909 resultados para Decisions
Resumo:
This paper focuses on timing of fertility decisions, conditional on the level of educational attainment of parents. Timing of fertility and educational attainment of parents rationalize the negative relationship observed in the data between hourly wages and childbearing. It is shown how the recent evolution in total fertility rates observed in developed countries could be in part the result of a transition from an early childbearing regime to a late childbearing regime. I develop a general equilibrium overlapping generations model in order to understand the joint determination of timing of childbearing decisions together with other household economic decisions in a life cycle framework. I show how idiosyncratic uncertainty might have asymmetric efects on completed fertility depending on timing of childbearing, generating the diferences in completed fertility observed between households that difer in their level of educational attainment.
Resumo:
Les decisions que comentaré entorn de la construcció d'un informe etnografic estan basades en l'experiencia d'un procés de recerca en la realització d'un estudi de cas. La finalitat d'aquest estudi de cas únic era pretendre comprendre una vida professional docent per tal de descriure, analitzar i interpretar la complexitat del que és i envolta la vida d'una mestra, considerant tant els aspectes biografics -personals i professionals- com els aspectes de la seva practica i, alhora, relacionar ambdós en un context cultural més ampli (escola, sistema educatiu, valors socials, etc.).
Resumo:
There has been a great deal of concern by county engineers and supervisors over constrained budgets, lack of resources and a deteriorating infrastructure, as they affect the secondary road system in Iowa. In addition, public input and/or political pressure have been increasing over the years. This study was initiated to determine the most important issues facing counties and document the way in which various Iowa counties have been addressing those issues. The list of issues was developed through meetings of county engineers and supervisors in each of the Iowa Department of Transportation (DOT) regions around the state. Questionnaires were sent to all engineers and supervisors statewide asking them how the various issues (e.g. snow and ice removal policies, Level "B" roads, and so on) were handled in their respective counties. The responses were then compiled into this document. The subjects selected and used include: county policies, ordinances, resolutions; snow and ice removal policy; dust control; Level "B" roads; vacating roads; rural development; private entrance construction and maintenance; roadside management practices; right of way encroachments and easements; personnel matters, staff and organization; communicating information to citizens; supervisor/ engineer relations; and county leasing/purchasing practices.
Resumo:
La Teoria Econòmica està construïda sobre la hipòtesis de racionalitat dels agents econòmics. La racionalitat de l’homo economicus consisteix en què maximitza la seva utilitat tractant d’obtenir els majors beneficis amb el menor esforç, si bé l’aplicació d’aquesta hipòtesi a l’ésser humà no és plena ja que la seva motivació no sempreés biològica i de vegades actua empès per aspectes culturals difícils d’associar a un benefici1. Tanmateix, la hipòtesi de racionalitat s’ha considerat una bona representació dels aspectes essencials del comportamenteconòmic de l’ésser humà. El problema es presenta quan la Teoria Econòmica no és capaç d’explicar ni resoldre satisfactòriament problemes tan rellevants com les bombolles especulatives i la causa d’aquesta mancança s’atribueix a una construcció inadequada d’aquesta Teoria...
Resumo:
OBJECTIVE: To determine the prevalence of cardiopulmonary resuscitation (CPR) and do-not-attempt-resuscitation (DNAR) orders, to define factors associated with CPR/DNAR orders and to explore how physicians make and document these decisions. METHODS: We prospectively reviewed CPR/DNAR forms of 1,446 patients admitted to the General Internal Medicine Department of the Geneva University Hospitals, a tertiary-care teaching hospital in Switzerland. We additionally administered a face-to-face survey to residents in charge of 206 patients including DNAR and CPR orders, with or without patient inclusion. RESULTS: 21.2% of the patients had a DNAR order, 61.7% a CPR order and 17.1% had neither. The two main factors associated with DNAR orders were a worse prognosis and/or a worse quality of life. Others factors were an older age, cancer and psychiatric diagnoses, and the absence of decision-making capacity. Residents gave four major justifications for DNAR orders: important comorbid conditions (34%), the patients' or their family's resuscitation preferences (18%), the patients' age (14.2%), and the absence of decision-making capacity (8%). Residents who wrote DNAR orders were more experienced. In many of the DNAR or CPR forms (19.8 and 16%, respectively), the order was written using a variety of formulations. For 24% of the residents, the distinction between the resuscitation order and the care objective was not clear. 38% of the residents found the resuscitation form useful. CONCLUSION: Patients' prognosis and quality of life were the two main independent factors associated with CPR/DNAR orders. However, in the majority of cases, residents evaluated prognosis only intuitively, and quality of life without involving the patients. The distinction between CPR/DNAR orders and the care objectives was not always clear. Specific training regarding CPR/DNAR orders is necessary to improve the CPR/DNAR decision process used by physicians.
