998 resultados para Pipe line
Resumo:
Sediments recovered from seven Last Glacial Maximum grounding lines sites, around the Antarctic Peninsula, were analyzed using micromorphology. This is the first evidence that grounding line sediments from around the Antarctic Peninsula have complex deformational histories and subglacial origins. It was determined that grounding zone wedge contain multiple units, or diamicton layers, with homogenized boundaries. The multiple diamicton units / layers are due to the accretionary formation of a grounding line wedge. All the sediments were deposited via deformation, and continual reincorporation, homogenization of lower diamicton layers by upper diamicton layers produced what macroscopically appeared to be a single massive diamicton unit. The morainal ridge that was sampled, alternatively, is composed of a single unit, or diamicton layer, that was subglacial in origin and believed to have been pushed out to form a ridge that was subsequently deformed via glacial push.
Resumo:
A photograph of men working to weld the railway line at Baie Comeau. The caption reads, "Welding railway line as rails joined immediately behind the temporary staff house".
Resumo:
A photograph with the caption "Railway line, on trestle, immediately behind millsite".
Resumo:
A listing of the pilots competing in the All Women's International Air Race, 1953.
Resumo:
Clipping from a Town Council meeting at which estimates of the costs of Railway Line no. 1 and Line no. 2 were submitted by the office of Port Dalhousie and Thorold Railway. The estimate was submitted by S.D. Woodruff and George Rykert, president. There is also a disclaimer in which Calvin Phelps claims to have resigned as director of the Port Dalhousie and Thorold Railway when he discovered that the company had no intention to adhere to the original plan for building and running the road, Aug. 1854.
Resumo:
Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.