906 resultados para Benefit analysis


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The primary motivation for the vehicle replacement schemes that were implemented in many countries was to encourage the purchase of new cars. The basic assumption of these schemes was that these acquisitions would benefit both the economy and the environment as older and less fuel-efficient cars were scrapped and replaced with more fuel-efficient models. In this article, we present a new environmental impact assessment method for assessing the effectiveness of scrappage schemes for reducing CO2 emissions taking into account the rebound effect, driving behavior for older versus new cars and entire lifecycle emissions for during the manufacturing processes of new cars. The assessment of the Japanese scrappage scheme shows that CO2 emissions would only decrease if users of the scheme retained their new gasoline passenger vehicles for at least 4.7 years. When vehicle replacements were restricted to hybrid cars, the reduction in CO2 achieved by the scheme would be 6-8.5 times higher than the emissions resulting from a scheme involving standard, gasoline passenger vehicles. Cost-benefit analysis, based on the emission reduction potential, showed that the scheme was very costly. Sensitivity analysis showed that the Japanese government failed to determine the optimum, or target, car age for scrapping old cars in the scheme. Specifically, scrapping cars aged 13 years and over did not maximize the environmental benefits of the scheme. Consequently, modifying this policy to include a reduction in new car subsidies, focused funding for fuel-efficient cars, and modifying the target car age, would increase environmental benefits. © 2013 Elsevier Ltd.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A power electronics-based buffer is examined in which through control of its PWM converters, the buffer-load combination is driven to operate under either constant power or constant impedance modes. A battery, incorporated within the buffer, provides the energy storage facility to facilitate the necessary power flow control. Real power demand from upstream supply is regulated under fault condition, and the possibility of voltage or network instability is reduced. The proposed buffer is also applied to a wind farm. It is shown that the buffer stabilizes the power contribution from the farm. Based on a battery cost-benefit analysis, a method is developed to determine the optimal level of the power supplied from the wind farm and the corresponding capacity of the battery storage system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Many infrastructure agencies adopt sustainability objectives at a corporate level and incorporate sustainability targets and indicators as part of corporate reporting processes. These objectives are expected to translate to all stages of the project delivery process, including project selection. For infrastructure capital works projects and programs, a robust project management approach involves the development of a business case to guide investment decision making. A key tool in the assessment of project options and selection of a delivery strategy is Cost Benefit Analysis (CBA). Infrastructure providers are required to undertake cost benefit analysis to support project selection through regulatory approval and budgetary processes. This tool has emerged through the prism of economic analysis rather than sustainability. A literature review reveals the limitations of CBA alone to effectively evaluate economic, environmental and social externalities or impacts that apply over a long time frame, and that are ultimately irreversible. Multi-Criteria Analysis (MCA) has been introduced as a means to incorporate a wider array of factors into decision making such as sustainability. This, however, presents new challenges with issues around how to transparently represent wider community values in the selection of a preferred solution. Are these tools effective in assessing the wider sustainability costs and benefits taking into account that these are public works with long life spans and significant impacts across institutional boundaries? The research indicates a need to develop clear guidelines for investment decision making in order to better align with corporate sustainability objectives. Findings from the literature review indicate that a more sustainable approach to investment decision-making framework should include: the incorporation of sustainability goals from corporate planning documents; problem definition and option generation using best practice investment management guidelines; improved guidelines for Business Case development using a combination of both Cost Benefit Analysis and Multi-Criteria Analysis; and an integrated public participation process.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In responding to future influenza pandemics and other infectious agents, plasmid DNA overcomes many of the limitations of conventional vaccine production approaches.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper develops a dynamic model for cost-effective selection of sites for restoring biodiversity when habitat quality develops over time and is uncertain. A safety-first decision criterion is used for ensuring a minimum level of habitats, and this is formulated in a chance-constrained programming framework. The theoretical results show; (i) inclusion of quality growth reduces overall cost for achieving a future biodiversity target from relatively early establishment of habitats, but (ii) consideration of uncertainty in growth increases total cost and delays establishment, and (iii) cost-effective trading of habitat requires exchange rate between sites that varies over time. An empirical application to the red listed umbrella species - white-backed woodpecker - shows that the total cost of achieving habitat targets specified in the Swedish recovery plan is doubled if the target is to be achieved with high reliability, and that equilibrating price on a habitat trading market differs considerably between different quality growth combinations. © 2013 Elsevier GmbH.