This paper reports on design of digital control for wind turbines and its relation to the quality of power fed into the Brazilian grid on connecting to it a 192 MW wind farm equipped with doubly fed induction generators. PWM converters are deployed as vector controlled regulated current voltage sources for their rotors, for independent control of both active and reactive power of those generators. Both speed control and active power control strategies are analyzed, in the search for maximum efficiency of conversion of wind kinetic energy into electric power and enhanced quality of delivered power. (C) 2009 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Multilevel power converters have been introduced as the solution for high-power high-voltage switching applications where they have well-known advantages. Recently, full back-to-back connected multilevel neutral point diode clamped converters (NPC converter) have been used inhigh-voltage direct current (HVDC) transmission systems. Bipolar-connected back-to-back NPC converters have advantages in long-distance HVDCtransmission systems over the full back-to-back connection, but greater difficulty to balance the dc capacitor voltage divider on both sending and receiving end NPC converters. This study shows that power flow control and dc capacitor voltage balancing are feasible using fast optimum-predictive-based controllers in HVDC systems using bipolar back-to-back-connected five-level NPC multilevel converters. For both converter sides, the control strategytakes in account active and reactive power, which establishes ac grid currents in both ends, and guarantees the balancing of dc bus capacitor voltages inboth NPC converters. Additionally, the semiconductor switching frequency is minimised to reduce switching losses. The performance and robustness of the new fast predictive control strategy, and its capability to solve the DC capacitor voltage balancing problem of bipolar-connected back-to-back NPCconverters are evaluated.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Voltage source multilevel power converter structures are being considered for high power high voltage applications where they have well known advantages. Recently, full back-to-back connected multilevel neutral diode clamped converters (NPC) have been used in high voltage direct current (HVDC) transmission systems. Bipolar back-to-back connection of NPCs have advantages in long distance HVDC transmission systems, but highly increased difficulties to balance the dc capacitor voltage dividers on both sending and receiving end NPCs. This paper proposes a fast optimum-predictive controller to balance the dc capacitor voltages and to control the power flow in a long distance HVDCsystem using bipolar back-to-back connected NPCs. For both converter sides, the control strategy considers active and reactive power to establish ac grid currents on sending and receiving ends, while guaranteeing the balancing of both NPC dc bus capacitor voltages. Furthermore, the fast predictivecontroller minimizes the semiconductor switching frequency to reduce global switching losses. The performance and robustness of the new fast predictive control strategy and the associated dc capacitors voltage balancing are evaluated. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper presents a methodology which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states by Monte Carlo simulation. This is followed by a remedial action algorithm, based on optimal power flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. In order to illustrate the application of the proposed methodology to a practical case, the paper will include a case study for the Reliability Test System (RTS) 1996 IEEE 24 BUS.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Important research effort has been devoted to the topic of optimal planning of distribution systems. The non linear nature of the system, the need to consider a large number of scenarios and the increasing necessity to deal with uncertainties make optimal planning in distribution systems a difficult task. Heuristic techniques approaches have been proposed to deal with these issues, overcoming some of the inherent difficulties of classic methodologies. This paper considers several methodologies used to address planning problems of electrical power distribution networks, namely mixedinteger linear programming (MILP), ant colony algorithms (AC), genetic algorithms (GA), tabu search (TS), branch exchange (BE), simulated annealing (SA) and the Bender´s decomposition deterministic non-linear optimization technique (BD). Adequacy of theses techniques to deal with uncertainties is discussed. The behaviour of each optimization technique is compared from the point of view of the obtained solution and of the methodology performance. The paper presents results of the application of these optimization techniques to a real case of a 10-kV electrical distribution system with 201 nodes that feeds an urban area.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Este trabalho surgiu do âmbito da Tese de Dissertação do Mestrado em Energias Sustentáveis do Instituto Superior de Engenharia do Porto, tendo o acompanhamento dos orientadores da empresa Laboratório Ecotermolab do Instituto de Soldadura e Qualidade e do Instituto Superior de Engenharia do Porto, de forma a garantir a linha traçada indo de acordo aos objectivos propostos. A presente tese abordou o estudo do impacto da influência do ar novo na climatização de edifícios, tendo como base de apoio à análise a simulação dinâmica do edifício em condições reais num programa adequado, acreditado pela norma ASHRAE 140-2004. Este trabalho pretendeu evidenciar qual o impacto da influência do ar novo na climatização de um edifício com a conjugação de vários factores, tais como, ocupação, actividades e padrões de utilização (horários), iluminação e equipamentos, estudando ainda a possibilidade do sistema