1000 resultados para externalised cost


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A novel poly(p-xylylene), PPX, derivative bearing phenyl side groups was electrochemically synthesized in 85% yield. The polymer, poly(2-phenyl-p-xylylene) (PPPX), presented a major fraction (88%) soluble in common organic solvents. It showed to be thermally resistant up to 140 degrees C. UV-VIS analysis revealed an Egap of similar to 3.0 eV. Gas sensors made from thin films of CSA doped PPPX deposited on interdigitated electrodes exhibited significant changes in electrical conductance upon exposure to five carbonyl compounds: acetaldehyde, propionaldehyde. benzaldehyde, acetone and butanone. Three-dimensional plots of relative response vs. time of half-response vs. time of half-recovery showed good discrimination between the five carbonyl Compounds tested. (C) 2008 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dye-sensitized solar cells, named by us Dye-Cells, are one of the most promising devices for solar energy conversion due to their reduced production cost and low environmental impact, especially those sensitized by natural dyes. The efficiency and stability of devices based on natural sensitizers such as mulberry (Morus alba Lam), blueberry (Vaccinium myrtillus Lam), and jaboticaba`s skin (Mirtus cauliflora Mart) were investigated. Dye-Cells prepared with aqueous mulberry extract presented the highest P(max) value (1.6 mW cm(-2)) with J(sc) = 6.14 mA cm(-2) and V(oc) = 0.49 V, Photoelectrochemical parameters of 16 cm(2) active area devices sensitized by mulberry dye were constant for 14 weeks of continuous evaluation. Moreover, the cell remained stable even after 36 weeks with a fairly good efficiency. Therefore, mulberry dye opens up a perspective of commercial feasibility for inexpensive and environmentally friendly Dye-Cells. (C) 2009 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis uses zonal travel cost method (ZTCM) to estimate consumer surplus of Peace & Love festival in Borlänge, Sweden. The study defines counties as zones of origin of the visitors. Visiting rates from each zone are estimated based on survey data. The study is novel due to the fact that mostly TCM has been applied in the environmental and recreational sector, not for short term events, like P&L festival. The analysis shows that travel cost has a significantly negative effect on visiting rate as expected. Even though income has previously shown to be significant in similar studies, it turns out to be insignificant in this study. A point estimate for the total consumer surplus of P&L festival is 35.6 million Swedish kronor. However, this point estimate is associated with high uncertainty since a 95 % confidence interval for it is (17.9, 53.2). It is also important to note that the estimated value only represents one part of the total economic value, the other values of the festival's totaleconomic value have not been estimated in this thesis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is concerned with the cost efficiency in achieving the Swedish national air quality objectives under uncertainty. To realize an ecologically sustainable society, the parliament has approved a set of interim and long-term pollution reduction targets. However, there are considerable quantification uncertainties on the effectiveness of the proposed pollution reduction measures. In this paper, we develop a multivariate stochastic control framework to deal with the cost efficiency problem with multiple pollutants. Based on the cost and technological data collected by several national authorities, we explore the implications of alternative probabilistic constraints. It is found that a composite probabilistic constraint induces considerably lower abatement cost than separable probabilistic restrictions. The trend is reinforced by the presence of positive correlations between reductions in the multiple pollutants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper Swedish listed companies’ use of capital budgeting and cost of capital estimation methods in 2005 and 2008 are examined. The relation between company characteristics and choice of methods is investigated and both within-country longitudinal and cross-country comparisons are made. Larger companies seem to have used capital budgeting methods more frequently than smaller companies. When compared to U.S. and continental European companies, Swedish listed companies employed capital budgeting methods less frequently. In 2005 the most common method for establishing the cost of equity was by asking the investors what return they required. By 2008 CAPM was instead the most utilised method, which could indicate greater sophistication. The use of project risk when evaluating investments also seems to have gained in popularity, while the use of company risk declined. Overall, the use of sophisticated capital budgeting and cost of capital estimation methods seem to be rising and the use of less sophisticated methods declining.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper elaborates the routing of cable cycle through available routes in a building in order to link a set of devices, in a most reasonable way. Despite of the similarities to other NP-hard routing problems, the only goal is not only to minimize the cost (length of the cycle) but also to increase the reliability of the path (in case of a cable cut) which is assessed by a risk factor. Since there is often a trade-off between the risk and length factors, a criterion for ranking candidates and deciding the most reasonable solution is defined. A set of techniques is proposed to perform an efficient and exact search among candidates. A novel graph is introduced to reduce the search-space, and navigate the search toward feasible and desirable solutions. Moreover, admissible heuristic length estimation helps to early detection of partial cycles which lead to unreasonable solutions. The results show that the method provides solutions which are both technically and financially reasonable. Furthermore, it is proved that the proposed techniques are very efficient in reducing the computational time of the search to a reasonable amount.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The impact of deregulation on dispersion of earnings in Victoria has been
acknowledged in the findings of the recent task force enquiry into industrial relations in Victoria. This paper argues that the link between hours worked and rates of pay has played a significant role in this increased dispersion. Drawing upon detailed analysis of hours and wages in Victorian agreements, data is presented on declining take-home pay flowing from the loss of penalty rates. This, we argue, is attributable to
the lack of substantive and procedural protections available to Victorian workers under schedule 1A of the Workplace Relations Act, and formerly under the Victorian Employee Relations Act, 1992. We contrast these findings with collective agreements trading off penalty rates certified by the Australian Industrial Relations Commission, and Australian Workplace Agreements approved by the Office of the Employment
Advocate. We conclude by suggesting there is a scale of fair outcomes attached to the wages/hours trade-off, directly attributable to the various institutional mechanisms now influencing Australian wage determination.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pharmaceutical benefits provide a stable framework within which consumers, prescribers, suppliers, pharmacists and other actors undertake transactions. The state in effect delivers a good that enhances individual autonomy. A major reason for the legitimacy enjoyed by pharmaceutical benefits in both Australia and Sweden is that these programs have strong attributes of universalism (rather than targeting). Sweden's predominantly public health system allows greater scope for pharmaceutical policy innovation. Australia's Pharmaceutical Benefits Scheme (PBS), while historically resilient and effective, is now wedged precariously between traditional considerations of equity and public health on the one hand, and constant pressure for increased marketisation on the other.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Builds on earlier work which reported on the experience of the Hong Kong Government in using risk analysis techniques in capital cost estimating. In 1993 the Hong Kong Government implemented a methodology for capital cost estimating using risk analysis (ERA) in its public works planning. This calculated amount replaces the pre-1993 contingency allowance, which was merely a percentage addition on top of the base estimate of a project. Adopts a team approach to identify, classify and cost the uncertainties associated with a project. The sum of the average risk allowance for the identified risk events thus becomes the contingency. A study of the effect of ERA was carried out to compare the variability and consistency of the contingency estimates between non-ERA and ERA projects. The preliminary results of a survey showed a highly significant difference in variation and consistency between these groups. This analysis indicates the successful use of the ERA method for public works projects to reduce unnecessary and  exaggerated allowance for risk. However, the contingency allowance for ERA projects was also considered high. Adds data from the UK with descriptions of 41 private sector projects which fall into the non-ERA category and reflect better performance in the determining of contingency allowances.