1000 resultados para Achitectural Theory


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building services are worth about 2% GDP and are essential for the effective and efficient operations of the building. It is increasingly recognised that the value of a building is related to the way it supports the client organisation’s ongoing business operations. Building services are central to the functional performance of buildings and provide the necessary conditions for health, well-being, safety and security of the occupants. They frequently comprise several technologically distinct sub-systems and their design and construction requires the involvement of numerous disciplines and trades. Designers and contractors working on the same project are frequently employed by different companies. Materials and equipment is supplied by a diverse range of manufacturers. Facilities managers are responsible for operation of the building service in use. The coordination between these participants is crucially important to achieve optimum performance, but too often is neglected. This leaves room for serious faults. The need for effective integration is important. Modern technology offers increasing opportunities for integrated personal-control systems for lighting, ventilation and security as well as interoperability between systems. Opportunities for a new mode of systems integration are provided by the emergence of PFI/PPP procurements frameworks. This paper attempts to establish how systems integration can be achieved in the process of designing, constructing and operating building services. The essence of the paper therefore is to envisage the emergent organisational responses to the realisation of building services as an interactive systems network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most important decision variables in arranging a BOT-type contract, and there are few methodologies available for helping to determine the value of this variable. The BOTCcM presents an alternative method by which a group of concession period solutions are produced. Nevertheless, a typical weakness in using BOTCcM is that the model cannot recommend a specific time span for concessionary. This paper introduces a new method called BOT bargaining concession model (BOTBaC) to enable the identification of a specific concession period, which takes into account the bargaining behavior of the two parties concerned in engaging a BOT contract, namely, the investor and the government concerned. The application of BOTBaC is demonstrated through using an example case.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article outlines some of the key issues involved in developing a programme of strategy training for learners of French, in listening and in writing. It highlights the theoretical perspectives and research findings on listening and writing that informed the selection of strategies to teach learners and thence the development of appropriate materials. Examples of these materials are given as well as advice regarding their use. The article concludes with suggestions for how strategy training might be incorporated into teachers' own work with learners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article argues for a new theoretical paradigm for the analysis of change in educational institutions that is able to deal with such issues as readiness for change, transformational change and the failure of change strategies. Punctuated equilibrium (Tushman and Romanelli, 1985) is a theory which has wide application. It envisages long-term change as being made up of a succession of long periods of relative stability interspersed by brief periods of rapid profound change. In the periods of stability only relatively small incremental changes are possible. The periods of transformational change may be triggered by external or internal influences. A recent study of the long-term process of internationalisation in higher education institutions shows evidence to support the theory: long periods of incremental change, events precipitating profound change and the failure of externally imposed attempts to change. Also, as the theory predicts, changes in collegial organisations are slower and more uncertain than changes in managed organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: This study was designed to examine the existence of deficits in mentalizing or theory of mind (ToM) in children with traumatic brain injury (TBI). Research design: ToM functioning was assessed in 12 children aged 6-12 years with TBI and documented frontal lobe damage and compared to 12 controls matched for age, sex and verbal ability. Brief measures of attention and memory were also included. Main outcome and results: The TBI group was significantly impaired relative to controls on the advanced ToM measure and a measure of basic emotion recognition. No difference was found in a basic measure of ToM. Conclusion: Traumatic brain damage in childhood may disrupt the developmental acquisition of emotion recognition and advanced ToM skills. The clinical and theoretical importance of these findings is discussed and the implications for the assessment and treatment of children who have experienced TBI are outlined.