936 resultados para Geographic information system - SPRING
Resumo:
Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2010
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s (DAS) Human Resource Information System (HRIS), Payroll, Integrated Information for Iowa (I/3) and E-Payment Engine Systems for the periods April 13, 2009 through May 15, 2009 and April 5, 2010 through May 7, 2010
Resumo:
Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2011
Resumo:
Gross-to-Net is a payroll calculator modeled after the actual payroll calculation program used for state employees’ pay warrants. This calculator can be used to project changes in deduction amounts and net pay when there are changes in pay amounts, hours worked, mandatory and voluntary deductions, including all pre-tax deductions such as retirement, insurances, deferred compensation or flexible spending plans. Federal and state tax withholding, retirement rates, OASDI and Medicare (FICA), and insurance deductions are calculated using current rates on HRIS Production.
Resumo:
Report on a review of selected application controls over the Iowa State University of Science and Technology Facilities Planning and Management - Facilities Administrative Management Information System for the period of April 18, 2011 through May 16, 2011
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Human Services’ Medicaid Management Information System for the period April 4, 2011 through April 29, 2011
Resumo:
Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s Human Resource Information System (HRIS), Payroll System and Integrated Information for Iowa System (I/3) for the period March 26, 2012 through April 27, 2012
Resumo:
This report is on state-of-the-art research efforts specific to infrastructure inventory/data collection with sign inventory as a case study. The development of an agency-wide sign inventory is based on feature inventory and location information. Specific to location, a quick and simple location acquisition tool is critical to tying assets to an accurate location-referencing system. This research effort provides a contrast between legacy referencing systems (route and milepost) and global positioning system- (GPS-) based techniques (latitude and longitude) integrated into a geographic information system (GIS) database. A summary comparison of field accuracies using a variety of consumer grade devices is also provided. This research, and the data collection tools developed, are critical in supporting the Iowa Department of Transportation (DOT) Statewide Sign Management System development effort. For the last two years, a Task Force has embarked on a comprehensive effort to develop a sign management system to improve sign quality, as well as to manage all aspects of signage, from request, ordering, fabricating, installing, maintaining, and ultimately removing, and to provide the ability to budget for these key assets on a statewide basis. This effort supported the development of a sign inventory tool and is the beginning of the development of a sign management system to support the Iowa DOT efforts in the consistent, cost effective, and objective decision making process when it comes to signs and their maintenance.
Resumo:
Report on a review of selected general and application controls over the University of Northern Iowa Student Information System for the period June 12, 2012 through July 16, 2012
Resumo:
Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2013
Resumo:
This is the final report of the of IowAccess Project 8, which designed and implemented a geospatial data infrastructure for Iowa, including a formalized coordination body, a coordination staff, and enhanced data clearing house, and a statewide GIS training and education effort.
Resumo:
This report describes the work accomplished to date on research project HR-173, A Computer Based Information System for County Equipment Cost Records, and presents the initial design for this system. The specific topics discussed here are findings from the analysis of information needs, the system specifications developed from these findings, and the proposed system design based upon the system specifications. The initial system design will include tentative input designs for capturing input data, output designs to show the output formats and the items to be output for use in decision making, file design showing the organization of information to be kept on each piece of equipment in the computer data file, and general system design explaining how the entire system will operate. The Steering Committee appointed by Iowa Highway Research Board is asked to study this report, make appropriate suggestions, and give approval to the proposed design subject to any suggestions made. This approval will permit the designer to proceed promptly with the development of the computer program implementation phase of the design.
Resumo:
This appendix is divided into three sections. The first section contains abstracts of each of the eight computer programs in the system, instructions for keypunching the three input documents, and computer operating instructions pertaining to each program. The second section contains system flowcharts for the entire system as well as program flowcharts for each program. The last section contains PL/l program listings of each program.
Resumo:
Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2014