973 resultados para Railway Architectured


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Culverts are very common in recent railway lines. Wild life corridors and drainage conducts often fall in this category of partially buried structures. Their dynamic behavior has received far less attention than other structures such as bridges but its large number makes that study an interesting challenge from the point of view of safety and savings. In this paper a complete study of a culvert, including on-site measurements as well as numerical modelling, will be presented. The structure belongs to the high speed railway line linking Segovia and Valladolid, in Spain. The line was opened to traffic in 2004. Its dimensions (3x3m) are the most frequent along the line. Other factors such as reduced overburden (0.6m) and an almost right angle with the track axis make it an interesting example to extract generalized conclusions. On site measurements have been performed in the structure recording the dynamic response at selected points of the structure during the passage of high speed trains at speeds ranging between 200 and 300km/h. The measurements by themselves provide a good insight into the main features of the dynamic behaviour of the structure. A 3D finite element model of the structure, representing its key features was also studied as it allows further understanding of the dynamic response to the train loads . In the paper the discrepancies between predicted and measured vibration levels will be analyzed and some advices on numerical modelling will be proposed

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The prediction of train induced vibration levels in structures close to railway tracks before track construction starts is important in order to avoid having to implement costly mitigation measures afterwards. The used models require an accurate characterization of the propagation medium i.e. the soil layers. To this end the spectral analysis of surface waves (SASW) method has been chosen among the active surface waves techniques available. As dynamic source a modal sledge hammer has been used. The generated vibrations have been measured at known offsets by means of several accelerometers. There are many parameters involved in estimating the experimental dispersion curve and, later on, thickness and propagation velocities of the different layers. Tests have been carried out at the Segovia railway station. Its main building covers some of the railway tracks and vibration problems in the building should be avoided. In the paper these tests as well as the influence of several parameters on the estimated soil profile will be detailed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Communications Based Train Control Systems require high quality radio data communications for train signaling and control. Actually most of these systems use 2.4GHz band with proprietary radio transceivers and leaky feeder as distribution system. All them demand a high QoS radio network to improve the efficiency of railway networks. We present narrow band, broad band and data correlated measurements taken in Madrid underground with a transmission system at 2.4 GHz in a test network of 2 km length in subway tunnels. The architecture proposed has a strong overlap in between cells to improve reliability and QoS. The radio planning of the network is carefully described and modeled with narrow band and broadband measurements and statistics. The result is a network with 99.7% of packets transmitted correctly and average propagation delay of 20ms. These results fulfill the specifications QoS of CBTC systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this work a methodology for analysing the lateral coupled behavior of large viaducts and high-speed trains is proposed. The finite element method is used for the structure, multibody techniques are applied for vehicles and the interaction between them is established introducing wheel-rail nonlinear contact forces. This methodology is applied for the analysis of the railway viaduct of the R´ıo Barbantino, which is a very long and tall bridge in the north-west spanish high-speed line.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Escalator and moving walkway are multibody systems with a design of more than a century. Developed methodology allows studying and improving any subsystem of both systems. In addition, new concepts can be developed and tested without the necessity and cost of a real construction. CITEF (Railway Technologies Research Centre) has been modelling escalators for more than four years. Several complex and innovative models has been developed to characterize static, kinematic and dynamic escalator behaviour. The high number of mechanical elements that are part of escalators complicate modelling task. In this way, methodologies and tools have been developed in order to automate these task and saving computational and time costs. Developed methodologies have been validated with the results of comparing real measurements and simulated outputs from a dynamic model.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este proyecto desarrolla una metodología de toma de datos y análisis para la optimización de la producción de la fase de avance de construcción del túnel de Seiró. Este túnel forma parte de las obras de construcción de la línea ferroviaria de alta velocidad corredor norte-noroeste a su paso por la provincia de Ourense. Mediante el análisis de diversos parámetros del diseño de la voladura, en la construcción de un túnel de 73 m2 de sección, en roca granítica, se pretende optimizar el tiempo de ciclo de excavación. Se estudia la variación de la fragmentación, el contorno y el avance obtenido y la influencia sobre estos parámetros del esquema de tiro y el tipo de cuele empleados y sus repercusiones en el tiempo de ciclo. El resultado del análisis concluye que el esquema de tiro óptimo, entre los usados, está formado por 112 barrenos de 51 mm de diámetro, con un cuele de 4 barrenos vacíos, que da lugar a mejores resultados de avance, contorno y fragmentación sin afectar negativamente al tiempo de ciclo. ABSTRACT This project develops a methodology for excavation cycle optimization by collecting and analyzing operational data for Seiró Tunnel construction site. This tunnel is included in construction project of high speed railway, located in N-NW direction, in Ourense province. Analyzing several blasting design parameters from the construction of a 73 m2 tunnel, in granitic rock, allows the optimization of cycle time. Variations in fragmentation, contour and advance length and influence about those parameters from blasting design und cut type used and its impact in the cycle time. Analysis results show up the best blasting design, among used, is formed of 112 holes 51 mm diameter, and a parallel cut with 4 empty holes. This configuration achieves the best fragmentation, contour and advance length without negative effects in time cycle

