997 resultados para Gonadal development
Resumo:
This paper assesses the feasibility of impregnation/encasement of phase change materials (PCMs) in lightweight aggregates (LWAs). An impregnation process was adopted to carry out the encasement study of two different PCMs in four different LWAs. The leakage of the impregnated/encased PCMs was studied when they were submitted to freeze/thawing and oven drying tests, separately. The results confirmed that, the impregnation/encasement method is effective with respect to the large thermal energy storage density, and can be suitable for applications were PCMs cannot be incorporated directly such as asphalt road pavements.
Resumo:
Considering that the future of the construction sector in most European countries will mainly lie in the renovation of the existing building stock, in the next coming years thousands of energy inefficient buildings will need renovation to force EU member states to reach the EU 2020 targets and implement the Energy Performance of Buildings Directive (EPBD). Seeing the actual crisis in the construction sector as an opportunity, this work aims to develop a concept for prefabricated customizable sandwich panels for the multifunctional renovation of buildings, focusing also on technological innovation. More than a conventional solution, this proposal aims to combine sustainable and recycled building materials, available technologies and systems with advanced design and manufacturing tools within an integrated and mass-customizable approach of advanced building renovation prefabricated solutions. The adoption of these new proposed solutions would improve the living standards of the inhabitants of our cities, reducing energy inefficiency and other existing construction/renovation problems, while enabling some advanced features like the incorporation of technical modules that could even monitor the building performance during its full lifetime and the living conditions of its occupants.
Resumo:
The authors appreciate the collaboration of the following labs: Civitest for developing DHCC materials, PIEP for conducting VARTM process (Eng. Luis Oliveira) and Department of Civil Engineering of Minho University to perform the tests (Mr. Antonio Matos and Eng. Marco Jorge).
Resumo:
In order to compare the development of strata in the early stages of secondary forest succession with vessel parameters of the tree species, a forest inventory was carried out in 4-year (Q1: 48 m2), 11-year (Q2: 400 m2) and 20-year (Q3: 400 m2) forests and vessel parameters were investigated from stem cross sections of 18 species obtained in Q2. Thirty three species (21 families), 77 species (35 families), 39 species (20 families) were found in Ql, Q2, Q3, respectively. The percentage of dead individuals, dead stems and the percentage of individuals with multiple stems increased with time after clear cutting. Also, the total D2H of Q3 was 26.1 times that of Q1, and the development of strata started in Q2 and Q3. The image analysis of vessel size, area and number of vessels revealed that species which reach the forest canopy had a large D2H value, vessel diameter and area, while species which remain near the forest floor had smaller ones. Poecilanthe effusa (Huber) Ducke is an example of the latter case, with a large number of individuals and abundant sprouting of new stems from stumps, but with high mortality.
Resumo:
Attention to transferable skills is growing in higher education. Problem-based learning (PBL) is increasingly used in management education for its promising potential to, amongst others, promote transferable skills, including problem-solving, critical thinking and teamwork skills. However, this relationship is seldom assessed. In this study, I use structural equation modelling to examine the effectiveness of PBL, measured through students’ perceptions of satisfaction and skills development. Results show the development of transferable skills is explained by interaction with tutors and a host company, and defining teamwork rules. Satisfaction is explained by skills development, assessment issues, defining teamwork rules and understanding how organisations work. I draw conclusions and recommendations.
Resumo:
Supplementary information available at: http://www.rsc.org/suppdata/c5/gc/c5gc02231b/c5gc02231b1.pdf
Resumo:
This article presents a work performed in the maintenance department of a furniture company in Portugal, in order to develop and implement autonomous maintenance. The main objective of the project was related to the objective to increase and make effective the autonomous maintenance tasks performed by production operators, and in this way avoiding unplanned downtime due to equipment failures. Although some autonomous maintenance tasks were already carried out within the company, a preliminary study revealed weaknesses in the application of this tool. In the initial phase of this pilot project, the main problems encountered at the level of autonomous maintenance were related to the lack of time to carry out these tasks, showing that the stipulated procedures were far from the real needs of the company. To solve these problems a pilot project was conducted, making several changes in the performance of autonomous maintenance tasks, making them standard and adapted to reality of each production line. There was a general improvement in the factory indicators, and essentially there was a behavioral change, since the operators felt that their opinions were taking into account and began to understand the importance of small tasks performed by them.