997 resultados para liquidity cost


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper studies the effects of increasing formality via tax reduction and simplification schemes on micro-firm performance. It uses the 1997 Brazilian SIMPLES program. We develop a simple theoretical model to show that SIMPLES has an impact only on a segment of the micro-firm population, for which the effect of formality on firm performance can be identified, and that can be analyzed along the single dimensional quantiles of the conditional firm revenues. To estimate the effect of formality, we use an econometric approach that compares eligible and non-eligible firms, born before and after SIMPLES in a local interval about the introduction of SIMPLES. We use an estimator that combines both quantile regression and the regression discontinuity identification strategy. The empirical results corroborate the positive effect of formality on microfirms' performance and produce a clear characterization of who benefits from these programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Firms are faced with a wider set of choices when they identify a need for new office space. They can build or purchase accommodation, lease space for long or short periods with or without the inclusion of services, or they can use “instant office” solutions provided by serviced office operators. But how do they evaluate these alternatives and are they able to make rational choices? The research found that the shortening of business horizons lead to the desire for more office space on short-term contracts often with the inclusion of at least some facilities management and business support services. The need for greater flexibility, particularly in financial terms, was highlighted as an important criteria when selecting new office accommodation. The current office portfolios held were perceived not to meet these requirements. However, there was often a lack of good quality data available within occupiers which could be used to help them analyse the range of choices in the market. Additionally, there were other organisational constraints to making decisions about inclusive real estate products. These included fragmentation of decisions-making, internal politics and the lack of assessment of business risk alongside real estate risk. Overall therefore, corporate occupiers themselves act as an interial force to the development of new and innovative real estate products.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We present a novel way of interacting with an immersive virtual environment which involves inexpensive motion-capture using the Wii Remote®. A software framework is also presented to visualize and share this information across two remote CAVETM-like environments. The resulting application can be used to assist rehabilitation by sending motion information across remote sites. The application’s software and hardware components are scalable enough to be used on a desktop computer when home-based rehabilitation is preferred.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Mitigation Options for Phosphorus and Sediment (MOPS) project investigated the effectiveness of within-field control measures (tramline management, straw residue management, type of cultivation and direction, and vegetative buffers) in terms of mitigating sediment and phosphorus loss from winter-sown combinable cereal crops using three case study sites. To determine the cost of the approaches, simple financial spreadsheet models were constructed at both farm and regional levels. Taking into account crop areas, crop rotation margins per hectare were calculated to reflect the costs of crop establishment, fertiliser and agro-chemical applications, harvesting, and the associated labour and machinery costs. Variable and operating costs associated with each mitigation option were then incorporated to demonstrate the impact on the relevant crop enterprise and crop rotation margins. These costs were then compared to runoff, sediment and phosphorus loss data obtained from monitoring hillslope-length scale field plots. Each of the mitigation options explored in this study had potential for reducing sediment and phosphorus losses from arable land under cereal crops. Sediment losses were reduced from between 9 kg ha−1 to as much as 4780 kg ha−1 with a corresponding reduction in phosphorus loss from 0.03 kg ha−1 to 2.89 kg ha−1. In percentage terms reductions of phosphorus were between 9% and 99%. Impacts on crop rotation margins also varied. Minimum tillage resulted in cost savings (up to £50 ha−1) whilst other options showed increased costs (up to £19 ha−1 for straw residue incorporation). Overall, the results indicate that each of the options has potential for on-farm implementation. However, tramline management appeared to have the greatest potential for reducing runoff, sediment, and phosphorus losses from arable land (between 69% and 99%) and is likely to be considered cost-effective with only a small additional cost of £2–4 ha−1, although further work is needed to evaluate alternative tramline management methods. Tramline management is also the only option not incorporated within current policy mechanisms associated with reducing soil erosion and phosphorus loss and in light of its potential is an approach that should be encouraged once further evidence is available.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The traditional economic approach for appraising the costs and benefits of construction project Net Present Values involves the calculation of net returns for each investment option under different discount rates. An alternative approach consists of multiple-project discount rates based on risk modelling. The example of a portfolio of microgeneration renewable energy technology (MRET) is presented to demonstrate that risks and future available budget for re-investment can be taken into account when setting discount rates for construction project specifications in presence of uncertainty. A formal demonstration is carried out through a reversed intertemporal approach of applied general equilibrium. It is demonstrated that risk and the estimated available budget for future re-investment can be included in the simultaneous assessment of the costs and benefits of multiple projects.