992 resultados para 164-997


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aquaculture in Tanzania is still on a subsistence level and most of the ponds are maintained as part time job. The ponds are too small, shallow and over crowded with stunted Tilapia spp. In the present paper the results of experiments conducted in ponds at Nyegezi with T. esculenta and T. zillii are presented. This was part of an overall project of developing techniques of fish cultures with Tilapia under the limited existing conditions at Nyegezi. In a mono - species culture experiement with Tilapia zillii in nine month's time an average size of 172.8 mm/115.0 g was attained. In another experiment with T. zillii and T. esculenta in thirteen month's time, T. zillii attained an average size of 180.2mm/106.6 g and T. esculenta 193.6 mm/118.8 g. In another experiment with intensive feeding schedule an average size of 179.3 mm/126.6 g was attained by T. zillii and 191.0 mm/125.0 g by T. esculenta in four month's time. A locally prepared supplimentary feed with local Brewery Waste and Fish Meal (10:1) was readily accepted by both species of Tilapia. T. zillii voraciously fed on Cabbage leaves, Cauliflower leaves, Chinese cabbage leaves, Cassava leaves and on the common weed Comalina sp. Though all the items mentioned above were readily accepted by T. zillii feeding with Comaltna sp. was the easiest and most convenient because of its availability. In an intensive feeding experiment with vegetable leaves/Comalina sp. and the locally prepared supplimentary feed the fishes attained table size in four months time. Cement cistens of 5 X 3 X 1½ m size could be conveniently used for breeding both species of Tilapia. T. zillii had semi adhesive eggs and they were deposited on the sides of the cement wall. The number of young ones in a brood ranged from 160 to 314 in T. esculenta and 687 to 4,356 in T. zillii.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper discusses the sustainability of two different approaches to upgrade water and sanitation infrastructure in Kenya’s largest informal settlement, Kibera. A background to the urbanization of poverty is outlined along with approaches to urban slums. Two case-studies of completed interventions of infrastructure upgrading have been investigated. In one case-study, the upgrading method driven by an NGO uses an integrated livelihoods and partnership technique at community level to create an individual project. in the other case-study, the method is a collaboration between the government and a multi-lateral agency to deliver upgraded services as a part of a country-wide programme. The ‘bottom-up’ (project) and ‘top-down’ (programme) approaches each seek sustainability and aim to achieve this in the same context using different techniques. This paper investigates the sustainability of each approach. The merits and challenges of the approaches are discussed with the projected future of Kibera. The paper highlights the valuable opportunity for the role of appropriate engineering infrastructure for sustainable urban development, as well as the alleviation of poverty in a developing context.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Concerns over climate change mean engineers need to understand the greenhouse gas emissions associated with infrastructure projects. Standard coefficients are increasingly used to calculate the embodied emissions of construction materials, but these are not generally appropriate to inherently variable earthworks. This paper describes a new tool that takes a bottom-up approach to calculating carbon dioxide emissions from earthworks operations. In the case of bulk earthworks this is predominantly from the fuel used by machinery moving materials already on site. Typical earthworks solutions are explored along with the impact of using manufactured materials such as lime.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador: