1000 resultados para project organizing
Resumo:
The practical application of systemic sustainability analysis (SSA; Bell and Morse, 1999) as applied in-a project instigated and managed by 'Blue Plan', one of the regional activity centres of the Mediterranean Action Plan, is set out and explained in this paper. The context in which SSA was applied and adapted to SPSA (systemic and prospective sustainability analysis). is described in the Mediterranean, primarily in Malta. The SSA process is summarized, its extension and linkage to the prospective approach is described and the comments of stakeholders in the context are added. Some preliminary outcomes are suggested. The pauticular focus of the paper is on the lessons learned from doing SSA/SPSA within a classic blueprint project framework. It is-not assumed that SSA/SPSA is 'finished' or 'definitive'. Rather, we suggest that it is a developing and changing approach that practitioners can adapt and change to meet the specific needs of the circumstances that confront them. Copyright (C) 2004 John Wiley & Sons, Ltd and ERP Environment.
Resumo:
We give an overview on the development of "horizontal" European Committee for Standardisation (CEN) standards for characterising soils, sludges and biowaste in the context of environmental legislation in the European Union (EU). We discuss the various steps in the development of a horizontal standard (i.e. assessment of the possibility of such a standard, review of existing normative documents, pre-normative testing and validation) and related problems. We also provide a synopsis of European and international standards covered by the so-called Project HORIZONTAL. (C) 2004 Elsevier Ltd. All rights reserved.
Resumo:
It is becoming increasingly difficult to resource field archaeology outside the developer-funded context. Consequently it is difficult to engage the wider public in understanding the nature of archaeology and in the writing of its history from the study of material and environmental evidence. This paper describes a project funded by the UK's Heritage Lottery Fund designed to increase access by several means to a well-established and long-running archaeological excavation at the Iron Age and Roman Town at Silchester, Hampshire (UK).
Resumo:
This paper describes the results and conclusions of the INCA (Integrated Nitrogen Model for European CAtchments) project and sets the findings in the context of the ELOISE (European Land-Ocean Interaction Studies) programme. The INCA project was concerned with the development of a generic model of the major factors and processes controlling nitrogen dynamics in European river systems, thereby providing a tool (a) to aid the scientific understanding of nitrogen transport and retention in catchments and (b) for river-basin management and policy-making. The findings of the study highlight the heterogeneity of the factors and processes controlling nitrogen dynamics in freshwater systems. Nonetheless, the INCA model was able to simulate the in-stream nitrogen concentrations and fluxes observed at annual and seasonal timescales in Arctic, Continental and Maritime-Temperate regimes. This result suggests that the data requirements and structural complexity of the INCA model are appropriate to simulate nitrogen fluxes across a wide range of European freshwater environments. This is a major requirement for the production of coupled fiver-estuary-coastal shelf models for the management of our aquatic environment. With regard to river-basin management, to achieve an efficient reduction in nutrient fluxes from the land to the estuarine and coastal zone, the model simulations suggest that management options must be adaptable to the prevailing environmental and socio-economic factors in individual catchments: 'Blanket approaches' to environmental policy appear too simple. (c) 2004 Elsevier B.V. All rights reserved.
Resumo:
Acid mine drainage (AMD) is a widespread environmental problem associated with both working and abandoned mining operations. As part of an overall strategy to determine a long-term treatment option for AMD, a pilot passive treatment plant was constructed in 1994 at Wheat Jane Mine in Cornwall, UK. The plant consists of three separate systems; each containing aerobic reed beds, anaerobic cell and rock filters, and represents the largest European experimental facility of its kind. The systems only differ by the type of pre-treatment utilised to increase the pH of the influent minewater (pH<4): lime-dosed (LD), anoxic limestone drain (ALD) and lime free (LF), which receives no form of pre-treatment. The Wheal Jane pilot plant offered a unique facility and a major research project was established to evaluate the pilot plant and study in detail the biological mechanisms and the geochemical and physical processes that control passive treatment systems. The project has led to data, knowledge, models and design criteria for the future design, planning and sustainable management of passive treatment systems. A multidisciplinary team of scientists and managers from the U.K. universities, the Environment Agency and the Mining Industry has been put together to obtain the maximum advantage from the excellent facilities facility at Wheal Jane. (C) 2004 Elseaier B.V All rights reserved.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.