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper focuses on the railway rolling stock circulation problem in rapid transit networks, in which frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The main complicating issue is the fact that the available capacity at depot stations is very low, and both capacity and rolling stock are shared between different train lines. This forces the introduction of empty train movements and rotation maneuvers, to ensure sufficient station capacity and rolling stock availability. However, these shunting operations may sometimes be difficult to perform and can easily malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operation will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Critic trains, defined as train services that come through stations that have a large number of passengers arriving at the platform during rush hours, are also introduced. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results of the model, achieved in approximately 1 min, have been received positively by RENFE planners

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The aim of this paper is to propose an integrated planning model to adequate the offered capacity and system frequencies to attend the increased passenger demand and traffic congestion around urban and suburban areas. The railway capacity is studied in line planning, however, these planned frequencies were obtained without accounting for rolling stock flows through the rapid transit network. In order to provide the problem more freedom to decide rolling stock flows and therefore better adjusting these flows to passenger demand, a new integrated model is proposed, where frequencies are readjusted. Then, the railway timetable and rolling stock assignment are also calculated, where shunting operations are taken into account. These operations may sometimes malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operations will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Swapping operations will also be ensured using homogeneous rolling stock material and ensuring parkings in strategic stations. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results show that through this integrated approach a greater robustness degree can be obtained

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behavior has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge from the viewpoint of safety and cost savings. Here, we present a complete study of a culvert, including on-site measurements and numerical modeling. The studied structure belongs to the high-speed railway line linking Segovia and Valladolid in Spain. The line was opened to traffic in 2004. On-site measurements were performed for the structure by recording the dynamic response at selected points of the structure during the passage of high-speed trains at speeds ranging between 200 and 300 km/h. The measurements provide not only reference values suitable for model fitting, but also a good insight into the main features of the dynamic behavior of this structure. Finite element techniques were used to model the dynamic behavior of the structure and its key features. Special attention is paid to vertical accelerations, the values of which should be limited to avoid track instability according to Eurocode. This study furthers our understanding of the dynamic response of railway underpasses to train loads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The analysis of modes and natural frequencies is of primary interest in the computation of the response of bridges. In this article the transfer matrix method is applied to this problem to provide a computer code to calculate the natural frequencies and modes of bridge-like structures. The Fortran computer code is suitable for running on small computers and results are presented for a railway bridge.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The vertical dynamic actions transmitted by railway vehicles to the ballasted track infrastructure is evaluated taking into account models with different degree of detail. In particular, we have studied this matter from a two-dimensional (2D) finite element model to a fully coupled three-dimensional (3D) multi-body finite element model. The vehicle and track are coupled via a non-linear Hertz contact mechanism. The method of Lagrange multipliers is used for the contact constraint enforcement between wheel and rail. Distributed elevation irregularities are generated based on power spectral density (PSD) distributions which are taken into account for the interaction. The numerical simulations are performed in the time domain, using a direct integration method for solving the transient problem due to the contact nonlinearities. The results obtained include contact forces, forces transmitted to the infrastructure (sleeper) by railpads and envelopes of relevant results for several track irregularities and speed ranges. The main contribution of this work is to identify and discuss coincidences and differences between discrete 2D models and continuum 3D models, as wheel as assessing the validity of evaluating the dynamic loading on the track with simplified 2D models

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The bridge over the Mittellandkanal is located in the municipality of Braunschweig, a city of Low Saxony located in Mid-North Germany, between Berlin and Hannover, 50 km away from this last city. The city of Braunschwig has 248.867 inhabitants (December 2010). The orography of the zone is practically even, with some slopes in the surrounding area, with a no important variation of the ground elevation, characterized by a big uniformity and a great visual quality. In this zone the canal flows from west to east, from the Dortmundkanal until the Elbe river, so it has a length of 325,3 km. The normal flora from the zone is farmland with some little forests not very big and not very important. But the Mittellandkanal lies at the North of Brauschweig, that means that in the zone of the canal there is a change between the urban area and the rural area. For this reason in the zone of the bridge we start to find farmlands and forest, however the constructions and buildings are still present in this area. The railway line that is going to be built will unite the North-center of Germany with the North-East of Germany because some of the following factors: •Overstress of the only existing line in the moment that connects Berlin with the North-East extreme of Germany. •No direct connection with the North-Easth Germany with other important German cities from South and West of Germany. •Replacement of the old existing one way line in the area that has to be renewed. •Modernization of the old railway lines of Germany. Schedule order by the European Union and the German Government. The actual lines of the zone do not have the necessary conditions and characteristics to satisfy the demand of the travelers that want to travel all over Germany with the railway avoiding using other transports like plan or car. For these reasons the necessity of the replacement of the old railway line and the aim to create a union with the North-East Germany that has a deficit of transport infrastructures and connections with the rest of the country and Europe. Although the new railway line provokes some disadvantages when constructing it is indispensable to build this railway line. The pass of the railway line through Braunschweig has not been random. The zone Braunschweig-Wolfsburg is a very industrialized area because of some companies like Wolkswagen and too because this zone is an important pass of important line from Berlin, South and East Germany. For all of these reasons the railway line goes through Braunschweig and connects to the city of Wolfsburg first, and after the North-East Germany zone.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

