows based on "digital graphics system" is advanced to orderly organize and effectively manage the spatial and attributive data of hazard and hazard-inducing conditions theme graphics, and to realize the effectively combination of graphics, images and figures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Guangxi Longtan Hydropower Station is not only a representative project of West Developing and Power Transmission from West to East in China, but also the second Hydropower Station to Three Gorges Project which is under construction in China. There are 770 X 104m3 creeping rock mass on the left bank slope in upper reaches, in which laid 9 water inlet tunnels and some underground plant buildings. Since the 435m high excavated slope threatens the security of the Dam, its deformation and stability is of great importance to the power station.Based on the Autodesk Map2004, Longtan Hydropower Station Monitoring Information System on Left Bank has been basically finished on the whole. Integrating the hydropower station monitoring information into Geographic Information System(GIS) environment, managers and engineers can dynamically gain the deformation information of the slop by query the symbols. By this means, designers can improve the correctness of analysis, and make a strategic and proper decision. Since the system is beneficial to effectively manage the monitoring-data, equitably save the cost of design and safe construction, and decrease the workload of the engineers, it is a successful application to the combination of hydropower station monitoring information management and computer information system technology.At the same time, on the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of A-zone on left bank slope are carried on. It shows that the main intrinsic factor that effects the deformation of Zone A is the argillite limestone interbedding toppling structure, and its main external factors are rain and slope excavation. What's more, Degree of Reinforcement Demand(DRD) has been used to evaluate the slop reinforce effect of Zone A on left bank according to the Engineering Geomechanics-mate-Synthetics(EGMS). The result shows that the slop has been effective reinforced, and it is more stable after reinforce.At last, on the basis of contrasting with several forecast models, a synthetic forecast GRAV model has been presented and used to forecast the deformation of zone A on left bank in generating electricity period. The result indicates that GRAV model has good forecast precision, strong stability, and practical valuable reliability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In practice, piles are most often modelled as "Beams on Non-Linear Winkler Foundation" (also known as “p-y spring” approach) where the soil is idealised as p-y springs. These p-y springs are obtained through semi-empirical approach using element test results of the soil. For liquefied soil, a reduction factor (often termed as p-multiplier approach) is applied on a standard p-y curve for the non-liquefied condition to obtain the p-y curve liquefied soil condition. This paper presents a methodology to obtain p-y curves for liquefied soil based on element testing of liquefied soil considering physically plausible mechanisms. Validation of the proposed p-y curves is carried out through the back analysis of physical model tests.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

© 2015 Elsevier Ltd. All rights reserved.Laboratory tests on microscale are reported in which millimeter-sized amorphous silica cubes were kept highly compressed in a liquid environment of de-ionized water solutions with different silica ion concentrations for up to four weeks. Such an arrangement simulates an early evolution of bonds between two sand grains stressed in situ. In-house designed Grain Indenter-Puller apparatus allowed measuring strength of such contacts after 3-4 weeks. Observations reported for the first time confirm a long-existing hypothesis that a stressed contact with microcracks generates silica polymers, forming a bonding structure between the grains on a timescale in the order of a few weeks. Such structure exhibits intergranular tensile force at failure of 1-1.5 mN when aged in solutions containing silica ion concentrations of 200-to 500-ppm. The magnitude of such intergranular force is 2-3 times greater than that of water capillary force between the same grains.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents the finite element (FE) analysis of the consolidation of the foundation of an embankment constructed over soft clay deposit which shows significant time dependent behaviour and was improved with prefabricated vertical drains. To assess the capability of a simple elastic viscoplastic (EVP) model to predict the long term performance of a geotechnical structure constructed on soft soils, a well documented (Leneghans) embankment was analyzed to predict its long term behaviour characteristics. Two fully coupled two dimensional (2D) plane strain FE analyses have been carried out. In one of these, the foundation of the embankment was modelled with a relatively simpler time dependent EVP model and in the other one, for comparison purposes, the foundation soil was modelled with elasto-plastic Modified Cam-clay (MCC) model. Details of the analyses and the results are discussed in comparison with the field performance. Predictions