1000 resultados para Railway heritage


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study of lateral dynamics of running trains on bridges is of importance mainly for the safety of the traffic, and may be relevant for laterally compliant bridges. These studies require 3D coupled vehicle-bridge models, and consideration of wheel to rail contact, a phenomenon which is complex and costly to model in detail. We describe here a fully nonlinear coupled model, described in absolute coordinates and incorporated into a commercial finite element framework. Two applications are presented, firstly to a vehicle subject to a strong wind gust traversing a br idge, showing the relevance of the nonlinear wheel-rail contact model as well as the interaction between bridge and vehicle. The second application is to a real viaduct in a high-speed line, with a long continuous deck and tall piers with high lateral compliance. The results show the safety of the traffic as well as the relevance of considering the wind action and the nonlinear response.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The commercial centre VIALIA and the new railway station of the AVE (high speed train) in Malaga was inaugurated in November 2006, just on the place of the former railway station. The new railway station with an investment of 134,7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal and commercial centre of Spain which comprises a parking of 21.000 m2 for 1300 parking places, one commercial area and a hotel with a total extension constructed of approximately 100.000 m2. The spaces of leisure contain cinemas, shops, restaurants, bowling, gymnasium, swimming pool and zones of passenger's traffic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The physical model based on moving constant loads is widely used for the analysis of railway bridges. Nevertheless, this model is not well-suited for the study of short span bridges (L<=15-20 m), and the results it produces (displacements and accelerations) are much greater than those obtained experimentally. In this paper two factors are analysed which are believed to have an influence in the dynamic behaviour of short bridges. These two factors are not accounted for by the moving loads model and are the following: the distribution of the loads due to the presence of the sleepers and ballast layer, and the train-bridge interaction. Several numerical simulations have been performed in order to decide on their influence, and the results are presented and discussed herein.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cultural heritage is a complex and diverse concept, which brings together a wide domain of information. Resources linked to a cultural heritage site may consist of physical artefacts, books, works of art, pictures, historical maps, aerial photographs, archaeological surveys and 3D models. Moreover, all these resources are listed and described by a set of a variety of metadata specifications that allow their online search and consultation on the most basic characteristics of them. Some examples include Norma ISO 19115, Dublin Core, AAT, CDWA, CCO, DACS, MARC, MoReq, MODS, MuseumDat, TGN, SPECTRUM, VRA Core and Z39.50. Gateways are in place to fit in these metadata standards into those used in a SDI (ISO 19115 or INSPIRE), but substantial work still remains to be done for the complete incorporation of cultural heritage information. Therefore, the aim of this paper is to demonstrate how the complexity of cultural heritage resources can be dealt with by a visual exploration of their metadata within a 3D collaborative environment. The 3D collaborative environments are promising tools that represent the new frontier of our capacity of learning, understanding, communicating and transmitting culture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behaviour has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge in order to achieve safe and cost-effective structures. As ballast operations are a key life cycle cost, and excessive vibrations increase the need of ballast regulation in order to ensure track geometry, special attention is paid to accelerations, the values of which should be limited to avoid track instability according to Eurocode. In this paper, the data obtained during on site measurements on culverts belonging to a Spanish high-speed train line are presented. A set of six rectangular-shaped, closed-frame underpasses were monitored under traffic loading. Acceleration records at different points of the structures are presented and discussed. They reveal a non-uniform dynamic response of the roof-slab, with the highest observed values below the occupied track. Also, they indicate that the dynamic response is important up to frequencies higher than those usually observed for standard simply supported bridges. Finally, they are used to obtain a heuristic rule to estimate acceleration levels on the roof-slab.