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Introduced predators can have pronounced effects on naïve prey species; thus, predator control is often essential for conservation of threatened native species. Complete eradication of the predator, although desirable, may be elusive in budget-limited situations, whereas predator suppression is more feasible and may still achieve conservation goals. We used a stochastic predator-prey model based on a Lotka-Volterra system to investigate the cost-effectiveness of predator control to achieve prey conservation. We compared five control strategies: immediate eradication, removal of a constant number of predators (fixed-number control), removal of a constant proportion of predators (fixed-rate control), removal of predators that exceed a predetermined threshold (upper-trigger harvest), and removal of predators whenever their population falls below a lower predetermined threshold (lower-trigger harvest). We looked at the performance of these strategies when managers could always remove the full number of predators targeted by each strategy, subject to budget availability. Under this assumption immediate eradication reduced the threat to the prey population the most. We then examined the effect of reduced management success in meeting removal targets, assuming removal is more difficult at low predator densities. In this case there was a pronounced reduction in performance of the immediate eradication, fixed-number, and lower-trigger strategies. Although immediate eradication still yielded the highest expected minimum prey population size, upper-trigger harvest yielded the lowest probability of prey extinction and the greatest return on investment (as measured by improvement in expected minimum population size per amount spent). Upper-trigger harvest was relatively successful because it operated when predator density was highest, which is when predator removal targets can be more easily met and the effect of predators on the prey is most damaging. This suggests that controlling predators only when they are most abundant is the "best" strategy when financial resources are limited and eradication is unlikely. © 2008 Society for Conservation Biology.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Moose populations are managed for sustainable yield balanced against costs caused by damage to forestry or agriculture and collisions with vehicles. Optimal harvests can be calculated based on a structured population model driven by data on abundance and the composition of bulls, cows, and calves obtained by aerial-survey monitoring during winter. Quotas are established by the respective government agency and licenses are issued to hunters to harvest an animal of specified age or sex during the following autumn. Because the cost of aerial monitoring is high, we use a Management Strategy Evaluation to evaluate the costs and benefits of periodic aerial surveys in the context of moose management. Our on-the-fly "seat of your pants" alternative to independent monitoring is management based solely on the kill of moose by hunters, which is usually sufficient to alert the manager to declines in moose abundance that warrant adjustments to harvest strategies. Harvests are relatively cheap to monitor; therefore, data can be obtained each year facilitating annual adjustments to quotas. Other sources of "cheap" monitoring data such as records of the number of moose seen by hunters while hunting also might be obtained, and may provide further useful insight into population abundance, structure and health. Because conservation dollars are usually limited, the high cost of aerial surveys is difficult to justify when alternative methods exist. © 2012 Elsevier Inc.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The notion of being sure that you have completely eradicated an invasive species is fanciful because of imperfect detection and persistent seed banks. Eradication is commonly declared either on an ad hoc basis, on notions of seed bank longevity, or on setting arbitrary thresholds of 1% or 5% confidence that the species is not present. Rather than declaring eradication at some arbitrary level of confidence, we take an economic approach in which we stop looking when the expected costs outweigh the expected benefits. We develop theory that determines the number of years of absent surveys required to minimize the net expected cost. Given detection of a species is imperfect, the optimal stopping time is a trade-off between the cost of continued surveying and the cost of escape and damage if eradication is declared too soon. A simple rule of thumb compares well to the exact optimal solution using stochastic dynamic programming. Application of the approach to the eradication programme of Helenium amarum reveals that the actual stopping time was a precautionary one given the ranges for each parameter. © 2006 Blackwell Publishing Ltd/CNRS.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Threatened species often exist in a small number of isolated subpopulations. Given limitations on conservation spending, managers must choose from strategies that range from managing just one subpopulation and risking all other subpopulations to managing all subpopulations equally and poorly, thereby risking the loss of all subpopulations. We took an economic approach to this problem in an effort to discover a simple rule of thumb for optimally allocating conservation effort among subpopulations. This rule was derived by maximizing the expected number of extant subpopulations remaining given n subpopulations are actually managed. We also derived a spatiotemporally optimized strategy through stochastic dynamic programming. The rule of thumb suggested that more subpopulations should be managed if the budget increases or if the cost of reducing local extinction probabilities decreases. The rule performed well against the exact optimal strategy that was the result of the stochastic dynamic program and much better than other simple strategies (e.g., always manage one extant subpopulation or half of the remaining subpopulation). We applied our approach to the allocation of funds in 2 contrasting case studies: reduction of poaching of Sumatran tigers (Panthera tigris sumatrae) and habitat acquisition for San Joaquin kit foxes (Vulpes macrotis mutica). For our estimated annual budget for Sumatran tiger management, the mean time to extinction was about 32 years. For our estimated annual management budget for kit foxes in the San Joaquin Valley, the mean time to extinction was approximately 24 years. Our framework allows managers to deal with the important question of how to allocate scarce conservation resources among subpopulations of any threatened species. © 2008 Society for Conservation Biology.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This research quantifies traffic congestion and travel time reliability with case study on a major arterial road in Brisbane. The focus is on the analysis of impact of incidents (e.g., road accidents) on travel time reliability. Real traffic (Bluetooth) and incident records from Coronation Drive, Brisbane are utilized for the study. The findings include significant impact of incidents on traffic congestion and travel time reliability. The knowledge gained is useful in various applications such as traveler information systems, and cost-benefit analysis of various strategies to reduce the traffic incidents and its' impacts.