funcionar em regime de “Free-Cooling”. O princípio partiu fundamentalmente por determinar até que ponto se pode climatizar recorrendo único e exclusivamente à introdução de ar novo em regime de “Free-Cooling”, através de um sistema tudo-ar de Volume de Ar Variável - VAV, sem o apoio de qualquer outro sistema de climatização auxiliar localizado no espaço, respeitando os caudais mínimos impostos pelo RSECE (Decreto-Lei 79/2006). Numa primeira fase foram identificados todos os dados relativos à determinação das cargas térmicas do edifício, tendo em conta todos os factores e contributos alusivos ao valor da carga térmica, tais como a transmissão de calor e seus constituintes, a iluminação, a ventilação, o uso de equipamentos e os níveis de ocupação. Consequentemente foram elaboradas diversas simulações dinâmicas com o recurso ao programa EnergyPlus integrado no DesignBuilder, conjugando variáveis desde as envolventes à própria arquitectura, perfis de utilização ocupacional, equipamentos e taxas de renovação de ar nos diferentes espaços do edifício em estudo. Obtiveram-se vários modelos de forma a promover um estudo comparativo e aprofundado que permitisse determinar o impacto do ar novo na climatização do edifício, perspectivando a capacidade funcional do sistema funcionar em regime de “Free-Cooling”. Deste modo, a análise e comparação dos dados obtidos permitiram chegar às seguintes conclusões: Tendo em consideração que para necessidades de arrefecimento bastante elevadas, o “Free-Cooling” diurno revelou-se pouco eficaz ou quase nulo, para o tipo de clima verificado em Portugal, pois o diferencial de temperatura existente entre o exterior e o interior não é suficiente de modo a tornar possível a remoção das cargas de forma a baixar a temperatura interior para o intervalo de conforto. Em relação ao “Free-Cooling” em horário nocturno ou pós-laboral, este revelou-se bem mais eficiente. Obtiveram-se prestações muito interessantes sobretudo durante as estações de aquecimento e meia-estação, tendo em consideração o facto de existir necessidades de arrefecimento mesmo durante a estação de aquecimento. Referente à ventilação nocturna, isto é, em períodos de madrugada e fecho do edifício, concluiu-se que tal contribui para um abaixamento do calor acumulado durante o dia nos materiais construtivos do edifício e que é libertado ou restituído posteriormente para os espaços em períodos mais tardios. De entre as seguintes variáveis, aumento de caudal de ar novo insuflado e o diferencial de temperatura existente entre o ar exterior e interior, ficou demonstrado que este último teria maior peso contributivo na remoção do calor. Por fim, é ponto assente que de um modo geral, um sistema de climatização será sempre indispensável devido a cargas internas elevadas, requisitos interiores de temperatura e humidade, sendo no entanto aconselhado o “Free- Cooling” como um opção viável a incorporar na solução de climatização, de forma a promover o arrefecimento natural, a redução do consumo energético e a introdução activa de ar novo.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This thesis presents the Fuzzy Monte Carlo Model for Transmission Power Systems Reliability based studies (FMC-TRel) methodology, which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states. This is followed by a remedial action algorithm, based on Optimal Power Flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. For the system states that cause load curtailment, an optimization approach is applied to reduce the probability of occurrence of these states while minimizing the costs to achieve that reduction. This methodology is of most importance for supporting the transmission system operator decision making, namely in the identification of critical components and in the planning of future investments in the transmission power system. A case study based on Reliability Test System (RTS) 1996 IEEE 24 Bus is presented to illustrate with detail the application of the proposed methodology.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper presents a decision support tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy resource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Nos tempos atuais as empresas que atuam no ramo dos sistemas elétricos de energias enfrentam desafios cada vez mais exigentes, dado o enquadramento normativo a que estão sujeitas por parte da entidade reguladora dos serviços energéticos. No caso do Arquipélago dos Açores, o normativo relativo ao regulamento da qualidade de serviço entrou em vigor em 2006, trazendo à EDA,S.A. (Eletricidade dos Açores), entidade responsável pelo transporte e distribuição de energia na região, novas exigências para adequados níveis de eficiência e de garantias aos clientes, no que respeita à qualidade de serviço que lhes é prestado. No âmbito deste trabalho, é efetuado o estudo do trânsito de potência sobre a rede distribuição 15 kV da ilha Graciosa. Para tal, é realizada a modelização da rede no software de rede elétricas porwerworld 8.0. e são idealizados um conjunto de cenários de exploração da rede, que visam simular situações reais que ocorrem na exploração diária da rede de distribuição da ilha. Nas simulações a efetuar consideram-se dois cenários com perfil de carga distintos, um referente à ponta máxima, e outro referente ao vazio mínimo, verificados no ano de 2014. Quanto ao modo de exploração da rede nos cenários a simular, é contemplado o modo de exploração normalmente operado pela empresa gestora, bem como diversas reconfigurações sobre o modo de exploração normalmente operado, realizadas através da abertura e fecho dos aparelhos de corte constituintes da rede. Em todos os cenários simulados, é realizado um estudo relativamente à potência de perdas do sistema, ao perfil da tensão nos diversos postos de transformação, e ao congestionamento de energia verificado nas linhas de distribuição da rede.