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the results of part of the research carried out by a committee in charge of the elaboration of the new Spanish Code of Actions in Railway Bridges. Following the work developed by the European Rail Research Institute (ERRI), the dynamic effects caused by the Spanish high-speed train TALGO have been studied and compared with other European trains. A simplified envelope of the impact coefficient is also presented. Finally, the train-bridge interactions has been analysed and the results compared with those obtained from simple models based on moving loads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An actual case of an underground railway in the neighbourhood of habitation buildings has been analyzed. The study has been based on a twodimensional BEM model including a tunnel and a typical building. The soil properties were obtained using geophysical techniques. After a sensitivity study, the model has been simplyfied and validated by comparison with "in situ" measurements. Using this simplyfied model, a parametric study has been done including trenches and walls of different materials and different depths at two different distances from the tunnel. The reductions obtained with the different solutions can then be compared.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo San Francisco-Sacramento. Este artículo de la serie “Alta velocidad Ferroviaria en California (CHSRS), se ocupa de la línea San Francisco– Sacramento “Bay Crossing Alternative”, que cierra la red de alta velocidad ferroviaria del Estado de California, permitiendo en la terminal HSR de Sacramento, conectar con la línea Fresno–Sacramento, en coincidencia de trazados para en el futuro prolongar la red californiana de alta velocidad ferroviaria hasta su entronque con la del Estado de Nevada, vía Tahoe Lake–Reno. La línea San Francisco–Sacramento “Bay Crossing Alternative”, consta de tres trayectos: El primero de ellos “San Francisco urbano” va desde la terminal HSR “San Francisco Airport”, donde termina la alternativa “Golden Gate” de la línea Fresno–San Francisco, hasta el viaducto de acceso al Paso de la Bahía, que constituye el segundo trayecto “San Francisco–Richmond”, trayecto estrella de la red, de 15,48 Km de longitud sobre la Bahía de San Francisco, con desarrollo a través de 11,28 Km en puente colgante múltiple, con vanos de 800 m de luz y 67 m de altura libre bajo el tablero que permite la navegación en la Bahía. El tercer trayecto “Richmond–Sacramento” cruza la Bahía de San Pablo con un puente colgante de 1,6 Km de longitud y tipología similar a los múltiples de la Bahía de San Francisco, pasa por Vallejo (la por plazo breve de tiempo, antigua capital del Estado de California) y por la universitaria Davis, antes de finalmente llegar a la HSR Terminal Station de Sacramento Roseville. This article of the series “California High Speed Railway System”(CHSRS) treats on Line San Francisco–Sacramento “Bay Crossing Alternative” (BCA). This line closes the system of California high speed state railway, and connects with the line Fresno–Sacramento “Stockton Arch Alternative”, joining its alignments in the HSR Terminal of Sacramento Roseville. From this station it will be possible, in the future, to extend the Californian railway system till the Nevada railway system, vía Tahoe Lake and Reno. The BCA consists of three sections: The first one passing through San Francisco city, goes from HSR San Francisco Airport Terminal Station (where the line Fresno–San Francisco “Golden Gate Alternative” ends), up to the Viaduct access at the Bay Crossing. The second section San Francisco–Richmond, constitutes the star section of the system, with 15,48 Km length on the San Francisco Bay, where 11,28 Km in multi suspension bridge, 800 m span and 67 m gauge under panel, to allow navigation through the Bay. The third section Richmond–Sacramento crosses the San Pablo Bay through another suspension bridge of similar typology to that of San Francisco Bay crossing; pass through Vallejo (the ancient and for a short time Head of the State of California) and through Davis, university city, to arrive to the HSR Terminal Station of Sacramento Roseville.