996 resultados para Surrey, County of
Resumo:
Approximately 40,000 tons of slightly damaged asphalt concrete has been removed from Interstate 80 in Cass and stockpiled. Laboratory tests had indicated that this material had considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all new material. Follow~up evaluations will be made to determine the effects of traffic and environment. Preliminary data indicate that plans should be made to incorporate the stockpiled material in projects near the stockpile site.
Resumo:
The earliest overall comprehensive work on the use of fly ash in concrete was reported by Davis and Associates of the University of California in 1937. Since that time, there have been numerous applications of the use and varying propertions of fly ash in portland cement concrete mixes. Fly ash is a pozzolanic powdery by-product of the coal combustion process which is recovered from flue gases and is, generally associated with electric power generating plants. Environmental regulations enacted in recent years have required that fly ash be removed from the flue gases to maintain clean air standards. This has resulted in an increased volume of high quality fly ash that is considered a waste product or a by-product that can be utilized in products such as portland cement concrete. There are several sources of the high quality fly ash located in Iowa currently producing a combined total of 281,000 tons of material annually.
Resumo:
This is an overview of the program that the General Assembly of Iowa appropriated $1 million for to the Iowa Department of Veterans Affairs with the intent to improve delivery services by the various County Commissions of Veterans Affairs to veterans in their respective counties.
Resumo:
Report on a special investigation of the Mahaska County Soil and Water Conservation District for the period March 24, 2006 through August 31, 2013
Resumo:
Report on a special investigation of the Monona County Auditor’s Office for the period January 1, 2011 through December 31, 2013
Resumo:
Special investigation of the Iowa County Treasurer’s Office for the period January 1, 2005 through June 30, 2011
Resumo:
Special investigation of the Sac County Treasurer’s Office Motor Vehicle Department for the period January 1, 2010 through February 27, 2014
Resumo:
Report on the Iowa Judicial Branch – County Clerks of District Courts, a part of the State of Iowa, for the year ended June 30, 2013
Resumo:
This report contains a general colored soil map of Boone County and information on the county's soil physiology, drainage and fertility. It also includes information on field experiments, rotation of crops, prevention of erosion, soil types and other vital soil information in Boone County.
Resumo:
The Iowana Farms Milk Company factory building was considered to retain sufficient integrity and possess sufficient significance to be considered eligible for the National Register of Historic Places under Criteria A and C for its historical and architectural significance in the Bettendorf community. The Iowana Farms Milk Company was an important early to mid-twentieth-century business in Bettendorf, and was among the few that was not owned or operated by the Bettendorf Company. It was a strong and thriving business for many years, and its products were well known in the Quad Cities region. The importance of this property becomes even more significant when one considers that most of the buildings once associated with the actual Bettendorf Company, which was undeniably the most important business and industry in town, are now gone. As a result, the Iowana Farms Milk Company factory building was a physical vestige of the once-thriving commercial industries that made Bettendorf into a city in the twentieth century. This property was further significant for its representation of the evolution of the dairy industry in the twentieth century from farm to factory production. It also reflected the changes to the industry based on scientific discoveries, mechanical innovations, and governmental regulations related to improved sanitation and the pure milk movement. The Iowana Farms Milk Company represented a model plant for the time, and the marketing strategies it employed followed the trends of the industry. The Iowana Farms Milk Company plant had to be removed to make room for a new I-74 bridge over the Mississippi River at Bettendorf. The construction of the new bridge also required removal of the historic Iowa-Illinois Memorial Bridge. The documentation reported herein and for that of the Iowa-Illinois Memorial Bridge fulfills the requirements of the Memorandum of Agreement regarding the removal of these historic properties.
Resumo:
Audit report on the Waste Authority of Jackson County for the year ended June 30, 2014
Resumo:
The purposes of this report are to delineate and describe aquifers in Cerro Gordo County, evaluate the availability and quality of water in the aquifers, supply data on ground-water utilization, and determine the rate of growth and the magnitude of the cone of drawdown in the Mason City area. It includes photos and fold-out maps
Resumo:
The availability of large quantities of high-quality ground water from the Muscatine Island aquifer has had a tremendous impact upon urban, industrial and agricultural development of this part of Iowa. Although the nonpumping level of water has been lowered significantly near major pumping centers through time, proper management of this water resource can assure a continued supply of water for all competing users. This report provides basic information for long range management. Fold out maps are included.
Resumo:
The Greene County, Iowa, overlay project, completed in October 1973, was evaluated in October 1978, after five years in October 1983, after ten years and most recently in October 1988 after fifteen years of service. The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 to 100. The rating was conducted by original members of the Project Planning Committee, Iowa DOT, Iowa County, Federal Highway Administration and industry representatives. In all, there were 23, 25 and 17 representatives who rated the project in 1978, 1983 and 1988 respectively. The 23, 25 or 17 values were then averaged to provide a final rating number for each section or variable. All experimental overlay sections had performed quite well in the period from five through 15 years, experiencing only limited additional deterioration.
Resumo:
The Greene County, Iowa, overlay project, completed in October, 1973, was evaluated in October, 1978, after five years of service and most recently in October, 1983, after ten years of service. The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 to 100. The rating was conducted by original members of the Project Planning Committee, Iowa DOT, Iowa County, Federal Highway Administration, University of Illinois and industry representatives. In all, there were 23 and 24 representatives who rated the project in 1978 and 1983 respectively. The 23 or 24 values were then averaged to provide a final rating number for each section or variable. All experimental overlay sections had performed quite well in the period from five through 10 years, experiencing only limited additional deterioration. Based upon this relatively good performance through 10 years, the sections will be maintained for further research with another evaluation at 15 years. The 4" thick nonfibrous mesh reinforced continuous reinforced concrete pavement overlay sections provided the best performance in this research project. Another nonfibrous 5" thick bar reinforced overlay section performed almost as well. The best performance of a fibrous reinforced concrete section was obtained with 160 pounds of fiber per cubic yard.