En las últimas décadas el aumento de la velocidad y la disminución del peso de los vehículos ferroviarios de alta velocidad ha provocado que aumente su riesgo de vuelco. Además, las exigencias de los trazados de las líneas exige en ocasiones la construcción de viaductos muy altos situados en zonas expuestas a fuertes vientos. Esta combinación puede poner en peligro la seguridad de la circulación. En esta tesis doctoral se estudian los efectos dinámicos que aparecen en los vehículos ferroviarios cuando circulan sobre viaductos en presencia de vientos transversales. Para ello se han desarrollado e implementado una serie de modelos numéricos que permiten estudiar estos efectos de una forma realista y general. Los modelos desarrollados permiten analizar la interacción dinámica tridimensional tren-estructura, formulada mediante coordenadas absolutas en un sistema de referencia inercial, en un contexto de elementos _nitos no lineales. Mediante estos modelos se pueden estudiar de forma realista casos extremos como el vuelco o descarrilamiento de los vehículos. Han sido implementados en Abaqus, utilizando sus capacidades para resolver sistemas multi-cuerpo para el vehículo y elementos finitos para la estructura. La interacción entre el vehículo y la estructura se establece a través del contacto entre rueda y carril. Para ello, se han desarrollado una restricción, que permite establecer la relación cinemática entre el eje ferroviario y la vía, teniendo en cuenta los posibles defectos geométricos de la vía; y un modelo de contacto rueda-carril para establecer la interacción entre el vehículo y la estructura. Las principales características del modelo de contacto son: considera la geometría real de ambos cuerpos de forma tridimensional; permite resolver situaciones en las que el contacto entre rueda y carril se da en más de una zona a la vez; y permite utilizar distintas formulaciones para el cálculo de la tensión tangencial entre ambos cuerpos. Además, se ha desarrollado una metodología para determinar, a partir de formulaciones estocásticas, las historias temporales de cargas aerodinámicas debidas al viento turbulento en estructuras grandes y con pilas altas y flexibles. Esta metodología tiene cuenta la variabilidad espacial de la velocidad de viento, considerando la correlación entre los distintos puntos; considera las componentes de la velocidad del viento en tres dimensiones; y permite el cálculo de la velocidad de viento incidente sobre los vehículos que atraviesan la estructura. La metodología desarrollada en este trabajo ha sido implementada, validada y se ha aplicado a un caso concreto en el que se ha estudiado la respuesta de un tren de alta velocidad, similar al Siemens Velaro, circulando sobre el viaducto del río Ulla en presencia viento cruzado. En este estudio se ha analizado la seguridad y el confort de la circulación y la respuesta dinámica de la estructura cuando el tren cruza el viaducto. During the last decades the increase of the speed and the reduction of the weight of high-speed railway vehicles has led to a rise of the overturn risk. In addition, the design requests of the railway lines require some times the construction of very tall viaducts in strong wind areas. This combination may endanger the traffic safety. In this doctoral thesis the dynamic effects that appear in the railway vehicles when crossing viaducts under strong winds are studied. For this purpose it has been developed and implemented numerical models for studying these effects in a realistic and general way. The developed models allow to analyze the train-structure three-dimensional dynamic interaction, that is formulated by using absolute coordinates in an inertial reference frame within a non-linear finite element framework. By means of these models it is possible to study in a realistic way extreme situations such vehicle overturn or derailment. They have been implemented for Abaqus, by using its capabilities for solving multi-body systems for the vehicle and finite elements for the structure. The interaction between the vehicle and the structure is established through the wheel-rail contact. For this purpose, a constraint has been developed. It allows to establish the kinematic relationship between the railway wheelset and the track, taking into account the track irregularities. In addition, a wheel-rail contact model for establishing the interaction of the vehicle and the structure has been developed. The main features of the contact model are: it considers the real geometry During the last decades the increase of the speed and the reduction of the weight of high-peed railway vehicles has led to a rise of the overturn risk. In addition, the design requests of the railway lines require some times the construction of very tall viaducts in strong wind areas. This combination may endanger the traffic safety. In this doctoral thesis the dynamic effects that appear in the railway vehicles when crossing viaducts under strong winds are studied. For this purpose it has been developed and implemented numerical models for studying these effects in a realistic and general way. The developed models allow to analyze the train-structure three-dimensional dynamic interaction, that is formulated by using absolute coordinates in an inertial reference frame within a non-linear finite element framework. By means of these models it is possible to study in a realistic way extreme situations such vehicle overturn or derailment. They have been implemented for Abaqus, by using its capabilities for solving multi-body systems for the vehicle and finite elements for the structure. The interaction between the vehicle and the structure is established through the wheel-rail contact. For this purpose, a constraint has been developed. It allows to establish the kinematic relationship between the railway wheelset and the track, taking into account the track irregularities. In addition, a wheel-rail contact model for establishing the interaction of the vehicle and the structure has been developed. The main features of the contact model are: it considers the real geometry