996 resultados para Library Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the transition to multicore processors almost complete, the parallel processing community is seeking efficient ways to port legacy message passing applications on shared memory and multicore processors. MPJ Express is our reference implementation of Message Passing Interface (MPI)-like bindings for the Java language. Starting with the current release, the MPJ Express software can be configured in two modes: the multicore and the cluster mode. In the multicore mode, parallel Java applications execute on shared memory or multicore processors. In the cluster mode, Java applications parallelized using MPJ Express can be executed on distributed memory platforms like compute clusters and clouds. The multicore device has been implemented using Java threads in order to satisfy two main design goals of portability and performance. We also discuss the challenges of integrating the multicore device in the MPJ Express software. This turned out to be a challenging task because the parallel application executes in a single JVM in the multicore mode. On the contrary in the cluster mode, the parallel user application executes in multiple JVMs. Due to these inherent architectural differences between the two modes, the MPJ Express runtime is modified to ensure correct semantics of the parallel program. Towards the end, we compare performance of MPJ Express (multicore mode) with other C and Java message passing libraries---including mpiJava, MPJ/Ibis, MPICH2, MPJ Express (cluster mode)---on shared memory and multicore processors. We found out that MPJ Express performs signicantly better in the multicore mode than in the cluster mode. Not only this but the MPJ Express software also performs better in comparison to other Java messaging libraries including mpiJava and MPJ/Ibis when used in the multicore mode on shared memory or multicore processors. We also demonstrate effectiveness of the MPJ Express multicore device in Gadget-2, which is a massively parallel astrophysics N-body siimulation code.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As integrated software solutions reshape project delivery, they alter the bases for collaboration and competition across firms in complex industries. This paper synthesises and extends literatures on strategy in project-based industries and digitally-integrated work to understand how project-based firms interact with digital infrastructures for project delivery. Four identified strategies are to: 1) develop and use capabilities to shape the integrated software solutions that are used in projects; 2) co-specialize, developing complementary assets to work repeatedly with a particular integrator firm; 3) retain flexibility by developing and maintaining capabilities in multiple digital technologies and processes; and 4) manage interfaces, translating work into project formats for coordination while hiding proprietary data and capabilities in internal systems. The paper articulates the strategic importance of digital infrastructures for delivery as well as product architectures. It concludes by discussing managerial implications of the identified strategies and areas for further research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.