976 resultados para final degree project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report documents Phase III of a four-phase project. The goals of the project are to study the feasibility of using advanced technology from other industries to improve he efficiency and safety of winter highway maintenance vehicle operations, and to provide travelers with the level of service defined by policy during the winter season at the least cost to the taxpayers. The results of the first phase of the research were documented in the Concept Highway Maintenance Vehicle Final Report: Phase One dated April 1997, which describes the desirable functions of a concept maintenance vehicle and evaluates its feasibility. Phase I concluded by establishing the technologies that would be assembled and tested on the prototype vehicles in Phase II. The primary goals of phase II were to install the selected technologies on the prototype winter maintenance vehicles and to conduct proof of concept in advance of field evaluations planned for Phase III. This Phase III final report documents the work completed since the end of Phase II. During this time period, the Phase III work plan was completed and the redesigned friction meter was field tested. A vendor meeting was held to discuss future private sector participation and the new design for the Iowa vehicle. In addition, weather and roadway condition data were collected from the roadway weather information systems at selected sites in Iowa and Minnesota, for comparison to the vehicles' onboard temperature sensors. Furthermore, the team received new technology, such as the mobile Frensor unit, for bench testing and later installation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Storm Lake, the state's fourth largest natural lake, has been the centerpiece of significant economic development, including a resort, water park, and state marina. While there have been considerable improvements to the lake's water quality through a major on-going lake restoration program and watershed project, the Little Storm Lake area still needs to be addressed. Little Storm Lake is a 190 acre area on the nmihwest side of Storm Lake. The water level in both areas is based on the dam height located on the southeast corner of Storm Lake. Approximately 70% of the water from the watershed flows through Little Storm Lake. Little Storm Lake originally had the ability to remove much of the sediment and nutrients from incoming waters. However, due to degradation, proper wetland function has been compromised. Under normal hydrologic conditions Little Storm Lake has the potential to function as a sediment trap for Storm Lake, but tllis capacity is overwhelmed during high flows. Little Storm Lake is at or near its sediment trapping capacity, which results in higher sediment transport into Storm Lake. Resuspension of sediments due to wind and other in-lake dynamics, such as rough fish, further exacerbate the total turbidity from suspended sediment and results in movement of sediment from Little Storm Lake into Storm Lake. This project includes a fish barrier and water retention structure between Little Storm Lake and Storm Lake and the construction of a pumping station and associated equipment. The project involves periodic dewatering of Little Storm Lake during years of favorable climatological conditions to consolidate the sediments and revegetate the area. Construction of the fish banier would aid restoration efforts by preventing rough fish from destroying the vegetation and would decrease recruitment of rough fish by limiting their spawning area. In the future, if the diminished trapping capacity of Little Storm Lake still results in sediment moving into Storm Lake, a dredging project would be initiated to deepen Little Storm Lake.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Big Bear Creek is the upper portion of Bear Creek which drains 26,734 acres and ends at the Highway 136 crossing of Bear Creek. Bear Creek flows into the section of the Maquoketa River, which is on the EPA’s 303(d) List of Impaired Waters. Monitoring by the Iowa DNR indicates that Bear Creek is contributing significant amounts of sediment and nutrients to the Maquoketa River. The primary use of land in the Big Bear Creek Watershed is row crop production. A roadside survey completed by Anamosa Field Office Staff indicated that 123,747 tons/yr. of sediment was being lost due to sheet and rill erosion only. The sediment delivered to Big Bear Creek is 24,447 tons/yr. Based on this data, 34,226 lbs. of Phosphorus is reaching the stream per year. With the added amount of sediment and phosphorus delivery through gully and streambank erosion, one can clearly see that the water quality in Bear Creek is severely impaired. The Big Bear Watershed Project will work to reduce the sediment and phosphorus delivered to the stream by 30% through the installation of practices that trap sediment and reduce erosion.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The focus of this project is "Indian Creek", a tributary to Cedar Creek which eventually empties into the Lower Skunk River. Indian Creek suffers from deteriorated water quality resulting from high volumes of urban stormwater runoff resulting in streambank erosion, combined sewer overflows and chemical and floatable litter pollution from roadways. The "Creative Solution for Indian Creek Water Quality" project will work with a local commercial business to create a model urban project The project will reduce the volume of urban stormwater by 930,000 gallons annually entering Indian Creek as well as reduce the volume of discharge water by 500,000 gallons annually. The local business will develop a system to divert stormwater from l acre of their roof as well as coolant discharge water from their factory into an existing retention pond. In addition, the project will reduce demand on the municipal water supply by 500,000 gallons annually by harvesting water from the retention pond for cooling operations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The city of Elliott has had an increase in nitrate levels in their community water supply located in the Coe Creek Watershed. They have been working with the IDNR Source Water Protection (SWP) Programs to conduct site investigations and have formed a SWP Planning Team. This Team has been reviewing the investigation findings, formed an action plan and studied different Best Management Practices (BMPs). After considering the BMPs the SWP Team made a recommendation to the Elliott City Council which included native grass seeding and a shallow water wetland. The Team also held an informational meeting for the citizens of Elliott. The goal of this meeting was to inform and educate the public of the Team findings and BMPs. The Elliott City Council approved the restoration of a shallow wetland with a native grass buffer. This whole project is 27 acres and includes a shallow water wetland with native grass buffer. This would be a long term method to reduce nitrates in the city wells. Elliott is partnering with the Natural Resources Conservation Service, Montgomery County Soil and Water Conservation District, Pheasants Forever, the Montgomery County Conservation Board, US Fish and Wildlife Service and the Montgomery County Board of Supervisors in the restoration of the shallow water wetland and native grass buffer.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bear Creek is an impaired warm water fishery designated as class B(LR) by the Iowa DNR and is on 303 impaired waters list for fish kills and ammonia. Bear Creek is located in eastern Delaware County. This project is designed to improve the water quality of Bear Creek by educating the landowners, operators and watershed community about the importance of this water resource. The goal of the Bear Creek Watershed Project is to improve the water quality of Bear Creek by reducing the amounts of ammoniated manure discharge, fecal coliform bacteria, sediment, nitrogen, and phosphorous. The Bear Creek Watershed Project has been a watershed project since July 2004, first as a Demo project FY 2004-2005 and then full time WSPF/319 project FY06-09. Fish kills have not occurred in 2008-2009. Sediment delivery has decreased in the Bear Creek Watershed by 5,328 tons per year. The objectives of this watershed project will be to improve Livestock Waste Storage, to improve Livestock Waste Usage, to decrease Sediment Losses, and to improve Education & Area Outreach. This project will install 2 manure storage structures (EQIP/project funded), 19 ac of CRP waterways, 12 ac of project waterways, 17 ac of CRP filter strips along stream, 12 water and sediment control basins, 18,000 ft of terraces, 350 ac of new notill planting, and 3,700 ft of streambank protection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The City of West Union has been selected by Iowa Department of Economic Development as a Green Pilot Community. A major project within this designation is the reconstruction of the downtown business district public infrastructure in a sustainable, innovative, and replicable way. A key component of this project is replacement of the impermeable street and sidewalk surfacing with a porous paver system. This system, along with bio-retention cells in intersection bumpouts and sidewalk planters, will infiltrate, then cleanse and cool the storm water prior to a very slow discharge rate to Otter Creek. The project area will see a 95% reduction in peak discharge rate for a 100 year storm and a 20% reduction in runoff volume. West Union is located within the Otter Creek watershed, a designated cold water trout stream just below the city. Fayette County Soil and Water Conservation District and IDNR consider improvement of the water quality of Otter Creek to be very important. This reconstruction of downtown West Union in a sustainable manner will be the start of an overall Otter Creek watershed improvement project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Whit Oak Lake was listed on the 2008 Section 303(d) List if impaired waters in four categories. The first phase of the project has already helped to affect approximately 60% of the watershed. There has been an estimated sediment reduction of 609 tons per year with phase one. The structure being planned for the South end of the lake, (phase two) will affect nearly all of the remaining 40%. If we can accomplish similar results, we can expect a sediment reduction of approximately 273 tons additional per year. We have been working with the Mahaska County NRCS office, Snyder & Associates (engineers) and private landowners in the watershed to make this project a reality.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sand Creek is the most significant recreational fishery in Delaware County because of its location to Manchester and Lake Delhi. It is a feeder stream for game fish to the main stem of the Maquoketa River which is limited by the dams at Manchester and Lake Delhi. Sand Creek encompasses 16,045 acres and is dominated by row crop agriculture. It is being impacted by sediment, nutrients and E coli bacteria. Sand Creek will be a good example for habitat impaired watershed. The purpose of this project is to decrease the amount of sediment and nutrients reaching Sand Creek and to increase the habitat in Sand Creek to make it a better spawning and growing area for the fish and the food chain for the fish. The objectives of this project are to reduce sediment delivery by 40%, to improve in-stream habitat on 40% of identified critical areas and implement an information/education program. The project will install 3,800 acres of new no-till planting, 6 water and sediment control basins, 4,000 feet of terraces, 20,000 feet of improved or new waterways, 3,200 feet of streambank/ habitat enhancement, 4,500 feet of livestock exclusion fencing and 6 acres of wetlands.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With this application, the College Creek sub-watershed in Ames represents both regional collaboration and locally directed action to improve an Iowa watershed. Already completed watershed assessment identified more than 4000 tons/yr of sediment delivered from within the Ames city limits due to degraded stream conditions. The water quality enhancement goal of this project is reducing sediment delivery specifically from unstable streambanks and degrading stream channels on College Creek, one of 4 Ames tributaries to Squaw Creek. The project will also redirect urban storm water runoff into engineered infiltration systems, intercepting it from storm drains entering College Creek. This application builds on storm water runoff demonstration projects and research already funded in the College Creek sub-watershed by EPA Region 7 and Iowa DNR. Public outreach, one of the key elements of this project, is built into every phase from engineering design feedback to construction. Innovative neighborhood learning circles are utilized to educate residents and share public feedback with project engineers to ensure that project elements are both technically appropriate and socially acceptable. All practices proposed in this project -stream stabilization, storm water infiltration, and neighborhood learning circle techniques-have already been successfully demonstrated in the College Creek sub-watershed by the City of Ames in partnership with Iowa State University.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Lost Island Lake watershed is located in the prairie pothole region, a region dotted with glacial wetlands and shallow lakes. At 1,180 acres, Lost Island Lake is the state's fifth largest natural lake and its watershed is comprised of nearly 1,000 acres of wetland habitat, including Iowa 's largest natural wetland – Barringer Slough. Unfortunately, Lost Island and its associated wetlands are not functioning to their fullest ecological and water quality potential. In 2002 and 2004, Lost Island Lake was categorized as '·impaired'" on Iowa's Impaired Waters List. Frequent algal blooms and suspended solids drastically increase turbidity levels resulting in its impairment. To investigate these concerns, a two-year study and resulting Water Quality Improvement Plan were completed. The water quality study identified an overabundance of non-native common carp (Cyprinus carpio) in the lake and its surrounding wetlands as a primary cause of impairment. The goal of the Lost Island Lake Watershed Enhancement Project is to restore ecological health to Lost Island Lake and its intricate watershed resulting in improved water quality and a diverse native plant and wildlife community. The purpose of this grant is to obtain funding for the construction of two combination fish barriers and water control structures placed at key locations in the watershed within the Blue Wing Marsh complex. Construction of the fish barriers and water control structures would aid restoration efforts by preventing spawning common carp from entering wetlands in the watershed and establishing the ability to manage water levels in large wetland areas. Water level management is crucial in wetland health and exotic fish control. These two structures are part of a larger construction project that involves a total of four combination fish barriers and water control structures and one additional fish barrier. The entire Lost Island Lake Watershed Enhancement Project is a multi-year project, but the construction phase for the fish barriers and water control structures will be completed before December 31, 2011.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Brushy Creek is a tributary of the Raccoon River, which is a regular source of drinking water for over 400,000 Iowans. Regular monitoring by Des Moines Water Works (DMWW) and Agriculture’s Clean Water Alliance (ACWA) over the last eight years has shown the stream to be highly impaired for coliform bacteria and nitrate. Both Brushy Creek and the Raccoon River are on the 303(d) impaired waterbody list. A December 2005 fish kill in Brushy Creek resulted in administrative actions against seven livestock producers. Several open feed lots exist in the watershed. The community of Roselle (in the Brushy Creek watershed) has been identified by IDNR as unsewered, and many dwellings throughout the watershed discharge untreated human waste. No Watershed Improvement Association (WIA) exists in this sparsely-populated area. This outcome-based project will: • Enhance nutrient and manure management to reduce agricultural inputs to the stream. • Assess the amount of human waste reaching the stream from Roselle. • Engage and inform local residents so a WIA can be formed. • Monitor performance through a rigorous water and soil testing program. This project embraces a concept of participation from all levels of government, commodity organizations, and the private sector. The largest drinking water utility in the state will lead and administer this effort. The participating parties will work to establish a functioning WIA so that progress achieved through this project will be robust and long-lasting. The participants believe this will be the most effective approach to correct the situation, and will serve as a model for other problem watersheds throughout the state.