1000 resultados para Ni(III)
Resumo:
Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. Volume I of this current study summarizes research methods and findings, while Volume II provides procedural details for incorporating into practice an infrequently-used testing technique–borehole shear tests. Volume III of this study of field investigation of fifteen slopes in Iowa demonstrates through further experimental testing how lateral forces develop along stabilizing piles to resist slope movements. Results establish the feasibility of an alternative stabilization approach utilizing small-diameter pile elements. Also, a step-by-step procedure that can be used by both state and county transportation agencies to design slope reinforcement using slender piles is documented. Initial evidence of the efficiency and cost-effectiveness of stabilizing nuisance slope failures with grouted micropiles is presented. Employment of the remediation alternative is deemed more appropriate for stabilizing shallow slope failures. Overall, work accomplished in this research study included completing a comprehensive literature review on the state of the knowledge of slope stability and slope stabilization, the preparation and performance of fourteen full-scale pile load tests, the analysis of load test results, and the documentation of a design methodology for implementing the technology into current practices of slope stabilization. Recommendations for further research include monitoring pilot studies of slope reinforcement with grouted micropiles, supplementary experimental studies, and advanced numerical studies.
Resumo:
We find that even very low Ni doping levels of high-quality Bi2Sr2Ca1Cu2O8 single crystals strongly affect the transition temperature T(c). We also observed that T(c) is not related to the total Ni concentration, but only to that of Ni engaged in NiO-type bonds. By controlling the temperature during crystal growth, one can modify the relative weight of Ni in NiO-type bonds with respect to other configurations-and therefore T(c).
Resumo:
BACKGROUND: Aromatase inhibitors provide superior disease control when compared with tamoxifen as adjuvant therapy for postmenopausal women with endocrine-responsive early breast cancer. PURPOSE: To present the design, history, and analytic challenges of the Breast International Group (BIG) 1-98 trial: an international, multicenter, randomized, double-blind, phase-III study comparing the aromatase inhibitor letrozole with tamoxifen in this clinical setting. METHODS: From 1998-2003, BIG 1-98 enrolled 8028 women to receive monotherapy with either tamoxifen or letrozole for 5 years, or sequential therapy of 2 years of one agent followed by 3 years of the other. Randomization to one of four treatment groups permitted two complementary analyses to be conducted several years apart. The first, reported in 2005, provided a head-to-head comparison of letrozole versus tamoxifen. Statistical power was increased by an enriched design, which included patients who were assigned sequential treatments until the time of the treatment switch. The second, reported in late 2008, used a conditional landmark approach to test the hypothesis that switching endocrine agents at approximately 2 years from randomization for patients who are disease-free is superior to continuing with the original agent. RESULTS: The 2005 analysis showed the superiority of letrozole compared with tamoxifen. The patients who were assigned tamoxifen alone were unblinded and offered the opportunity to switch to letrozole. Results from other trials increased the clinical relevance about whether or not to start treatment with letrozole or tamoxifen, and analysis plans were expanded to evaluate sequential versus single-agent strategies from randomization. LIMITATIONS: Due to the unblinding of patients assigned tamoxifen alone, analysis of updated data will require ascertainment of the influence of selective crossover from tamoxifen to letrozole. CONCLUSIONS: BIG 1-98 is an example of an enriched design, involving complementary analyses addressing different questions several years apart, and subject to evolving analytic plans influenced by new data that emerge over time.
Resumo:
La Loi vaudoise sur l'information (LInfo), en vigueur depuis le 1er septembre 2003, contient les bases légales relatives à l'information communiquée par l'Etat aux médias et au public. A l'image de plus en plus de législations en la matière, elle consacre le principe de l'information sur demande, selon lequel tout individu a désormais le droit de consulter des documents officiels et d'obtenir de l'information de la part des autorités sans devoir motiver sa demande. La présente évaluation s'intéresse à comprendre comment ce principe de transparence est défini dans cette loi, quelle est son application par l'administration, dans quelle mesure il est utilisé par les citoyens et enfin quels sont ses effets six ans après son entrée en vigueur. Das waadtländische Informationsgesetz (LInfo), in Kraft seit dem 1. September 2003, liefert die rechtliche Grundlage betreffend Informationen die durch den Kanton an die Medien und die Öffentlichkeit kommuniziert werden. Als Grundlage dient dazu das Prinzip um Erhalt von Informationen, nach welchem jede Person das Recht hat offizielle Dokumente einzusehen und Informationen von den Behörden zu erhalten ohne die Anfrage begründen zu müssen. Der vorliegende Beitrag hinterfragt wie dieses Transparenzprinzip im Gesetz definiert ist und wie es durch die Verwaltung angewendet wird. Weiter wird untersucht in welchem Ausmass es durch die Bürger und Bürgerinnen angewendet wird und was das Gesetz sechs Jahre nach seinem Inkrafttreten bewirkt hat.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 3 - Road and Bridge Design. This module provides hands on examples of how to use metric measurements in the design of roads and structures.