994 resultados para expert design
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 3 - Road and Bridge Design. This module provides hands on examples of how to use metric measurements in the design of roads and structures.
Resumo:
In the field of thrombosis and haemostasis, many preanalytical variables influence the results of coagulation assays and measures to limit potential results variations should be taken. To our knowledge, no paper describing the development and maintenance of a haemostasis biobank has been previously published. Our description of the biobank of the Swiss cohort of elderly patients with venous thromboembolism (SWITCO65+) is intended to facilitate the set-up of other biobanks in the field of thrombosis and haemostasis. SWITCO65+ is a multicentre cohort that prospectively enrolled consecutive patients aged ≥65 years with venous thromboembolism at nine Swiss hospitals from 09/2009 to 03/2012. Patients will be followed up until December 2013. The cohort includes a biobank with biological material from each participant taken at baseline and after 12 months of follow-up. Whole blood from all participants is assayed with a standard haematology panel, for which fresh samples are required. Two buffy coat vials, one PAXgene Blood RNA System tube and one EDTA-whole blood sample are also collected at baseline for RNA/DNA extraction. Blood samples are processed and vialed within 1 h of collection and transported in batches to a central laboratory where they are stored in ultra-low temperature archives. All analyses of the same type are performed in the same laboratory in batches. Using multiple core laboratories increased the speed of sample analyses and reduced storage time. After recruiting, processing and analyzing the blood of more than 1,000 patients, we determined that the adopted methods and technologies were fit-for-purpose and robust.
Resumo:
The need for upgrading a large number of understrength bridges in the United States has been well documented in the literature. This manual presents two methods for strengthening continuous-span composite bridges: post-tensioning of the positive moment regions of the bridge stringers and the addition of superimposed trusses at the piers. The use of these two systems is an efficient method of reducing flexural overstresses in undercapacity bridges. Before strengthening a given bridge however, other deficiencies (inadequate shear connection, fatigue problems, extensive corrosion) should be addressed. Since continuous-span composite bridges are indeterminant structures, there is longitudinal and transverse distribution of the strengthening axial forces and moments. This manual basically provides the engineer with a procedure for determining the distribution of strengthening forces and moments throughout the bridge. As a result of the longitudinal and transverse force distribution, the design methodology presented in this manual for continuous-span composite bridges is extremely complex. To simplify the procedure, a spreadsheet has been developed for use by practicing engineers. This design aid greatly simplifies the design of a strengthening system for a given bridge in that it eliminates numerous tedious hand calculations, computes the required force and moment fractions, and performs the necessary iterations for determining the required strengthening forces. The force and moment distribution fraction formulas developed in this manual are primarily for the Iowa DOT V12 and V14 three-span four-stringer bridges. These formulas may be used on other bridges if they are within the limits stated in this manual. Use of the distribution fraction formulas for bridges not within the stated limits is not recommended.