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This research provides additional knowledge on the benefits and costs to society, in particular of road transport procured through Public-Private Partnership (PPP) arrangements. Currently, the public sector comparator (PSC) and cost-benefit analysis (CBA) used to evaluate and measure the benefits and costs of PPP are limited in their capacity to predict and forecast long-term events. PPP is attractive to governments due to the non-upfront payment, perceived value for money, and risk allocation and transfer to the private investor. However, public sector remains the guarantor, and under-writer of the private investor's loan from financial institutions and other voluntary risks which are unlimited to future compensatory claims. The new knowledge from this research is the introduction of a framework capable of evaluating, and measuring the associated PPP benefits, as well as the costs, effects, and impacts to society which are protracted and sporadic by nature.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Individuals with limb amputation fitted with conventional socket-suspended prostheses often experience socket-related discomfort leading to a significant decrease in quality of life. Bone-anchored prostheses are increasingly acknowledged as viable alternative method of attachment of artificial limb. In this case, the prosthesis is attached directly to the residual skeleton through a percutaneous fixation. To date, a few osseointegration fixations are commercially available. Several devices are at different stages of development particularly in Europe and the US. [1-15] Clearly, surgical procedures are currently blooming worldwide. Indeed, Australia and Queensland, in particular, have one of the fastest growing populations. Previous studies involving either screw-type implants or press-fit fixations for bone-anchorage have focused on biomechanics aspects as well as the clinical benefits and safety of the procedure. In principle, bone-anchored prostheses should eliminate lifetime expenses associated with sockets and, consequently, potentially alleviate the financial burden of amputation for governmental organizations. Unfortunately, publications focusing on cost-effectiveness are sparse. In fact, only one study published by Haggstrom et al (2012), reported that “despite significantly fewer visits for prosthetic service the annual mean costs for osseointegrated prostheses were comparable with socket-suspended prostheses”. Consequently, governmental organizations such as Queensland Artificial Limb Services (QALS) are facing a number of challenges while adjusting financial assistance schemes that should be fair and equitable to their clients fitted with bone-anchored prostheses. Clearly, more scientific evidence extracted from governmental databases is needed to further consolidate the analyses of financial burden associated with both methods of attachment (i.e., conventional sockets prostheses, bone-anchored prostheses). The purpose of the presentation will be to share the current outcomes of a cost-analysis study lead by QALS. The specific objectives will be: • To outline methodological avenues to assess the cost-effectiveness of bone-anchored prostheses compared to conventional sockets prostheses, • To highlight the potential obstacles and limitations in cost-effectiveness analyses of bone-anchored prostheses, • To present cohort results of a cost-effectiveness (QALY vs cost) including the determination of fair Incremental cost-effectiveness Ratios (ICER) as well as cost-benefit analysis focusing on the comparing costs and key outcome indicators (e.g., QTFA, TUG, 6MWT, activities of daily living) over QALS funding cycles for both methods of attachment.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Objective. To assess the cost-effectiveness of bone density screening programmes for osteoporosis. Study design. Using published and locally available data regarding fracture rates and treatment costs, the overall costs per fracture prevented, cost per quality of life year (QALY) saved and cost per year of life gained were estimated for different bone density screening and osteoporosis treatment programmes. Main outcome measures. Cost per fracture prevented, cost per QALY saved, and cost per year of life gained. Results. In women over the age of 50 years, the costs per fracture prevented of treating all women with hormone replacement therapy, or treating only if osteoporosis is demonstrated on bone density screening were £32,594 or £23,867 respectively. For alendronate therapy for the same groups, the costs were £171,067 and £14,067 respectively. Once the background rate of treatment with alendronate reaches 18%, bone density screening becomes cost-saving. Costs estimates per QALY saved ranged from £1,514 to £39,076 for osteoporosis treatment with alendronate following bone density screening. Conclusions. For relatively expensive medications such as alendronate, treatment programmes with prior bone density screening are far more cost effective than those without, and in some circumstances become cost-saving. Costs per QALY of life saved and per year of life gained for osteoporosis treatment with prior bone density screening compare favourably with treatment of hypertension and hypercholesterolemia.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Two prerequisites for realistically embarking upon an eradication programme are that cost-benefit analysis favours this strategy over other management options and that sufficient resources are available to carry the programme through to completion. These are not independent criteria, but it is our view that too little attention has been paid to estimating the investment required to complete weed eradication programmes. We deal with this problem by using a two-pronged approach: 1) developing a stochastic dynamic model that provides an estimation of programme duration; and 2) estimating the inputs required to delimit a weed incursion and to prevent weed reproduction over a sufficiently long period to allow extirpation of all infestations. The model is built upon relationships that capture the time-related detection of new infested areas, rates of progression of infestations from the active to the monitoring stage, rates of reversion of infestations from the monitoring to active stage, and the frequency distribution of time since last detection for all infestations. This approach is applied to the branched broomrape (Orobanche ramosa) eradication programme currently underway in South Australia. This programme commenced in 1999 and currently 7450 ha are known to be infested with the weed. To date none of the infestations have been eradicated. Given recent (2008) levels of investment and current eradication methods, model predictions are that it would take, on average, an additional 73 years to eradicate this weed at an average additional cost (NPV) of $AU67.9m. When the model was run for circumstances in 2003 and 2006, the average programme duration and total cost (NPV) were predicted to be 159 and 94 years, and $AU91.3m and $AU72.3m, respectively. The reduction in estimated programme length and cost may represent progress towards the eradication objective, although eradication of this species still remains a long term prospect.