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Sacramento. El presente articúlo es la cuarta parte de la serie "Alta Velocidad Ferroviaria en California (CHSRS)". Recoge la Alternativa "Stockton Arch", que el Proyecto FARWEST presenta a la prevista por la Authority (CHSRA), para la Línea HSR Fresno-Sacramento, en programación y en trazado. Éste discurre, desde la gran Terminal de Fresno (implantada en las afueras al suroeste de la ciudad) por el segmento sur del "mar interior" (que en el Terciario Superior ocupaba el actual Valle Central), hasta Stockton, y por el segmento norte, hasta Sacramento. El Paet de Ripperdan (~ pK 40) queda conectado por carretera con el PAET de Oroloma de la Línea HSR Fresno-San Francisco (Golden Gate Alternative). La última parte del trazado de la Línea HSR Fresno-Sacramento (Stockton Arch Alternative), coincide en alineación y rasante con la Línea HSR San Francisco-Sacramento (Crossing Bay Alternative) a la altura de Roseville, donde se emplaza la gran terminal norte de la red de California, desde la que se unirá ésta con la de Nevada, por Reno. This article forras the fourth part of the series entitled "High Speed Railway in California (CHSRS)". It addresses the "Stockton Arch" alternative, which the FARWESTProjectpresents in scheduling and in alignment as to that provided for by the Authority (CHSRA) for the Fresno-Sacramento HSR Line. The latter runs from the grand Fresno Terminal (located in the outskirts to the southwest ofthe city) through the south segment ofthe "inland sea" (which oceupied the current Central Valley in the Upper Tertiary) to Stockton and through the north segment to Sacramento. The Ripperdan TSAP (post ofpassing and stabling trains), — kilometer point 40, conneets with the Oroloma TSAP ofthe Fresno-San Francisco HSR Line (Golden Gate Alternative) by road. The last part of the Fresno-Sacramento HSR Line alignment (Stockton Arch Alternative), coincides in alignment and grade with the San Francisco-Sacramento HSR Line (Crossing Bay Alternative) at Roseville, where the great north terminal ofthe California network is located, from which the latter will be linked with Nevada s network through Reno.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Los Angeles-San Diego. Este artículo, tercera parte de la serie que describe la red de Alta Velocidad Ferroviaria de California (CHSRS), se ocupa de la línea Fresno-Los Angeles Airport-San Diego Airport, con el trazado propuesto en la Alternativa Missions Trail del Proyecto FARWEST, caracterizada por el paso directo de las montañas de Tehachapi, mediante dos grandes túneles de 27,5 Km (17 mile) y 25,6 Km (15,9 mile) de longitud. También por el emplazamiento de la estación terminal de Los Angeles, junto al Aeropuerto Internacional de Los Angeles y la sustitución de la circunvalación ferroviaria de la aglomeración urbana de Los Angeles, a través de Inland Empire, por el ramal Anaheim-Riverside, que da acceso a esa región, y que es cabecera de la futura Dessert Express a Las Vegas. The third of a series describing the California High Speed Railway (CHSRS), this article refers to the Fresno-Los Angeles Airport-San Diego Airport line, with the alignment as proposed in the Missions Trail Alternative of the FARWEST Project, characterized by the direct Tehachapi mountain pass through two large tunnels 27.5 Km (17 miles) and 25.6 Km (15.9 miles) long and also to the siting of the Los Angeles terminal station next to the Los Angeles International Airport and the replacement of the Los Angeles urban conglomeration railway by-pass through Inland Empire, by the Anaheim-Riverside branch providing access to that region and which is the head of the future Desert Express to Las Vegas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The new railway station of María Zambrano for AVE (Spanish high-speed trains) located in Malaga, has been inaugurated in November 2006, just on the site of the former railway station. The new railway station with an investment of 134.7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal transport and commercial center of Spain which comprises a parking of 21,000 m2 for 1,300 parking places, one commercial area and a hotel of 35 m height, with a total extension constructed of approximately 100,000 m2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a crosswind scenario, the risk of high-speed trains overturning increases when they run on viaducts since the aerodynamic loads are higher than on the ground. In order to increase safety, vehicles are sheltered by fences that are installed on the viaduct to reduce the loads experienced by the train. Windbreaks can be designed to have different heights, and with or without eaves on the top. In this paper, a parametric study with a total of 12 fence designs was carried out using a two-dimensional model of a train standing on a viaduct. To asses the relative effectiveness of sheltering devices, tests were done in a wind tunnel with a scaled model at a Reynolds number of 1 × 105, and the train’s aerodynamic coefficients were measured. Experimental results were compared with those predicted by Unsteady Reynolds-averaged Navier-Stokes (URANS) simulations of flow, showing that a computational model is able to satisfactorily predict the trend of the aerodynamic coefficients. In a second set of tests, the