981 resultados para Mode Iii Interfacial Crack
Resumo:
(Oct. 1 ... through Sept. 30 ...)
Resumo:
"February 27, 1981."
Resumo:
"September 2010." --Colophon.
Resumo:
Cover title.
The Economic impact of proposed regulation R82-14 : emissions of volatile organic material-RACT III.
Resumo:
"This document combines former documents 83/15, 83/31 and 83/32"--Spine.
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.