995 resultados para Abandoned mined lands reclamation -- Queensland
Resumo:
Groundwater modelling studies rely on an accurate determination of inputs and outputs that make up the water balance. Often there is large uncertainty associated with estimates of recharge and unmetered groundwater use. This can translate to equivalent uncertainty in the forecasting of sustainable yields, impacts of extraction, and susceptibility of groundwater dependent ecosystems. In the case of Coal Seam Gas, it is important to characterise the temporal and special distribution of depressurisation in the reservoir and how this may or may not extend to the adjacent aquifers. A regional groundwater flow model has been developed by the Queensland Government to predict drawdown impacts due to Coal Seam Gas activities in the Surat basin. This groundwater model is undergoing continued refinement and there is currently scope to address some of the key areas of uncertainty including better quantification of groundwater recharge and unmetered groundwater extractions. Research is currently underway to improve the accuracy of estimates of both of these components of the groundwater balance in order to reduce uncertainty in predicted groundwater drawdowns due to CSG activities.
Holistically approaching curriculum renewal: A case study of the Queensland University of Technology
Resumo:
There are still many programs in Australia and overseas where curricula comprise largely 20th Century-relevant graduate outcomes, framed in 20th Century learning and teaching approaches. A ‘Dynamic and Deliberative Model for Curriculum Renewal’ (DDMCR) model exists for undertaking such curriculum renewal that draws on the experiences of educators around the world, however there are few experiences to date in applying this model. At the Queensland University of Technology, the 2012 accreditation by Engineers Australia observed that, despite being exposed to relevant discipline-specific engineering curriculum and practice, students did not seem to be aware of the relevance of sustainable development to their degree, beyond first year exposure. In addressing this feedback, level 8 Australian Qualifications Framework, and drawing ideas from the DDMCR model, faculty senior management undertook a full review of the engineering curriculum.
Resumo:
PBDE concentrations are higher in children compared to adults with exposure suggested to include dust ingestion. Besides the home environment, children spend a great deal of time in school classrooms which may be a source of exposure. As part of the “Ultrafine Particles from Traffic Emissions and Children's Health (UPTECH)” project, dust samples (n=28) were obtained in 2011/12 from 10 Brisbane, Australia metropolitan schools and analysed using GC and LC–MS for polybrominated diphenyl ethers (PBDEs) -17, -28, -47, -49, -66, -85, -99, -100, -154, -183, and -209. Σ11PBDEs ranged from 11–2163 ng/g dust; with a mean and median of 600 and 469 ng/g dust, respectively. BDE-209 (range n.d. −2034 ng/g dust; mean (median) 402 (217) ng/g dust) was the dominant congener in most classrooms. Frequencies of detection were 96%, 96%, 39% and 93% for BDE-47, -99, -100 and -209, respectively. No seasonal variations were apparent and from each of the two schools where XRF measurements were carried out, only two classroom items had detectable bromine. PBDE intake for 8–11 year olds can be estimated at 0.094 ng/day BDE-47; 0.187 ng/day BDE-99 and 0.522 ng/day BDE-209 as a result of ingestion of classroom dust, based on mean PBDE concentrations. The 97.5% percentile intake is estimated to be 0.62, 1.03 and 2.14 ng/day for BDEs-47, -99 and -209, respectively. These PBDE concentrations in dust from classrooms, which are higher than in Australian homes, may explain some of the higher body burden of PBDEs in children compared to adults when taking into consideration age-dependant behaviours which increase dust ingestion.
Resumo:
This research investigated the use of DNA fingerprinting to characterise the bacteria Streptococcus pneumoniae or pneumococcus, and hence gain insight into the development of new vaccines or antibiotics. Different bacterial DNA fingerprinting methods were studied, and a novel method was developed and validated, which characterises different cell coatings that pneumococci produce. This method was used to study the epidemiology of pneumococci in Queensland before and after the introduction of the current pneumococcal vaccine. This study demonstrated that pneumococcal disease is highly prevalent in children under four years, that the bacteria can `switch' its cell coating to evade the vaccine, and that some DNA fingerprinting methods are more discriminatory than others. This has an impact on understanding which strains are more prone to cause invasive disease. Evidence of the excellent research findings have been published in high impact internationally refereed journals.
Resumo:
Alternative dispute resolution (ADR) methods, such as arbitration, are often used instead of litigation to resolve construction disputes, as industry folklore considers litigation overly expensive and time-consuming. But is this actually the case? Do the people most involved in construction dispute resolution agree? What are the real advantages and disadvantages of using litigation or ADR? When, if ever, is litigation the most appropriate way of resolving construction disputes? To answer these questions, this paper first provides a review of the literature on the use of litigation and ADR for construction dispute resolution. This is followed by the results of a survey of construction and legal personnel with moderate to extensive experience of dispute resolution in the Australian South-East Queensland construction industry. The main results of this are that, in addition to litigation being more expensive in money and time than ADR methods, the nature of the existing relationship between the parties has an important effect on the resolution process, what happens after an unsuccessful ADR and, if adversarial, is more likely to lead to litigation. The results are then validated and verified by one of the most experienced practitioners in claims and disputes in the whole of Australia.