932 resultados para 290804 Construction Engineering
Resumo:
This paper presents the results of a series of tension tests on CFRP bonded steel plate double strap joints. The main aim of this research is to provide detailed understanding of bond characteristics using experimental and numerical analysis of strengthened double strap joints under tension. A parametric study has been performed by numerical modelling with the variables of CFRP bond lengths, adhesive maximum strain and adhesive layer thicknesses. Finally, bond-slip models are proposed for three different types of adhesives within the range of the parametric study.
Resumo:
Purpose The purpose of this paper is to explore the process, and analyse the implementation of constructability improvement and innovation result during the planning and design for sea water intake structure of fertilizer plant project. Design/methodology/approach The research methodology approach is case study method at project level. This constructability improvement process was investigated by using constructability implementation check lists, direct observation, documented lesson learned analysis and key personnel interviews. Findings The case study shows that the implementation of constructability during planning and design stage for this sea water intake structure has increased the project performance as well as improved the schedule by 5 months (14.21%) and reduced the project cost by 15.35%. Research limitations/implications This case study was limited to three (3) previous sea water intake projects as references and one (1) of new method sea water intake structure at fertilizer plant project. Practical implications A constructability improvement check list using theory and lesson learned for the specific construction project was documented. Originality/value The findings support the relevant study of constructability and provide specific lesson learned for three (3) previous project and one (1) of the new innovation method of the construction project and documented by the company.
Resumo:
The effective implementation of such an ISO 9001 Quality Management System (QMS) in construction companies requires a proper and full implementation of the system to allow companies to improve the way they operate, by this means increasing profitability and market share, producing innovative and sustainable construction products, or improving employee and customer satisfaction. In light of this, this paper discusses the current status of QMS implementation, particularly related to the twenty elements of ISO 9001 within the grade 7 (G-7) category of Indonesian construction companies. A survey was conducted involving 403 respondents from 77 companies, to solicit an evaluation of the current implementation levels of the ISO 9001 elements. The survey findings indicated that for a large percentage of the sector surveyed they had ‘not so fully implemented’ the elements. Scrutiny of the data had also indicated elements that are ‘minimally implemented’, whilst none of the elements fell in the category of ‘fully implemented’. Based on these findings, it is suggested that the G-7 contractors may need to fully commit to practicing control of customer-supplied product and statistical techniques in order to enhance an effective implementation of ISO 9001 elements for ensuring better quality performance. These two elements are recognized as the least implemented of the quality elements.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
Infrastructure organizations are operating in an increasingly challenging business environment as a result of globalization, privatization and deregulation. In an external business environment that is constantly changing, extant literature on strategic management advocates the need to focus on factors internal to the organization such as resources and capabilities to sustain their performance. Specifically, they need to develop dynamic capabilities in order to survive and prosper under conditions of change. The aim of this paper is to explore the dynamic capabilities needed in the management of transport infrastructure assets using a multiple case study research strategy. This paper produced a number of findings. First, the empirical evidence showed that the core infrastructure asset management processes are capacity management, options evaluation, procurement & delivery, maintenance management, and asset information management. Second, the study identified five dynamic capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets in an increasingly dynamic business environment.
Resumo:
Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.
Resumo:
Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.
Resumo:
Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.
Resumo:
This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy.
Resumo:
The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.
Resumo:
Unsafe acts of workers (e.g. misjudgment, inappropriate operation) become the major root causes of construction accidents when they are combined with unsafe working conditions (e.g. working surface conditions, weather) on a construction site. The overarching goal of the research presented in this paper is to explore ways to prevent unsafe acts of workers and reduce the likelihood of construction accidents occurring. The study specifically aims to (1) understand the relationships between human behavior related and working condition related risk factors, (2) identify the significant behavior and condition factors and their impacts on accident types (e.g. struck by/against, caught in/between, falling, shock, inhalation/ingestion/absorption, respiratory failure) and injury severity (e.g. fatality, hospitalized, non-hospitalized), and (3) analyze the fundamental accident-injury relationship on how each accident type contributes to the injury severity. The study reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011. The large number of accident samples supported reliable statistical analyses. The analysis identified a total of 17 significant correlations between behavior and condition factors and distinguished key risk factors that highly impacted on the determination of accident types and injury severity. The research outcomes will assist safety managers to control specific unsafe acts of workers by eliminating the associated unsafe working conditions and vice versa. They also can prioritize risk factors and pay more attention to controlling them in order to achieve a safer working environment.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
Knowledge management (KM) continues to receive mounting interest within the construction industry due to its potential to offer solutions for organisations seeking competitive advantage. This paper presents a KM input-process-output conceptual model comprising unique and well-defined theoretical constructs representing KM practices and their internal and external determinants in the context of construction. The paper also presents the underlying principles used in operationally defining each construct using extant KM literature, and offers a number of testable hypotheses that capture the inter-relationships between the identified constructs.