993 resultados para Biotic communities--Ontario--Backus Woods.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This qualitative study explored secondary teachers' perceptions of scheduling in relation to pedagogy, curriculum, and observation of student learning. Its objective was to determine the best way to organize the scheduling for the delivery of Ontario's new 4-year curriculum. Six participants were chosen. Two were teaching in a semestered timetable, 1 in a traditional timetable, and 3 had experience in both schedules. Participants related a pressure cooker "lived experience" with weaker students in the semester system experiencing a particularly harsh environment. The inadequate amount of time for review in content-heavy courses, gap scheduling problems, catch-up difficulties for students missing classes, and the fast pace of semestering are identified as factors negatively impacting on these students. Government testing adds to the pressure by shifting teachers' time and attention in the classroom from deeper learning to a superficial coverage of material, from curriculum as lived to curriculum as text to be covered. Scheduling choice should be available in public education to accommodate the needs of all students. Curriculum guidelines need to be revamped to reflect the content that teachers believe is necessary for a successful course delivery. Applied level courses need to be developed for students who are not academically inferior but learn differently.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four staircase lakes occupying a single watershed located in the Algoma District, north of Lake Superior were chosen for this study. I examined the subfossil diatom assemblage in the top twenty centimeters of the surface sediments in each of these four lakes in an attempt to reconstruct their respective past pH history. From these analyses it was possible to test the hypothesis that the rate of change of diatom inferred pH was not significantly different in lakes located one below the other in a single "staircase" within a single watershed system. My results indicated that the four Z lakes had been acid for at least the last century. The water color of the three upper Z lakes (Z1, Z2 and Z3) was brown (>30 Pt Co units). The bottom lake (Z4) was the only clear water lake in the system «5 Pt Co units). This bottom staircase lake had no muskeg development around its shoreline. The alkaliphilous diatoms in the Z watershed system were important in determining the diatom inferred pH of the four Z lakes. The centric diatoms were extremely rare in the clearwater bottom lake (Z4). The ecology of the Eupodiscales is perhaps important in the interpretation of sediment in the more acid environment. Lake Z4 was the only one that had a progressive as well as a significant decrease in its downcore diatom inferred pH since the early 1960's. This lead me to speculate that the humic substances present in the upper three brown water lakes (Z1, Z2 and Z3) were perhaps Important in buffering them against a further decrease in water pH even though they were located within an area which was sensitive to acid precipitation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The rate of decrease in mean sediment size and weight per square metre along a 54 km reach of the Credit River was found to depend on variations in the channel geometry. The distribution of a specific sediment size consist of: (1) a transport zone; (2) an accumulation zone; and (3) a depletion zone. These zones shift downstream in response to downcurrent decreases in stream competence. Along a .285 km man-made pond, within the Credit River study area, the sediment is also characterized by downstream shifting accumulation zones for each finer clast size. The discharge required to initiate movement of 8 cm and 6 cm blocks in Cazenovia Creek is closely approximated by Baker and Ritter's equation. Incipient motion of blocks in Twenty Mile Creek is best predicted by Yalin's relation which is more efficient in deeper flows. The transport distance of blocks in both streams depends on channel roughness and geometry. Natural abrasion and distribution of clasts may depend on the size of the surrounding sediment and variations in flow competence. The cumulative percent weight loss with distance of laboratory abraded dolostone is defined by a power function. The decrease in weight of dolostone follows a negative exponential. In the abrasion mill, chipping causes the high initial weight loss of dolostone; crushing and grinding produce most of the subsequent weight loss. Clast size was found to have little effect on the abrasion of dolostone within the diameter range considered. Increasing the speed of the mill increased the initial amount of weight loss but decreased the rate of abrasion. The abrasion mill was found to produce more weight loss than stream action. The maximum percent weight loss determined from laboratory and field abrasion data is approximately 40 percent of the weight loss observed along the Credit River. Selective sorting of sediment explains the remaining percentage, not accounted for by abrasion.