Resumo:
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.
Resumo:
The approach to intervention programs varies depending on the methodological perspective adopted. This means that health professionals lack clear guidelines regarding how best to proceed, and it hinders the accumulation of knowledge. The aim of this paper is to set out the essential and common aspects that should be included in any program evaluation report, thereby providing a useful guide for the professional regardless of the procedural approach used. Furthermore, the paper seeks to integrate the different methodologies and illustrate their complementarity, this being a key aspect in terms of real intervention contexts, which are constantly changing. The aspects to be included are presented in relation to the main stages of the evaluation process: needs, objectives and design (prior to the intervention), implementation (during the intervention), and outcomes (after the intervention). For each of these stages the paper describes the elements on which decisions should be based, highlighting the role of empirical evidence gathered through the application of instruments to defined samples and according to a given procedure.
Resumo:
For several years, the Iowa Department of Transportation has constructed bypasses along rural highways. Most bypasses were constructed on the state’s Commercial Industrial Network (CIN). Now that work on the CIN has been completed and the system is open to traffic, it is possible to study the impacts of bypasses. In the past, construction of highway bypasses has led community residents and business people to raise concerns about the loss of business activity. For policy development purposes, it is essential to understand the impacts that a bypass might have on safety, the community, and economics. By researching these impacts, policies can be produced to help to alleviate any negative impacts and create a better system that is ultimately more cost-effective. This study found that the use of trade area analysis does not provide proof that a bypass can positively or negatively impact the economy of a rural community. The analysis did show that, even though the population of a community may be stable for several years and per capita income is increasing, sales leakage still occurs. The literature, site visits, and data make it is apparent that a bypass can positively affect a community. Some conditions that would need to exist in order to maximize a positive impact include the installation of signage along the bypass directing travelers to businesses and services in the community, community or regional plans that include the bypass in future land development scenarios, and businesses adjusting their business plans to attract bypass users. In addition, how proactive a community is in adapting to the bypass will determine the kinds of effects felt in the community. Results of statistical safety analysis indicate that, at least when crashes are separated by severity, bypasses with at-grade accesses appear to perform more poorly than either the bypasses with fully separated accesses or with a mix of at-grade and fully separated accesses. However, the benefit in terms of improved safety of bypasses with fully separated accesses relative to bypasses with a mixed type of accesses is not statistically conclusive.
Resumo:
Diferents estudis mostren que les persones que parlen dues llengües són més àgils a l"hora de resoldre conflictes en què cal valorar diferents informacions de manera simultània
Resumo:
Diferents estudis mostren que les persones que parlen dues llengües són més àgils a l"hora de resoldre conflictes en què cal valorar diferents informacions de manera simultània
Resumo:
Tutkimuksessa haluttiin selvittää, mitkä tekijät vaikuttavat ravintoon liittyvän suositusmerkin käyttöön kuluttajan ostopäätöksen apuna. Tutkimuksen viitekehyksen pohjaksi valittiin suunnitellun toiminnan teoria, joka on osoittautunut selittämään hyvin useaa ravintoon- ja terveyteen liittyvää käyttäytymistä. Tutkimustoteutettiin kyselytutkimuksella, jonka aineisto kerättiin Internetissä julkaistulla kyselylomakkeella. Tulokset osoittivat, että kuluttajan aikomus käyttää suositusmerkkiä oli mallin vahvin selittäjä. Lisäksi merkin käyttöä selitti kuluttajan kokema sisäinen kontrolli, johon ulkoinen kontrolli vahvasti vaikuttaa. Ostopäätössitoutumisen havaittiin vaikuttavan aikomuksen ja todellisen merkin käytön väliseen yhteyteen. Yleisesti tulokset osoittivat, että kuluttajilla on aikomusta käyttää merkkiä, mutta todellinen käyttö on huomattavasti vähäisempää.
Resumo:
DDM is a framework that combines intelligent agents and artificial intelligence traditional algorithms such as classifiers. The central idea of this project is to create a multi-agent system that allows to compare different views into a single one.
Resumo:
The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.