from the creep (EVP) model were found to be better than those from Elasto-plastic (MCC) analysis. However, the creep analysis requires an additional parameter and additional computational time and resources. © 2011 Taylor & Francis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Different classes of constitutive models have been proposed to capture the time-dependent behaviour of soft soil (creep, stress relaxation, rate dependency). This paper critically reviews many of the models developed based on understanding of the time dependent stress-strain-stress rate-strain rate behaviour of soils and viscoplasticity in terms of their strengths and weaknesses. Some discussion is also made on the numerical implementation aspects of these models. Typical findings from numerical analyses of geotechnical structures constructed on soft soils are also discussed. The general elastic viscoplastic (EVP) models can roughly be divided into two categories: models based on the concept of overstress and models based on non-stationary flow surface theory. Although general in structure, both categories have their own strengths and shortcomings. This review indicates that EVP analysis is yet to be vastly used by the geotechnical engineers, apparently due to the mathematical complication involved in the formulation of the constitutive models, unconvincing benefit in terms of the accuracy of performance prediction, requirement of additional soil parameter(s), difficulties in determining them, and the necessity of excessive computing resources and time. © 2013 Taylor & Francis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A number of constitutive models that account for creep or secondary compression and rate dependent behaviour of soil have been reviewed in terms of their strengths and weaknesses. Some results of numerical analysis of some embankments have been discussed and an effort has been made to find out their strengths and limitations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The UK’s transport infrastructure is one of the most heavily used in the world. The performance of these networks is critically dependent on the performance of cutting and embankment slopes which make up £20B of the £60B asset value of major highway infrastructure alone. The rail network in particular is also one of the oldest in the world: many of these slopes are suffering high incidents of instability (increasing with time). This paper describes the development of a fundamental understanding of earthwork material and system behaviour, through the systematic integration of research across a range of spatial and temporal scales. Spatially these range from microscopic studies of soil fabric, through elemental materials behaviour to whole slope modelling and monitoring and scaling up to transport networks. Temporally, historical and current weather event sequences are being used to understand and model soil deterioration processes, and climate change scenarios to examine their potential effects on slope performance in futures up to and including the 2080s. The outputs of this research are being mapped onto the different spatial and temporal scales of infrastructure slope asset management to inform the design of new slopes through to changing the way in which investment is made into aging assets. The aim ultimately is to help create a more reliable, cost effective, safer and more resilient transport system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A perfuração é uma das operações envolvidas no desmonte de rocha com explosivos. A forma como esta operação é executada é determinante para o sucesso do desmonte. Quando é realizada correctamente o desmonte produz superfícies limpas com o mínimo de sobrescavação e perturbação. A selecção das ferramentas de perfuração é um dos factores preponderantes para os custos do desmonte de maciços rochosos. O objectivo deste trabalho é demonstrar a interdependência entre os parâmetros petrofísicos, geotécnicos e geomecânicos do maciço rochoso e as tecnologias de perfuração de forma a optimizar tanto técnica como economicamente. A forma como a perfuração é executada é determinante para a boa fragmentação do maciço rochoso. Este estudo irá centrar-se na perfurabilidade do maciço, linearidade dos furos, rendimento e desgaste das ferramentas de perfuração e desenvolvimento de metodologias do ciclo de perfuração. Neste trabalho, discute-se a importância de uma abordagem integrativa para fins de geoengenhara mineira em que foi aplicada a técnica de amostragem linear em superfícies expostas do maciço num ambiente de uma exploração granítica. As áreas seleccionadas para este estudo — Pedreira de Serdedelo (Ribeira, Ponte de Lima) e pedreira do Fojo (Ferreira, Paredes de Coura), NW de Portugal — estão situadas nas proximidades de falhas geológicas regionais. Em todo os casos de estudo foram desenvolvidos numa plataforma SIG usando as seguintes ferramentas: cartografia geo-aplicada, técnicas de geologia estrutural, da geotecnia e da geomecânica mineiras e avaliação de geotecnologias. Esta abordagem leva-nos a compreender a relevância da heterogeneidade do maciço rochoso para o dimensionamento da exploração a diferentes escalas. O controlo geomecânico do desmonte do maciço rochoso através de uma perfuração alinhada é salientado com o intuito de uma abordagem de geoengenharia integrada nos maciços rochosos.