983 resultados para Flood control.
Resumo:
Cover title.
Resumo:
"January, 1985."
Resumo:
Mode of access: Internet.
Resumo:
"DOWR/SES/94-003."
Resumo:
"July 1983."
Resumo:
Mode of access: Internet.
Resumo:
Cover title.
Resumo:
Cover title.
Resumo:
"Authority for the preparation of this report and state participation in the flood protection recommendations contained herein is provided by the Flood Control Act of 1945 [615 ILCS 15]."--Leaf 2.
Resumo:
"December 1975."
Resumo:
"June, 1986."
Resumo:
"February, 1986."
Resumo:
Kept up to date by addendum.
Resumo:
"October, 1985."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.