781 resultados para Alternative Dispute Resolution, Contract Management, UK Construction Industry


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The existing literature on lean construction is overwhelmingly prescriptive with little recognition of the social and politicised nature of the diffusion process. The prevailing production-engineering perspective too often assumes that organizations are unitary entities where all parties strive for the common goal of 'improved performance'. An alternative perspective is developed that considers the diffusion of lean construction across contested pluralistic arenas. Different actors mobilize different storylines to suit their own localized political agendas. Multiple storylines of lean construction continuously compete for attention with other management fashions. The conceptualization and enactment of lean construction therefore differs across contexts, often taking on different manifestations from those envisaged. However, such localized enactments of lean construction are patterned and conditioned by pre-existing social and economic structures over which individual managers have limited influence. Taking a broader view, 'leanness' can be conceptualized in terms of a quest for structural flexibility involving restructuring, downsizing and outsourcing. From this perspective, the UK construction industry can be seen to have embarked upon leaner ways of working in the mid-1970s, long before the terminology of lean thinking came into vogue. Semi-structured interviews with construction sector policy-makers provide empirical support for the view that lean construction is a multifaceted concept that defies universal definition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK industry has been criticised for being slow to adopt construction process innovations. Research shows that the idiosyncrasies of participants, their roles in the system and the contextual differences between sections of the industry make this a highly complex problem. There is considerable evidence that informal social networks play a key role in diffusion of innovations. The aim is to identify informal communication networks of project participants and the role these play in the diffusion of construction innovations. The characteristics of this network will be analysed in order to understand how they can be used to accelerate innovation diffusion within and between projects. Social Network Analysis is used to determine informal communication routes. Control and experiment case study projects are used within two different organizations. This allows informal communication routes concerning innovations to be mapped, whilst testing if the informal routes can facilitate diffusion. Analysis will focus upon understanding the combination of informal strong and weak ties, and how these impede or facilitate the diffusion of the innovation. Initial work suggests the presence of an informal communication network. Actors within this informal network, and the organization's management are unaware of its' existence and their informal roles within it. Thus, the network remains an untapped medium regarding innovation diffusion. It is proposed that successful innovation diffusion is dependent upon understanding informal strong and weak ties, at project, organization and industry level.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.