Reynolds number was increased to 12 × 106 (at a free flow air velocity of 30 m/s) in order to simulate strong wind conditions. The aerodynamic coefficients showed a similar trend for both Reynolds numbers; however, their numerical value changed enough to indicate that simulations at the lower Reynolds number do not provide all required information. Furthermore, the variation of coefficients in the simulations allowed an explanation of how fences modified the flow around the vehicle to be proposed. This made it clear why increasing fence height reduced all the coefficients but adding an eave had an effect mainly on the lift force coefficient. Finally, by analysing the time signals it was possible to clarify the influence of the Reynolds number on the peak-to-peak amplitude, the time period and the Strouhal number.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper assesses the main challenges associated with the propagation and channel modeling of broadband radio systems in a complex environment of high speed and metropolitan railways. These challenges comprise practical simulation, modeling interferences, radio planning, test trials and performance evaluation in different railway scenarios using Long Term Evolution (LTE) as test case. This approach requires several steps; the first is the use of a radio propagation simulator based on ray-tracing techniques to accurately predict propagation. Besides the radio propagation simulator, a complete test bed has been constructed to assess LTE performance, channel propagation conditions and interference with other systems in real-world environments by means of standard-compliant LTE transmissions. Such measurement results allowed us to evaluate the propagation and performance of broadband signals and to test the suitability of LTE radio technology for complex railway scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Until recently, cinematographic film was largely cellulose-triacetate-based. However, this material is highly susceptible to biodeterioration, thus placing historic film collections, an important part of the cultural heritage of many countries, at risk. In the present study, samples taken from several biodeteriorated color cinematographic films belonging to the collection of the Cuban Institute for Cinematographic Industry and Arts (ICAIC) were investigated. Infrared spectroscopy showed that all films were of the same composition, i.e., a gelatin emulsion coating one side of a cellulose-triacetate-based film support. The films were analyzed by environmental scanning electron microscopy and scanning electron microscopy to determine the degree of biodeterioration and the type of colonizing microorganisms. Significant fungal colonization was found on both sides of the films in all samples, with a higher concentration of fungi on the gelatin emulsion side. Epifluorescence microscopy of fluorochrome-dyed films demonstrated that some of the fungi were still active, indicating that the films under study, and probably others at the ICAIC, are at risk of further deterioration. Fungi were identified by molecular biology techniques. The fungi mainly responsible for the observed biodeterioration were those belonging to the genera Aspergillus and Cladosporium, although other genera, such as Microascus and Penicillium, were identified as well. In accordance with the findings described herein, the existing guidelines for the prevention and control of film biodeterioration are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper the main challenges associated with the migration process towards LTE, will be assessed. These challenges comprise, among others, the next key topics: Reliability, Availability Maintainability and Safety (RAMS) requirements, end to end Quality of Service (QoS) requirements, system performance in high speed scenarios, communication system deployment strategy, and system backward compatibility as well as the future system features for delivering railway services. The practical evaluation of the LTE system capabilities and performance in High Speed Railway (HSR) scenarios, require the development of an LTE demonstrator and an LTE system level simulator. Under this scope, the authors have developed an RF LTE demonstrator, as well as an LTE system level simulator, that will provide valuable information for the assessing of LTE performance and suitability in real HSR scenarios. This work is being developed under the framework of a research project to evaluate the feasibility of LTE to become the new railway communication system. The companies and universities involved in this project are: Technical University of Madrid (UPM), Alcatel Lucent Spain, ADIF (Spanish Railway Infrastructure Manager), Metro de Madrid, AT4 Wireless, the University of A Coruña (UDC) and University of Málaga (UMA).