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Tipicamente as redes elétricas de distribuição apresentam uma topologia parcialmente malhada e são exploradas radialmente. A topologia radial é obtida através da abertura das malhas nos locais que otimizam o ponto de operação da rede, através da instalação de aparelhos de corte que operam normalmente abertos. Para além de manterem a topologia radial, estes equipamentos possibilitam também a transferência de cargas entre saídas, aquando da ocorrência de defeitos. As saídas radiais são ainda dotadas de aparelhos de corte que operam normalmente fechados, estes têm como objetivo maximizar a fiabilidade e isolar defeitos, minimizando a área afetada pelos mesmos. Assim, na presente dissertação são desenvolvidos dois algoritmos determinísticos para a localização ótima de aparelhos de corte normalmente abertos e fechados, minimizando a potência ativa de perdas e o custo da energia não distribuída. O algoritmo de localização de aparelhos de corte normalmente abertos visa encontrar a topologia radial ótima que minimiza a potência ativa de perdas. O método é desenvolvido em ambiente Matlab – Tomlab, e é formulado como um problema de programação quadrática inteira mista. A topologia radial ótima é garantida através do cálculo de um trânsito de potências ótimo baseado no modelo DC. A função objetivo é dada pelas perdas por efeito de Joule. Por outro lado o problema é restringido pela primeira lei de Kirchhoff, limites de geração das subestações, limites térmicos dos condutores, trânsito de potência unidirecional e pela condição de radialidade. Os aparelhos de corte normalmente fechados são localizados ao longo das saídas radiais obtidas pelo anterior algoritmo, e permite minimizar o custo da energia não distribuída. No limite é possível localizar um aparelho de corte normalmente fechado em todas as linhas de uma rede de distribuição, sendo esta a solução que minimiza a energia não distribuída. No entanto, tendo em conta que a cada aparelho de corte está associado um investimento, é fundamental encontrar um equilíbrio entre a melhoria de fiabilidade e o investimento. Desta forma, o algoritmo desenvolvido avalia os benefícios obtidos com a instalação de aparelhos de corte normalmente fechados, e retorna o número e a localização dos mesmo que minimiza o custo da energia não distribuída. Os métodos apresentados são testados em duas redes de distribuição reais, exploradas com um nível de tensão de 15 kV e 30 kV, respetivamente. A primeira rede é localizada no distrito do Porto e é caraterizada por uma topologia mista e urbana. A segunda rede é localizada no distrito de Bragança e é caracterizada por uma topologia maioritariamente aérea e rural.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Experimental results of a new controller able to support bidirectional power flow in a full-bridge rectifier with boost-like topology are obtained. The controller is computed using port Hamiltonian passivity techniques for a suitable generalized state space averaging truncation system, which transforms the control objectives, namely constant output voltage dc-bus and unity input power factor, into a regulation problem. Simulation results for the full system show the essential correctness of the simplifications introduced to obtain the controller, although some small experimental discrepancies point to several aspects that need further improvement.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Manival near Grenoble (French Prealps) is a very active debris-flow torrent equipped with a large sediment trap (25 000 m3) protecting an urbanized alluvial fan from debris-flows. We began monitoring the sediment budget of the catchment controlled by the trap in Spring 2009. Terrestrial laser scanner is used for monitoring topographic changes in a small gully, the main channel, and the sediment trap. In the main channel, 39 cross-sections are surveyed after every event. Three periods of intense geomorphic activity are documented here. The first was induced by a convective storm in August 2009 which triggered a debris-flow that deposited ~1,800 m3 of sediment in the trap. The debris-flow originated in the upper reach of the main channel and our observations showed that sediment outputs were entirely supplied by channel scouring. Hillslope debris-flows were initiated on talus slopes, as revealed by terrestrial LiDAR resurveys; however they were disconnected to the main channel. The second and third periods of geomorphic activity were induced by long duration and low intensity rainfall events in September and October 2009 which generate small flow events with intense bedload transport. These events contribute to recharge the debris-flow channel with sediments by depositing important gravel dunes propagating from headwaters. The total recharge in the torrent subsequent to bedload transport events was estimated at 34% of the sediment erosion induced by the August debris-flow.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the Thesis main focus is done on power flow development paths around the Baltic States as well as on market-based requirements for creation of the common Baltic electricity market. Current market regulations between the countries are presented; barriers for creating competitive common Baltic power market and for electricity trading with third countries are clarified; solutions are offered and corresponding road map is developed. Future power development paths around the Baltic States are analysed. For this purpose the 330 kV transmission grid of Estonia, Latvia and Lithuania is modelled in a power flow tool. Power flow calculations are carried out for winter and summer peak and off-peak load periods in 2020 with different combinations of interconnections. While carrying out power balance experiments several power flow patterns in the Baltic States are revealed. Conclusions are made about security of supply, grid congestion and transmission capacity availability for different scenarios.