992 resultados para generation costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sixty cattle farmers in England were questioned about the costs associated with premovement testing for bovine tuberculosis (TB). On average, the farmers had premovement tested 2-45 times in the previous 12 months, but the majority had tested only once. An average of 28.6 animals were tested on each occasion, but there were wide variations. The average farm labour costs were (sic)4.00 per animal tested, veterinary costs were (sic)4.33 and other costs were (sic)0.51, giving a total cost of (sic)8.84, but there were wide variations between farms, and many incurred costs of more than (sic)20 per animal. A majority of the farmers also cited disruption to the farm business or missed market opportunities as costs, but few could estimate their financial cost. Most of the farmers thought that premovement testing was a cost burden on their business, and over half thought It was not an effective policy to control bovine TB.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An on-farm survey of 151 cattle farmers who had experienced a bovine tuberculosis (Mycobacterium bovis) breakdown on their farms was undertaken in 2003 to assess the costs associated with the breakdown. In 90 per cent of cases the cost was estimated to be less than 18,513 pound for dairy herds and less than El 1,462 for beef herds, but with a range from 229 pound to 103,817 pound. The main cost was the slaughter of reactor cattle. For the majority of the farmers, the compensation payments seemed to meet most of the costs of their breakdowns, although a majority was still left with net losses.